03 OXAGON NEOM Industrial City NEOM Saudi Arabia MAIL TYPE Workflow Transmittal MAIL NUMBER PAR-WTRAN-347019 REFERENCE NUMBER PAR-WTRAN-347019 Final (WF-135556) 4800001134/000-Method of Statement For Cast-in Situ From Mr Esmail Sarip - SAUDI ARABIAN PARSONS LIMITED To (4) Cc (6) Sent Thursday, 26 December 2024 3:13:39 PM AST (GMT +03:00) Status N/A Mr Shahzad Ahmed - SAUDI ARABIAN PARSONS LIMITED (+3 more...) Mr 4800001134 BYT - ABYATONA (+5 more...) DOCUMENT ATTACHMENTS (1) ( 0 selected) File Document No Revision Revision Date Title Status 03-150000-4800001134-BYT-CIV-MST-000001 03 17/12/2024 4800001134/000-Method of Statement For Cast-in Situ A - Work May Proceed 22/10/2025, 01:45 Aconex https://ksa1.aconex.com/hub/index.html 1/2 MESSAGE Workflow Review History The attached documents have completed the "4800001134/000-Method of Statement For Cast-in Situ" workflow with the following results : This transmittal was automatically generated. Doc No Step Participant Review Outcome Comments 03-150000-4800001134-BYT-CIV-MST- 000001 Health & Safety S Ahmed C - Revise and Resubmit - Do Not Proceed Contractor to incorporate Env. comments prior to secure formal approval and commence the job. Environment G Jasim C - Revise and Resubmit - Do Not Proceed 1) Include Environmental Manager's roles and responsibilities in the MST document. 2) Risk assessment matrix only includes health and safety issues. This matrix should expand to include environmental aspects related with project activities. 3) Waste management on site and disposal, transfer and disposal of any waste generated on site should be taken care by NEOM registered service providers and disposal sites. Official letters for waste transfer and disposal site should be added within appendices. 4) Any hazardous chemicals and materials should be stored, handled and disposed based on NEOM Standards. Further details should be provided related with risks of having those chemicals on site. 5) Dust and noise management control mitigations should be covered within RA Form. 6) Concrete waste management should be included within risk assessment Matrix. Senior Construction Manager E Sarip A - Work May Proceed 22/10/2025, 01:45 Aconex https://ksa1.aconex.com/hub/index.html 2/2 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 0 3 1 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement Description of work to be done: This method statement for the Box Culvert ( Cast - in situ) in Construction and Extension of Box Culvert Under Highway 55 controlled by ABYATONA, according to the Specifications as well as Consultant’s/Client Instructions. As cross‐main drainage structures, box culvert/s will be constructed at instructed locations by the design within the project area and ensuring full compliance to all relevant project standards/Specification, drawing and international codes related to Box Cu lvert/s Workforce representatives consulted during the preparation of this method statement: Ayman Shaheen Role Name Role or area of responsibility Date of visit to work location Signed Date Author: QA/QC M anager Reviewer *: M K huraam QA/QC M anager Spec ia l is t r e v ie wer : (if required) Ayman Shaheen P roject M anager The d istribution list for method statement: The s equence of work acti vities (including hold points a s necessary) : 03-1 5 0000-4800001134- BYT-CIV-MST-000001 M Khuraam 17-12-2024 17-12-2024 17-12-2024 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 2 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement Table of Contents: 1. PURPOSE ..................................................................................................................................................... 3 2. SCOPE .................................................................................................................................................... 4 3. REFERENCES ........................................................................................................................................ 6 4. DEFINITIONS .......................................................................................................................................... 6 5. RESOURCES, ROLES, AND RESPONSIBILITIES ................................................................................ 7 6. SAFETY RULES .................................................................................................................................... 13 7. EQUIPMENT, RESOURCES, MATERIALS AND MATERIAL STORAGE & HANDLING .................... 16 8. SITE PLANNING ................................................................................................................................... 29 9. METHOD AND SEQUENCE OF WORK ............................................................................................... 30 10. Method\ Procedure of Bituminous Coating........................................................................ 