THE JOLON R ESIDENCE Construction Certificate - DA 492/2017 Consent Issued - 23 May 2018 SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road, Bondi Beach NSW 2026 L EGEND : DR A W ING LIST : BAL Balustr ade to BCA r equir ements CC_000 Cover Page CBD CF Cupboar d Concr ete floor, f inish to be polished CP Concr ete pavers CC_001 Location & Context Details CT Cer amic tiles FCC Fibr e cement cladding, matt paint f inish CC_002 Survey & Site Plans FD Fire door G Gutter CC_003 Existing & Demolition Second Floor Plan HR J Handr ail to BCA r equir ements Joiner y LB Letter Box CC_004 Approved Second Floor Plan MSC Metal sheet cladding MSR Metal sheet roof CC_005 Approved Attic Floor Plan OG Obscur e glazing P Par apet CC_006 Approved Roof & SWM Plan RB RWT Render ed brickwork Rainwater tank, to Hydr aulic engineer details TC Timber cladding CC_007 Approved Front & Rear Elevations TF Timber f loor ing TG Timber gate CC_008 Approved Side Elevation WA New w indow / door system, f inish TBA CC_009 Approved Section AA NB R3 Insulation to ceiling Foil Insulation to under side of roof CC_010 Construction Waste & Site Management Plan R1 Insulation to exterior walls Existing wall to be demolished Erosion, Sediment Control Plan Existing wall to be retained CC_011 BASIX Certificate & Notes New wall This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Cover Page Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_000 Drawn: AM Revision: B This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Location & Context Details Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_001 Drawn: AM Revision: B Survey Plan Site Plan This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Survey & Site Plans Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_002 Drawn: AM Revision: B All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost 1,750 1,750 1,375 1,750 1,750 3,626 550 2,494 550 as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of 23,575 600 consent letter issue 23 May 2018 There must be no encroachment of building 23,575 600 work or building materials onto council roads, footway, nature strip or public place to comply 290 6,480 230 2,100 230 2,100 140 3,325 140 2,270 140 2,500 140 3,200 290 600 with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be 600 600 contained within boundary lines and to comply 1,340 with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 290 Refer to SWRMP and CVPPM Line of new roof above shown dashed Line of new roof above shown dashed All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & 950 Study Bath Pantry A13 consent letter issued 23 May 2018 Kitchen CT Kitchen Bed 02 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent 3,860 Living Bed 01 L'dry letter issued 23 May 2018 2,500 6,265 5,860 Unit 08 Dining 81.10 m2 82.96 m2 Dining 140 TF Unit 09 2,075 1,860 Hall 115 230 115 Hall Living 82.96 m2 Dining Unit 07 SU Bed 01 Bed 02 L'dry M 5a M mer m Sum inds ER ng w cooli W L'dry 7: IN 30 Storage Bed 01 coo Sum TE am Bed 02 ling mer R bre eze Kitchen s Bath Study Bath Pantry 30° 7p MN m ° 20 4: Line of existing building envelope shown dashed Wi 30 co n N l d te r pm win ds AA Existing & Demolition Second Floor Plan This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Existing & Demolition Second Floor Plan Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_003 Drawn: AM Revision: B All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost 9,730 1,750 1,750 1,375 1,750 1,750 3,626 550 2,494 550 as detailed in the Cost Summary Report and to 330 comply with conditions B(7), B(8) & B(9) of 600 9,230 100 1,720 100 900 50 100 1,575 100 3,100 100 2,400 100 3,670 600 consent letter issue 23 May 2018 100 100 100 There must be no encroachment of building 600 9,230 100 550 750 500 750 550 400 775 400 550 750 500 750 550 600 1,800 100 3,670 600 work or building materials onto council roads, footway, nature strip or public place to comply 600 290 6,480 230 2,100 230 2,100 140 3,325 140 2,270 140 2,500 140 3,200 290 600 with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be 600 600 contained within boundary lines and to comply 1,340 with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 290 Refer to SWRMP and CVPPM Line of new roof above shown dashed Line of new roof above shown dashed All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & 950 Study Bath Pantry A13 consent letter issued 23 May 2018 Kitchen CT Kitchen Bed 02 Final Occupation Certificate to be Issued after 3,300 complying with conditions 16 & 17 of consent 3,860 Living Bed 01 L'dry letter issued 23 May 2018 2,500 6,265 Unit 08 600 C'bd Dining 81.10 m2 Living 82.96 m2 Dining 100 140 TF Unit 09 860 2,075 HR 1,860 Hall BAL 1,000 