PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Cover Page CC_000 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 Existing wall to be demolished Existing wall to be retained New wall LEGEND : BAL Balustr ade to BCA r equir ements CBD Cupboar d CF Concrete floor, f inish to be polished CP Concrete pavers CT Cer amic tiles FCC Fibre cement cladding, matt paint f inish FD Fire door G Gutter HR Handr ail to BCA r equir ements J Joiner y LB Letter Box MSC Metal sheet cladding MSR Metal sheet roof OG Obscur e glazing P Parapet RB Render ed brickwork RWT Rainwater tank, to Hydr aulic engineer details TC Timber cladding TF Timber f looring TG Timber gate WA New window/door system, f inish TBA NB R3 Insulation to ceiling Foil Insulation to under side of roof R1 Insulation to exterior walls DR A W ING LIST : CC_000 Cover Page CC_001 Location & Context Details CC_002 Survey & Site Plans CC_003 Existing & Demolition Second Floor Plan CC_004 Approved Second Floor Plan CC_005 Approved Attic Floor Plan CC_006 Approved Roof & SWM Plan CC_007 Approved Front & Rear Elevations CC_008 Approved Side Elevation CC_009 Approved Section AA CC_010 Construction Waste & Site Management Plan Erosion, Sediment Control Plan CC_011 BASIX Certificate & Notes Construction Certificate - DA 492/2017 Consent Issued - 23 May 2018 SP. 73441 Lot 8 T H E J O L O N R E S I D E N C E 8/47 Sir Thomas Mitchell Road, Bondi Beach NSW 2026 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Location & Context Details CC_001 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Survey & Site Plans CC_002 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 Survey Plan Site Plan PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Existing & Demolition Second Floor Plan CC_003 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 82.96 m 2 82.96 m 2 81.10 m 2 290 6,480 230 2,100 230 2,100 140 3,325 140 2,270 140 2,500 140 3,200 290 600 230 1,860 140 3,860 115 115 5,860 290 600 2,075 2,500 950 1,340 6,265 600 23,575 600 23,575 600 1,750 1,750 1,375 1,750 1,750 3,626 550 2,494 550 30° 20° MN WINTER SUMMER 5am 7pm 7:30am 4:30pm N Summer cooling breezes Winter cold winds Summer cooling winds TF Line of new roof above shown dashed Line of new roof above shown dashed Line of existing building envelope shown dashed CT Bath Kitchen L'dry Pantry Dining Existing & Demolition Second Floor Plan Study Bed 01 Bed 02 Living Unit 08 Hall Unit 09 AA L'dry Pantry Bath Kitchen Study Bed 01 Bed 02 Unit 07 Dining Living Hall Storage Bath Bed 01 Bed 02 Kitchen Dining L'dry All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Approved Second Floor Plan CC_004 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 82.96 m 2 82.96 m 2 81.10 m 2 600 9,230 100 1,720 100 900 50 330 100 1,575 100 3,100 100 2,400 100 3,670 600 9,730 1,750 1,750 1,375 1,750 1,750 3,626 550 2,494 550 600 9,230 100 550 750 500 750 550 100 400 775 400 100 550 750 500 750 550 100 600 1,800 100 3,670 600 6,265 600 2,075 2,500 950 1,340 115 115 1,000 860 100 600 3,300 290 600 230 1,860 140 3,860 600 290 6,480 230 2,100 230 2,100 140 3,325 140 2,270 140 2,500 140 3,200 290 600 30° 20° MN WINTER SUMMER 5am 7pm 7:30am 4:30pm N Summer cooling breezes Winter cold winds Summer cooling winds TF Line of new roof above shown dashed Line of new roof above shown dashed Line of existing building envelope shown dashed CT HR BAL Bath Kitchen L'dry Pantry Dining C'bd Approved Second Floor Plan Study Bed 01 Bed 02 Living Unit 08 Hall Unit 09 Unit 07 Storage Kitchen Living Bed 01 Bed 02 Kitchen Dining Bath L'dry Kitchen Study Bed 01 Bed 02 Bath L'dry Pantry Dining Living Hall All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Approved Attic Floor Plan CC_005 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 36.96 m 2 600 9,305 100 2,720 10 370 100 1,575 100 3,100 100 2,400 100 3,670 600 9,805 1,750 1,750 1,375 1,750 1,750 3,728 448 2,494 550 600 9,305 100 550 750 500 750 550 100 400 775 400 100 550 750 500 750 550 100 600 1,800 100 3,670 600 6,265 600 4,575 950 1,340 115 115 1,000 10 850 100 2,300 100 800 100 890 230 1,860 100 3,200 100 890 30° 20° MN WINTER SUMMER 5am 7pm 7:30am 4:30pm N Summer cooling breezes Winter cold winds Summer cooling winds TF HR BAL Line of new roof above shown dashed Line of new roof above shown dashed Line of existing building envelope shown dashed Line of existing building envelope shown dashed CT 5.43 m 2 Rumpus Bed 03 Bath C'bd Balcony Approved Attic Floor Plan Fall Fall Fall Fall Existing Roof To Be Retained Existing Roof To Be Retained Existing Roof To Be Retained Existing Roof To Be Retained Fall Fall HR BAL Line of existing roof above shown dashed All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Approved Roof & SWM Plan CC_006 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 9,805 1,750 1,750 1,375 1,750 1,750 3,728 448 2,494 550 600 9,305 100 550 750 500 750 550 100 400 775 400 100 550 750 500 750 550 100 600 1,800 100 3,670 600 1,750 2,825 950 1,340 37.00 m 2 Bath C'bd 600 9,305 100 1,720 