60 11. INSPECTIONS & TEST RECORDS / QUALITY ASSURANCE/CONTROL ................................. ..61 12. SAFETY PRECAUTIONS ..................................................................................................................... 61 13. Concrete Waste Management and Disposal ...................................................................................... 62 14. Appendix .............................................................................................................................................67 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 3 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement 1. PURPOSE The purpose of this procedure is to provide minimum requirements and methods for Reinforcement, Formworks, Bituminous Coating & Concrete Works for the project of Construction and Extension of Box Culverts Under HW 55 and should in accordance with IFC drawings, standards, codes, and related specifications. All works related in this Method Statement shall be executed in accordance with the approved procedure. To ensure that all work will be executed safely and in accordance with the contract requirements and that all quality assurance/control activities are conducted in a systematic manner, works are inspected, and conformance is verified and documented. 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 4 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement 2. SCOPE This method statement for Reinforcement, Formworks, Bituminous Coating & Concrete Works of work order No. 4800001134/ WO - 134 , Construction and Ex tension of Box Culverts Under HW 55 shall include but are not limited to the Reinforcement, Formworks, Bituminous Coating & Concrete Works as shown on approved drawing as well as related procurement requirements, material, temporary works, local authoritie s’ approval and stakeholders’ interface and coordination activities. The purpose of this Method Statement is to establish the rules to be applied during all the concrete works including in - situ concrete (Blinding and Structural) and concrete repair works s tarting from storage of materials, reinforcement work, formwork, transportation of material, inspection, installation, testing, concrete pouring, concrete curing and concrete repair to ensure that all the concrete works are properly executed in accordance with Neom Specifications Section 033000 – Cast - In - Place Concrete and applicable standards referenced herein Section 3 – References. 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 5 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 6 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement 3. REFERENCES Neom Contract Agreement - 4800001134/134 Neom Project Specification. NEOM & MoT relevant specifications MoT Specification Part 5 Concrete, Steel and Structure Neom Specifications SECTION 033000 – Cast - In - Place Concrete Structures ASTM: AMERICAN SOCIETY FOR TEST AND MATERIAL ACI: American Concrete Institute NEOM Safety Plan Approved IFC drawings NEOM Qualit y MS Procedures Approved Project Quality Plan (PQP) NEOM Schedule Q NEOM - NEN - SCH - 002 Rev 0 3 Quality Management System Requirements ISO 9001 & 9001: 2015 Inspection & Testing Plan Approved Construction Environmental & Social Management 4. DEFINITIONS In this Method Statement (as hereinafter defined) the following words and expressions shall have the meanings hereby assigned to them. ASTM American Society for Testing and Material AWS American Welded Society BS British Standard CESMP Construction Environmental Social Management Plan Concrete is a composite material that consi sts of a mixture of hydraulic cement, aggregates, and water, with or without admixtures, fibres, or other cementations materials. Formwork is the term used for the process of creating a temporary mould into which concrete is poured and formed. Traditional formwork is fabricated using timber, but it can also be constructed from steel, glass fibre reinforced plastics and other materials HSE Health Safety Environment IT P Inspection and Test Plan MOT Ministry of Transportation, General Specification (MOT Part 5 Concrete, Steel and Structures. Section 5.01. Portland cement Concrete and MOT Highway Materials M anual, Volume 1. Sampling PQP Project Quality Plan Reinforcement Rebars, wires, strands, fibers, or other slender elements that are embedded in a matrix such that they act together to resist forces ABYATONA ABYATONA Development Contracting Company 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 7 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement SBC Saudi Building code The Client “NEOM” The Consultant or the Engineer means the firm or company named by the Client to act as ‘Consultant’ for the design and supervision of construction, who is PARSONS including its representatives, successors and permitte d assigns. The Contractor’ means ABYATONA has