Intelligent KDM System Manual Intelligent PV Power Station Monitoring and Controling System Suitable terrace Apple Windows Android Intelligent Management ◆ Controlling my intelligent power station by multisystem anywhere and angtime ◆ Oneclick , electric quantity,power,effiency and profit are lucency ◆ Batch power station , solarbox and micro inverter are easy to manage Intelligent monitoring,metering and communication system in 2018,which main parts include:micro inverter,intelligent solarbox,MODEM and APP software.The function:Monitoring,Metering,Communication.The monitoring sysytem can be controlled in APP and PC. Cloud PAD Function : Cloud Wireless To ser ver Wireless inverter SolarBox MODEM KDM Ser ver Phone PC KDM PV intelligent system running mode KDM System Parts Inverter Solarbox(choosing) Modem APP KDM System is made up of four parts , user can choose to install by real power station demand SolarBox will transfer the micro inverter's data to KDM server by WVC-Modem,user can be easy to see and manage the power station's data and running condition by mobile or PC equipment. ( As follow photograph ) Realtime monitor : power quantity , power , voltage and current. Remote control : on-line testing,batch processing and multi-site management. Terrace : computer,PPC and mobile etc. Professional software : independent APP A f t e r- s a l e s e r v i c e : a l l d a y o n - l i n e s e r v i c e f o r installation guidelines and technology supporting. P1 WIFI-MODEM transfers the data from the inverter to KDM server via the internet,the client can manage the data sending and receiving,the power statistics and the error of the machine running state,whitch greatly improvers the stability of the system. Support all wvc series micro inverter Each Modem can monitor 46pcs micro inverters or 92 SolarBox at the same time. Can be used by PC , mobile and PAD. Check the data by day , month or year Easy to use Support local interview and remate control Dual antenna transceiver design 433MHz + Wifi double modules Choose APP or Web 433MHz Communication Running Mode Cloud WIFI Communication ⑥433MHz antenna ⑦WIFI antenna Diagram of indicator and connector ① Power lamb ( bright ) ② Working station indicator ( blink ) ③ Network connection signal ( bright ) ④ Sending data ( blink ) ⑧ Reset ⑤ receiving data ( blink ) ⑨ Power input port ⑨ ① ② ③ ④⑤ ⑥ ⑦ ⑧ ⑥ ⑦ Front Back KDM Ser ver WIFI-MODEM PV array WIFI-MODEM 50 / 60Hz 10Watt 0 35KG 160 × 100 × 32mm 433MHz + WIFI Transmission distance Waterproof 1000M ( open range ) IP23 automatic shift 120/230 V G W Size Input Voltage range Input frequency range Max Output Power Communication mode Parameter Brief configuration interface , made the installation easier and faster WiFi-Router WIFI Communication P2 Remark: One MODEM can monitor 46 WVC inverters or 92 Solarbox at the same time. SolarBox Intelligent SolarBox has a function of monitoring,metering,communication and protection etc , which paly a role of balance transfer between inverter and MODEM and play a great important of the time and stability for the large power station,simply the maintenance and reduce the operation cost. 光伏三相监控/通讯/计量电箱 Kaideng SolarBox 凯登能源 Configuration 1 set outer box 1PCS single phase master switch Feature : ★ Realtime monitor electric quantity ★ R emote control micro inverter ★ Anti - thunder design , rust - proof property and waterproof IP23 ★ Fastest distance transfer open distance reach 1000m ★ Microterminal risualization operation interface PV input port Grid input port 1PCS surge protector 1PCS intelligent digit meter 1PCS communication data repeater 3pcs group trip switch Attn : under the same SolarBox in parallel , the amount of micro inverters power can not exceed the rated power 30kw 光伏三相监控/通讯/计量电箱 Kaideng SolarBox 凯登能源 Single phase SolarBox (SolarBox - 1P - 30K ) T hree phase SolarBox ( SolarBox - 3P - 100K ) Feature : ★ Realtime monitor electric quantity ★ R emote control micro inverter ★ Anti - thunder design , rust - proof property and waterproof IP23 ★ Fastest distance transfer open distance reach 1000m ★ Microterminal risualization operation interface PV input port Grid input port Configuration 1 set outer box 1PCS three phase master switch 1PCS surge protector 1PCS intelligent digit meter 1PCS communication data repeater 9pcs group trip switch 1Set current transformer Attn : under the same SolarBox in parallel , the amount of micro inverters power can not exceed the rated power 100kw P3 KD Montoring system KDM system is a PV system management PC,which support real-time data visualization and historical data saving analysis.KDM server analyze the data from MODEM and shown by graph and figure,user can know the operation of power station. At the same time,KDM provides intelligent solarbox and inverter's operation and displaying