115 230 115 Hall Living 82.96 m2 Dining Unit 07 SU Bed 01 Bed 02 L'dry M 5a M mer m Sum inds ER ng w cooli W L'dry 7: IN 30 Storage Bed 01 coo Sum TE am Bed 02 ling mer R bre eze Kitchen s Bath Study Bath Pantry 30° 7p MN m ° 20 4: Line of existing building envelope shown dashed Wi 30 co n N l d te r pm win ds Approved Second Floor Plan This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Approved Second Floor Plan Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_004 Drawn: AM Revision: B All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost 9,805 1,750 1,750 1,375 1,750 1,750 3,728 448 2,494 550 as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of 600 9,305 100 2,720 10 370 100 1,575 100 3,100 100 2,400 100 3,670 600 consent letter issue 23 May 2018 100 100 100 There must be no encroachment of building 600 9,305 100 550 750 500 750 550 400 775 400 550 750 500 750 550 600 1,800 100 3,670 600 work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be 600 contained within boundary lines and to comply Line of existing building envelope shown dashed 1,340 with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 Existing Roof of consent letter issued 23 May 2018 100 890 890 To Be Retained Refer to SWRMP and CVPPM Line of new roof above shown dashed Line of new roof above shown dashed All scope of work to comply with conditions A1, 100 A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & 950 800 A13 consent letter issued 23 May 2018 HR BAL Final Occupation Certificate to be Issued after 100 complying with conditions 16 & 17 of consent letter issued 23 May 2018 Balcony 3,200 Fall 5.43 m2 2,300 sh of 6,265 ed da ro Bath n ng ow sti sh xi CT Rumpus Bed 03 e fe ov o ab ine L 4,575 100 100 HR 850 TF BAL C'bd 1,860 Existing Roof 1,000 10 To Be Retained 2 36.96 m Existing Roof 115 Fall To Be Retained Fall Fall 230 115 SU M Existing Roof 5a M Fall Fall mer m To Be Retained Sum inds ER ng w cooli W 7: IN 30 coo Sum TE am ling mer R bre eze s 30° 7p MN m ° 20 4: Line of existing building envelope shown dashed Wi 30 co n N l d te r pm win ds Approved Attic Floor Plan This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Approved Attic Floor Plan Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_005 Drawn: AM Revision: B All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost 9,805 1,750 1,750 1,375 1,750 1,750 3,728 448 2,494 550 as detailed in the Cost Summary Report and to 330 comply with conditions B(7), B(8) & B(9) of 600 9,305 100 1,720 100 900 50 100 1,575 100 3,100 100 2,400 100 3,670 600 consent letter issue 23 May 2018 100 100 100 There must be no encroachment of building 600 9,305 100 550 750 500 750 550 400 775 400 550 750 500 750 550 600 1,800 100 3,670 600 work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be 600 contained within boundary lines and to comply Line of existing building envelope shown dashed 1,340 with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 Existing Roof of consent letter issued 23 May 2018 100 890 890 To Be Retained Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, 100 A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & 950 800 A13 consent letter issued 23 May 2018 HR G BAL Final Occupation Certificate to be Issued after 100 complying with conditions 16 & 17 of consent letter issued 23 May 2018 Bed 03 TD 3,200 Fall Fall Fall Fall Fall Balcony 2,300 MSR 2,825 6,265 5.43 m2 100 100 50 860 HR TF BAL C'bd 1,860 Existing Roof 1,750 To Be Retained 115 950 S1 Bath 37.00 m 2 Existing Roof Fall To Be Retained Fall Fall 230 115 SU M Existing Roof 5a M Fall Fall mer m To Be Retained Sum inds ER ng w cooli W 7: IN 30 coo Sum TE am ling mer R bre eze s 30° 7p MN m ° 20 4: Line of existing building envelope shown dashed Wi 30 co n N l d te r pm win ds Approved Roof & SWM Plan This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Approved Roof & SWM Plan Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_006 Drawn: AM Revision: B All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 742 742 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 27 27 130 G G of consent letter issued 23 May 2018 130 Refer to SWRMP and CVPPM 500 DW1 TW W7 3,000 3,000 TW TC TC All scope of work to comply with conditions A1, 1,200 700 A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 225 900 225 900 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 350 350 125 125 3,010 3,010 2,760 2,760 250 250 Approved South Elevation Approved North Elevation This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Approved Front & Rear Elevations Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_007 Drawn: AM Revision: B All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 742 All demolition & required excavation to be S1 contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 27 TC TC MSR G of consent letter issued 23 May 2018 130 Refer to SWRMP and CVPPM W1 W2 W3 W4 W5 3,000 FCC TW TC TW FCC TW TW TC TW All scope of work to comply with conditions A1, 1,200 HR A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & BAL A13 consent letter issued 23 May 2018 475 425 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 225 350 125 3,010 2,760 250 Approved East Elevation This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Approved Side Elevation Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_008 Drawn: AM Revision: B All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 300 All demolition & required excavation to be 450 contained within boundary lines and to comply 150 with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 100 350 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM 1,650 W6 TW All scope of work to comply with conditions A1, 1,200 A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & Bed 03 A13 consent letter issued 23 May 2018 475 425 Final Occupation Certificate to be Issued after 900 complying with conditions 16 & 17 of consent letter issued 23 May 2018 225 350 125 Unit 07 Unit 08 3,010 2,760 Living Study 250 Unit 04 Unit 05 Unit 01 Unit 02 Approved Section AA This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke Approved Section AA Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_009 Drawn: AM Revision: B All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent Ke letter issued 23 May 2018 rb Lin Prior to Issue of the Construction Certificate all e Line of existing building envelope shown dashed Existing Roof To Be Retained Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. Sir G All associated CC payments to be calculated as a percentage of the estimated construction cost TD Bed 03 Th Fall Fall Fall Fall Fall Balcony as detailed in the Cost Summary Report and to MSR 5.43 m2 comply with conditions B(7), B(8) & B(9) of om G consent letter issue 23 May 2018 MSR HR TF BAL There must be no encroachment of building as Existing Roof C'bd S1 Bath To Be Retained 37.00 m2 work or building materials onto council roads, Existing Roof footway, nature strip or public place to comply Mi Fall To Be Retained Fall Fall with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 tch All demolition & required excavation to be contained within boundary lines and to comply ell with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Existing Roof Refer to SWRMP and CVPPM Fall Fall Ro To Be Retained All scope of works to comply All scope of work to comply with conditions A1, a with the AS & the BCA A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & d A13 consent letter issued 23 May 2018 Line of existing building envelope shown dashed All construction materials & waste to be Final Occupation Certificate to be Issued after allocated within the dwelling boundary lines complying with conditions 16 & 17 of consent letter issued 23 May 2018 AA SU M 5a M mer m Sum inds ER ng w cooli W Construction Waste & Site Management Plan 7: IN 30 coo Sum TE am ling mer R bre eze s 30° 7p MN m ° 20 4: Win 30 co N ld ter pm win ds Ke rb Lin e Line of existing building envelope shown dashed Existing Roof To Be Retained Sir G TD Bed 03 Th Fall Fall Fall MSR Fall Fall Balcony 5.43 m2 om Lin G eo MSR fs HR TF BAL ed a im Existing Roof C'bd sM To Be Retained en S1 Bath 37.00 m2 tc on Existing Roof Fall To Be Retained Fall Fall tr o l sh itc ow nd ash he ed ll R Existing Roof Fall Fall To Be Retained oa All scope of works to comply with the AS & the BCA d Line of existing building envelope shown dashed AA Erosion, Sediment Control Plan This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke CWSM & ESC Plans Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_010 Drawn: AM Revision: B This drawing and design is subject to copyright and PROJECT: CLIENT: Drawing Name: Date: Revision Description: iSA DESiGNS 21.05.2018 may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more Client Review Alon Musael general drawings. All dimensions to be verified on site Construction Certificate Jolon Cooke BASIX Certificate & Notes Sent: 24.05.2018 Construction Certificate Issue prior to commencement of any work. All discrepancies Approved DA 492/2017 Postal PO Box 7516 shall be reported to the designer immediately. Project No: CC_180521 Scale: Issue: Address Bondi Beach NSW 2026 SP. 73441 Lot 8 Mobile Email +61 451 867 426 [email protected] F O R C O NS T R UC T IO N 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Drawing No: CC_011 Drawn: AM Revision: B
Enter the password to open this PDF file:
-
-
-
-
-
-
-
-
-
-
-
-