been nominated by the Client and the legal successors to execute the work. T.S Technical Specification. The Subcontractor’ means any company who will execute a particular part of the work under control and sup ervision of the Main Contractors. WIR Work Inspection Request Form 5. RESOURCES, ROLES, AND RESPONSIBILITIES PROJECT MANAGER: ABYATONA project manager has the overall responsibility for ensuring that the Pro ject Team are performing in accordance with the requirements of the Contract Agreement between the Client and ABYATONA, requiring strict compliance with: Contract Specifications, Contract Drawings, Approved Workshop Drawings, Approved Method Statement, App roved Safety Plan, QA/QC Procedures and with this Method Statement. His responsibilities include as: Ensuring adherence with ABYATONA Company Policies. Managing site project activities on behalf of the ABYATONA. Establishing project requirements, policies, organization and schedule. Monitoring project’s progress and quality, approving final resolution of all items of nonconformance. Approving all subcontracts. Ensuring implementation of the ABYATONA QA/QC Program. Issuing all projects directives. Managing p roject’s costs. Initiating and negotiating with NEOM for all change orders and / or work requests and signing change order and / or work requests. Preparing, approving and submitting progress reports to the NEOM. Having final authority on all site project activities CONSTRUCTION MANAGER: 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 8 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement The Construction Manager controls and coordinates all work activities carried out in the construction site. His responsibilities as: Establishment and implementation of work procedures for the execution of work Review det ailed construction schedule including redefinition of priorities where necessary Control and coordination of the work entrusted to Sub - contractors Planning and scheduling of the work force and equipment Planning and scheduling of the work force and equipme nt Preparation of data required for compilation of the Work Progress Report Preparation of the change order proposals Responsible to verify existing utilities within the proximity of the proposed work, respo nsible for assurin g notification of the Utility owner if utility hit occurs. TECHNICAL MANAGER: ABYATONA Technical Manager has the responsibility for ensuring that the Project Drawings, Workshop Drawings and Method Statement of all the works have been prepared in accordance with the requirements and fully coordinated with the other parallel activities. SITE ENGINEERS: Co - ordinate all the site activities required for the execution of Work according to the contract. Liaise with site representative s of Client and Engineer to co - ordinate safety procedures. Co - ordinate and explain the work to be carried out to the Supervisors /Site Foreman. Ensure the compliance of works with the related approved Quality Control Plan. Responsible to verify existing ut ilities within the proximity of the proposed work, responsible for assuring notification of the Utility owner if utility hit occurs QUALITY MANAGER: Representing the project for all quality matters. Developing and maintaining the Project Quality Plan. Ve rifying implementation and adherence with QA/QC. Quality Procedures and / or work instruction. Preparation of new procedures and / or work instructions. Reporting items of non - conformance to the Project Manager. Reporting on the corrective action / resolut ion of non - conformance. Verifies program implementation by conducting project specific audits. Liaison with NEOM / Parsons to coordinate and assist in NEOM audits, surveillance, inspections and approvals. Establishing, maintaining and overseeing the docume nt control and record keeping function. Establishing, maintaining and overseeing the Non - destructive Testing and Wild Engineering functions. Quality Monthly Report Preparation. Evaluation of Suppliers/ Sub - Contractor’s Quality Systems. Procurement and Proj ect Inspection, witnessing and monitoring in accordance with the approved inspection and test plan. 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 9 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement QC ENGINEER / INSPECTOR: Duties and responsibilities of QA/QC Inspector could be typically enumerated as follows: Ensure compliance with the requirements o f the contract scope of work, technical specifications and contract quality plan. Conduct quality control inspection tasks in accordance with the requirements of the established inspection plans. Initiate WIR after verification of activities to be offered for Inspection. Signs and dates inspection reports for those inspection steps performed. Provides final acceptance sign - off of all prescribed inspection reports attesting to the completeness of the project. Calibration and