100 900 50 330 100 1,575 100 3,100 100 2,400 100 3,670 600 6,265 600 115 115 950 50 860 100 2,300 100 800 100 890 230 1,860 100 3,200 100 890 5.43 m 2 30° 20° MN WINTER SUMMER 5am 7pm 7:30am 4:30pm N Summer cooling breezes Winter cold winds Summer cooling winds Bed 03 TF HR BAL Line of existing building envelope shown dashed Line of existing building envelope shown dashed G MSR Fall Balcony Approved Roof & SWM Plan Fall Fall Fall Fall Fall Fall Fall Existing Roof To Be Retained Existing Roof To Be Retained Existing Roof To Be Retained Existing Roof To Be Retained Fall Fall TD HR BAL S1 All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Approved Front & Rear Elevations CC_007 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 250 2,760 125 225 900 1,200 130 27 742 3,010 350 3,000 250 2,760 125 225 900 700 500 130 27 742 3,010 350 3,000 TW TC DW1 TW TC W7 Approved South Elevation G Approved North Elevation G All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Approved Side Elevation CC_008 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 250 2,760 125 225 475 425 1,200 130 27 742 3,010 350 3,000 G MSR TW TW TW TW TW TC TC FCC FCC TC TC W1 W2 W3 W4 W5 HR BAL Approved East Elevation S1 All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 Approved Section AA CC_009 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 250 2,760 125 225 475 425 1,200 100 350 150 300 3,010 350 900 1,650 450 TW W6 Bed 03 Living Study Approved Section AA Unit 08 Unit 07 Unit 05 Unit 04 Unit 02 Unit 01 All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 CWSM & ESC Plans CC_010 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017 37.00 m 2 37.00 m 2 C'bd Bath C'bd Bath 5.43 m 2 5.43 m 2 30° 20° MN WINTER SUMMER 5am 7pm 7:30am 4:30pm N Summer cooling breezes Winter cold winds Summer cooling winds Bed 03 TF HR BAL Line of existing building envelope shown dashed Line of existing building envelope shown dashed MSR Bed 03 TF HR BAL Line of existing building envelope shown dashed Line of existing building envelope shown dashed MSR Fall Balcony Construction Waste & Site Management Plan Fall Fall Fall G MSR Fall Fall Fall Fall Existing Roof To Be Retained Existing Roof To Be Retained Existing Roof To Be Retained G Existing Roof To Be Retained Fall Fall TD Sir Thomas Mitchell Road Kerb Line AA S1 Fall Balcony Erosion, Sediment Control Plan Fall Fall Fall G MSR Fall Fall Fall Fall Existing Roof To Be Retained Existing Roof To Be Retained Existing Roof To Be Retained G Existing Roof To Be Retained Fall Fall TD Sir Thomas Mitchell Road Kerb Line AA S1 All construction materials & waste to be allocated within the dwelling boundary lines All scope of works to comply with the AS & the BCA Line of sediment control shown dashed All scope of works to comply with the AS & the BCA All Building work to be carried out in accordance with the BCA, Australian Standards and the conditions of approved DA 492/2017 consent letter issued 23 May 2018 All scope of works to comply with conditions A(1), A(2), A(3), A(4), A(5) & A(6) of consent letter issued 23 May 2018 Prior to Issue of the Construction Certificate all Section 94A contributions, Security deposits and Long Service Levy fees are to be paid in full to Waverley Council. All associated CC payments to be calculated as a percentage of the estimated construction cost as detailed in the Cost Summary Report and to comply with conditions B(7), B(8) & B(9) of consent letter issue 23 May 2018 There must be no encroachment of building work or building materials onto council roads, footway, nature strip or public place to comply with the conditions 4, 8, 12, 13, 14 & 15 of consent letter issued 23 May 2018 All demolition & required excavation to be contained within boundary lines and to comply with the conditions 4, 8, 9, 10, 11, 12, 13, 14 & 15 of consent letter issued 23 May 2018 Refer to SWRMP and CVPPM All scope of work to comply with conditions A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12 & A13 consent letter issued 23 May 2018 Final Occupation Certificate to be Issued after complying with conditions 16 & 17 of consent letter issued 23 May 2018 PROJECT: Revision: Drawn: Scale: PO Box 7516 Bondi Beach NSW 2026 Sent: Issue: Drawing No: Project No: Date: Drawing Name: Revision Description: This drawing and design is subject to copyright and may not be reproduced without prior written conscent. Detail drawings are to be taken in preference to more general drawings. All dimensions to be verified on site prior to commencement of any work. All discrepancies shall be reported to the designer immediately. Postal Address Mobile CLIENT: Email +61 451 867 426 alon@isadesigns.com.au Alon Musael iSA DESiGNS F O R C O NS T R UC T IO N AM 24.05.2018 21.05.2018 CC_180521 BASIX Certificate & Notes CC_011 B Construction Certificate Jolon Cooke SP. 73441 Lot 8 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Client Review 8/47 Sir Thomas Mitchell Road Bondi Beach NSW 2026 Construction Certificate Issue Approved DA 492/2017