use of the necessary measuring a nd test. Coordinate for the third party agency for the required test. Initiate preparation of the job site quality control records. Reporting both verbally and in writing any non - conformance discovered. Reporting daily a descriptive of each day’s work. Con duct weekly QA/QC Tool meeting. CHIEF SURVEYOR Carry out a pre - construction survey to fix the locations and corresponding elevations as per the approved shop drawings. Ensure quality and compliance during phases of surveying works and the regular checking of the surveying equipment or periodic calibration from third parties. Ensure the validity and serial number of calibration certificates are available and posted in the survey equipment. Ensure proper safety guarding of surveying equipment. To maintain th e records of all surveying equipment handled. SURVEYOR ABYATONA Surveyor under the direction of the nominated chief surveyor has the responsibility to check the established main reference and check levels at regular intervals. SUPERVISORS / FOREMEN ABYAT ONA Supervisors have the direct overall responsibility for the supervision of their allocated area including the direct supervision of the fixers and labors involved and the strict implementation of safety rules and procedures. SAFETY MANAGER: Establish a nd communicate safety rules and standards to all employees and contractors. Provide appropriate resources, tools, and training for employees. Award contracts using safety, health, and environmental criteria. Conduct and document safety meetings. 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 10 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement Conduct in spections and tours regularly to maintain facilities in a safe condition. Correct unsafe acts and conditions promptly. Maintain facility emergency plans and conduct regular emergency drills. Investigate injuries, spills, and other incidents and promptly pr ovide corrective actions. Review organization and employee safety performance periodically and provide feedback. Responsible to verify existing utilities within the proximity of the proposed work, responsible for assuring notification of the Utility owner if utility hit occurs. SAFETY SUPERVISOR: Responsible and accountable for their team’s health and safety performance. Conduct informal health and safety meetings with their employees at least monthly. Enforce all safe systems of work procedures that has been issued; Report to the Safety Manager any weaknesses in the safe system of work procedures or any actions taken to revise such procedures. These weaknesses may be revealed by either h ealth and safety risk assessments or observations; Report any jobs that are not covered by safe systems of work procedures to the Safety Manager; Review any unsafe acts and conditions and either eliminate them or report them to the Safety Manager. Instruct employees in relevant health and safety rules, make records of this instruction and enforce all health and safety rules and procedures. Make daily inspections of assigned work areas and take immediate steps to correct any unsafe or unsatisfactory conditio ns, report to Safety Manager those conditions that cannot be immediately corrected and instruct employees on housekeeping standards. Instruct employees that tools/equipment are to be inspected before each use and make spot checks of tools / equipment’s con dition. Instruct each new employee personally on job health and safety requirements in assigned work areas. Provide on - the - job instruction on the safe and efficient performance of assigned jobs for all employees in the work area. Report any apparent employ ee health problems to the Safety Manager. Enforce PPE requirements, make spot checks to determine that protective equipment is being used and periodically appraise the condition of the equipment. Record any infringements of the PPE policy; Doc In the case of a serious injury, ensure that the injured employee receives prompt medical attention, isolate the area and the equipment as necessary, and immediately report the incident to the Safety Manager. In case of a dangerous occurrence, the Supervisor should ta ke immediate steps to correct any unsafe condition and, if necessary, isolate the area and the equipment. As soon as possible, details of the incident and any action taken should be reported to the Safety Manager. Investigate all accidents, serious inciden ts, and cases of ill health involving employees in assigned work areas. Immediately after an accident, complete the accident report form and submit it to the Safety Manager for onward submission to the health and safety adviser. A preliminary investigation report and any recommendations for preventing a recurrence should be included on the accident report form. Check for any changes in operating practices, procedures, and other conditions at the start of each shift/day and before relieving the on duty Super visor. A 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 11 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement note should be made of any health and safety - related incidents that have occurred since their last working period; Make a quick check to determine any absentees at the start of each shift/day. Report any absentees to the Safety Manager. Make daily spot checks and take necessary corrective action regarding housekeeping, unsafe acts or practices, unsafe conditions, job procedures, and adherence to health and safety rules. Attend all scheduled and assigned health and safety training meetings. Act on all employee health and safety complaints and suggestions. In their assigned area, maintain health and safety signs and notice boards in a clean and legible condition. SAFETY OFFICER Responsible for monitoring and assessi ng hazardous and unsafe situations. Developing measures to assure personnel safety. Correct unsafe acts or conditions through the regular line of authority. Exercise emergency authority to prevent or stop unsafe acts when immediate action is required. Main tains awareness of active and developing situations. Ensures there are safety messages in each Incident Action Plan. Participate in planning meetings to identify any health and safety concerns inherent in the operations daily work - plan. Review the Incident Action Plan for safety implications. Investigate accidents that have occurred within incident areas. Ensure preparation and implementation of Site Safety and Health Plan (SSHP). Inspects the site to ensure it is a hazard - free environment. Conducts tool me etings. Reviews and approves all subcontractors’ safety plans. Verifies that injury logs and reports are completed and submitted to Client representative. Verifies that all tools and equipment are adequate and safe for use. Promotes safe practices at the j ob site. Enforces safety guidelines. Trains and carries out drills and exercises on how to manage emergency situations. Conducts investigations of all accidents and near - misses. Reports to concerned authorities as requested or mandated by regulations. Cond ucts job hazard analysis. Establishes safety standards and policies as needed. Watches out for the safety of all workers and works to protect them from entering hazardous situations. Responds to employees’ safety concerns. Coordinates registration and remo val of hazardous waste. Receives reports from and responds to orders issued by Client. Arranges for OSHA mandated testing and/or evaluations of the workplace by external agencies/consultants. Support the development of OHS policies and programs. Advise and instruct on various safety - related topics (noise levels, use of machinery etc.). Conduct risk assessment and enforce preventative measures. Review existing policies and measures and update according to legislation. Initiate and organize OHS training of em ployees and executives. 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 12 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement Inspect premises and the work of personnel to identify issues or non - conformity (e.g. not using protective equipment) Oversee installations, maintenance, disposal of substances etc. Stop any unsafe acts or processes that seem danger ous or unhealthy. Record and investigate incidents to determine causes and handle worker’s compensation claims Prepare reports on occurrences and provide statistical information to upper management. Carry out PTW Monitoring and review. EQUIPMENT OPERATOR The only authorized person to operate any equipment to be used in the project. CARPENTER A carpenter construct, erect, install and repair structures and fixtures of wood, plywood, and wallboards using carpenter’s hand tools and power tools. HELPERS /LAB ORERS Perform tasks involving physical labor at building, assists the skilled workers, remove trash, and residual building debris. Assist in constructing and later disassembling reinforcement braces, concrete forms, scaffolds, and temporary structures. CO NCRETE BATCH PLANT SUPPLIER The Plant Manager shall monitor the prevailing Ambient conditions, concrete mix temperature trends etc. to determine the timing to implement the control measures. Identified in this Method statement and liaise with the Construct ion & QA/QC sections accordingly. The Plant Manager shall ensure that all necessary equipment at the batching plant for cooling the aggregates or chilling water is maintained in good condition and back up plants are similarly maintained. The Plant Manager shall ensure that aggregates and other constituents material stored with appropriate shading and other measures, implemented as required by this method statement and similar is in the place for back up arrangements. The Plant Manager shall ensure availabi lity of flaked ice and the like in sufficient quantities for the scheduled concrete works and the backup arrangements are secure. • The Concrete supplier shall propose to the contractor mix designs suitable for Hot Weather concreting and undertake all nece ssary mix trials and testing in conjunction with the contractor and engineer to obtain necessary arrangement. NURSE ROLE & RESPONSIBILITIES Develop and implement health and safety programs. Provide emergency treatment in the workplace. 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 13 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement Administer over - the - counter medication to employees. Create a clean, and comfortable sickbay area. Promote healthy eating and wellness programs. Document all employee injury and illness and keep this information confidential. Improve the health of employees through on - going programs and health checks. Develop strategies to ensure maximum employee work input. Communicate with management on a regular basis. EMPLOYEE (WORKER) Comply with applicable rules, standards, and safe work practices. Co mmunicate safety rules and standards to contractors and coworkers. Correct or report unsafe acts or conditions. Maintain knowledge of safety requirements, including emergency response actions. Participate in safety meetings. Operate, inspect, and maintain facilities in a safe condition. Report injuries, spills, unsafe conditions, near misses, and incidents immediately. Assist in incident investigations as necessary. CONTRACTOR RESPONSIBILITIES Ensure that contractor employees and their subcontractors are t rained in safety rules and standards and are competent in their craft or skill. Comply with all safety rules and standards, policies, and procedures. Report injuries, spills, unsafe acts and conditions, near misses, and incidents immediately to the Client person in charge. Operate equipment only with proper authorization. Hold pre - job meetings and other safety meetings during job execution. 6. SAFETY RULES 6.1. STOP UNSAFE WORK Immediately STOP any unsafe work that has the potential to injure personnel, damage equ ipment, or harm the environment. 6.1.1. REPORT INCIDENTS Immediately report all work - related injuries/illnesses, no matter how minor, to your supervisor. Immediately report all fires, spills, or releases, no matter how small, to your supervisor. Immediately repo rt any unsafe condition, unsafe act, near miss incident, or vehicle collision to your supervisor. 6.1.2. FOLLOW SAFE PRACTICES Always comply with all safe driving requirements, particularly speed limits, when operating a vehicle. Ensure that all persons in vehic les always wear seat belts. Use the handrail and take only one step at a time when going up or down stairways. Erect barricades and flagging around hazardous work areas, such as holes in decking and floor surface s, trenches, road crossings, and overhead hazardous work. 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 14 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement Use only proper tools and equipment maintained in a safe working condition. Do not use homemade, modified, or damaged tools. Always maintain good housekeeping in your work area. Smoke only in design ated areas. Do not use matches or lighters in restricted areas. Rest and eat only in designated areas. Use proper manual lifting techniques or obtain assistance or mechanical lifting aids when lifting heavy loads. Ensure all safety guards, switches, and al arms are in place and functional on operating machinery and electrical switchgear. Notify the appropriate supervisor and affected parties, tag the device, and document the action properly whenever a safety device is removed from service and/or defeated. In spect all fire extinguishers and other emergency equipment and keep them clear of any obstructions. Properly label and store all chemical or hazardous material containers. Where specified, store drums in secondary containment areas or on drum containment p allets. 6.1.3. AVOID UNSAFE ACTIVITIES Do not climb or stand on equipment, piping, valves, or unstable surfaces (e.g., chairs or barrels) to perform work. Use approved fall protection measures (e.g., personal fall arrest system or scaffolding) if the working hei ght is greater than 1.8 m (6 ft) from the floor or platform level. Do not run in work areas. 2 GPS receivers Trimble R8 S GNNS with static and RTK accessories. Do not wear finger rings, wristwatches, jewellery, loose clothing, unsecured long hair, or loose accessories within an arm’s reach of rotating equipment or electrical switchgear. Do not apply compressed industrial gases to yourself or others. Do not operate equipment having a “DANGER, DO NOT OPERATE” (hold) tag. Do not use electronic devices (e.g., mobile phones, smartwatches, and instruments) that are not listed as safe for use in classified locations without proper approval. Do not engage in horseplay or fighting. 6.1.4. PROTECT YOURSELF Wear approved hard hats, safety eyewear with side shields, and safe ty footwear in all restricted areas, project sites, and in areas where specifically designated. Use approved additional hazard - specific personal protective equipment (PPE), including goggles, ace - shield, respiratory protection equipment, and body/hand prot ection where specific hazards requiring their use have been identified. Wear proper PPE prescribed by the chemical hazard bulletin (CHB) or safety data sheet (SDS) when handling chemicals or hazardous materials. Use approved hearing protection in designate d high noise areas. Use proper hand protection (e.g., gloves) when performing tasks that may present a hand injury risk. Always wear approved bicycle helmets while riding a bicycle, skateboard, scooter, or other similar device. 6.2. SAFETY MEETING Objectives o f the safety meeting to be conducted by the SM/SE/SO is: To ensure application of Safety norms, Rules & Regulation. To Zero down the risk factors to avoid the accidents. Enforce to wear the Personal Protective Equipment by all employees work force. To meet the emergency AS AND WHEN arises at SITE. To carry out periodically safety inspection, discuss the shortcomings & action to set it right. 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 15 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement To carry out investigation of all the accidents, review & recommend preventive measures to avoid such recurrence and ensure the implementation of the same. To discuss & resolve safety observations at SITE. Records of Safety Meetings and Training Program shall be maintained. 6.3. HEAVY EQUIPMENT: Apply the following safety precautions when operating mobile heavy equipment suc h as, but not limited to, front end loaders, backhoes, excavators, boom trucks, Dump trucks, scrapers, and roller compactors. 6.3.1. SAFE OPERATION Operate heavy equipment only if certified per the requirements of Saudi Arabian Government requirements apply. Iden tify all utilities and lines and notify appropriate parties before beginning any digging or excavation work. Maintain distances in accordance with the Crane Operations and Rigging Equipment safety topic when operating heavy equipment around overhead power lines. Ensure that ground personnel maintain a safe distance from operating equipment and establish eye contact with the operator before approaching. Do not jump from the equipment to the ground when exiting. Ride or work only on parts of the equipment tha t are specifically designed for personnel. Designate a signal person when visibility is obstructed and there is a risk of the equipment coming into contact with assets or personnel. Wear high - visibility (e.g., reflective) fluorescent vests when performing the duties of a signal person. Latch and secure all parts of equipment before traveling (e.g., excavator or backhoe booms, dump bodies). Do not operate mechanical excavators within 3 m (10 ft) of any pipeline or cable. Do not leave heavy equipment unattend ed while it is running. Shut off engines, apply parking brake, and chock wheels when equipment is left unattended, including overnight. Lower any blades, buckets, scraper bowls, and other hydraulic equipment to the groun d when it is left unattended. Remove ignition keys to prevent startup by unauthorized personnel. Dismount from equipment while maintenance or repair work is being performed, unless otherwise instructed. Stop and deactivate equipment prior to performing rep airs. Do not sleep or rest under or near heavy equipment. 6.3.2. EQUIPMENT CONDITION Ensure all heavy equipment has a functioning audible backup (reverse) alarm. Maintain heavy equipment in good operating condition, including functional seat belts. Keep all cab glass clean without obstructions or damage. Ensure cab glass is constructed of safety glass. Ensure material handling equipment (e.g., bulldozers, loaders, and scrapers) is equipped with rollover protective structures (ROPSs). 6.4. TRAFFIC SAFETY MANAGEMENT & CONTROL AS PER MOT GUIDELINES 6.4.1. SAFETY AWARENESS MEETING Safety awareness meeting has to be conducted every working day morning/every other day 17-12-2024 Method of Statement For C ast - in S itu M S serial no. Rev. Sheet no. 03 - 140000 - 4800001134 - BYT - CIV - MST - 000001 0 3 16 of 65 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. 4800001134 Location or site: Neom - OXAGON Date of prep’n: Organisation to do work: ABYATONA Contractor’s ref. File name: Printed: 27 November 2024 NEOM - NLF - FRM 0 0 2.0 2 M ethod S tatement to brief the work force in the safety prevention measures. Traffic Safety will be discussed as a topic. Each sur vey group should be well informed to follow specified instructions such as “Barricading Boards” and signalmen will be deployed to control the traffic flow during working time. The survey team should have practical knowledge to adjust following specified in stru