function,that the user can monitor the operation,find and locate the power station.Users enters into WEB or APP to manage query the system running state,analyze data and manage equipments by Mobile,computer and PC. Data visualization and historical data inquery. Analyze the power efficiency and performance of PV system Browser System feature Displaying running situation Easy understanding chart Real-time data display : energy,power,voltage and current. Manage users via network Manage and display information on line anywhere and anytime PC Laptop PPC APP APP Entering Broser support : System support : Two entering ways for user. ( Ensure the safety of power station, pls don't choose saving name and password when use PC in public. ) Set the management of power station,solarbox and inverter by different demand P4 Connect the 433MHz antenna Connect the power Connect the WiFi antenna WiFi - Modem Installation guide(WiFi only) Tighten the two antennas of the Modem in order, then connect the power cord and power it on. Ready to work Check if there is a sticker on the back of the Modem. If there is no label or the code is unclear, please contact the manufacturer ; the location of the label is as shown below (copy the 8-digit code for backup) 型 号 Front Back Prepare a toothpick (or any replacement that can be inserted into the reset hole) Install the App client on the mobile phone (the first time the mobile phone APP is installed, you will be prompted to open the positioning function. For details, please follow the mobile phone prompts) P5 Authorized GPS Mobile phone initialization steps Device initialization operation When manually initializing the Modem, first press and hold the reset button for 5 seconds and then release it. Repeat this operation quickly in one second. Press and hold the reset button until all the lights are off (except the power indicator Power). Release. That is, the initialization of the Modem operation is completed, as shown in the following figure; Press and hold for 5 seconds, then release it and repeat it for 1 second. All lights except the power light are off P6 Your WiFi SSID Choice: HF-A11x_AP Your WiFi Password HF-A11x-AP You WiFi SSID You WiFi Password HF-A11x-AP You WiFi SSID You WiFi Password 1. When manually initializing the Modem, first press and hold the reset button for 5 seconds and then release it. Repeat this operation quickly in one second. Press and hold the reset button until all the lights are off (except the power indicator Power). When it is released, the initialization of the Modem operation is completed, as shown in the following figure; 2. Right click on the desktop network icon and click Properties. In the [Network and Sharing Center] that pops up, click [Change Adapter Settings]. 3. Make sure the local connection is disabled. Double-click the wireless network connection. When the optional wireless network list appears in the lower right corner, click the wireless AP starting with HF-A11. Select [Cancel] when [Set Network Location] appears, as shown below: PC initialization steps P8 Device initialization operation Press and hold for 5 seconds, then release it and repeat it for 1 second. All lights except the power light are off 4. Open the browser and enter the background address http://10.10.100.254 in the address bar. After entering the user name and password admin, click OK to enter the Modem setting page. In the module working mode setting, click : AP mode, as shown in the figure. Shown 5. After selecting [Wireless Terminal Settings], click [Search], select your wireless network and click Apply to confirm, as shown in the figure. (If your wireless network is not shown in the list, click the Refresh button to refresh) P9 P10 6. Enter the WiFi password you just selected in the Password field and click OK. as the picture shows (In the jump display setting is successful, when prompted to restart the device, directly click the left serial port and other settings, go to the next step) 7. Click the serial port and other settings, change the network mode to [Client], change the port to [1234], change the server address to [118.178.237.44]; click OK as the picture shows 8. After completing the above operations, click [Module Management], and then click the [Restart] button in [Restart Module]. The MODEM initialization operation can be completed. as the picture shows Enter WiFi Password Client 1234 118.178.237.44 Open the APP or log in to the system and click [Register] to register. (Please fill in the relevant information and save the relevant account number and password); KDM system account application For the first time, please click to add the power station, then fill in the parameters of each column and click Save, as shown below. Remark : If the electric box is equipped with SolarBox electric box, please select "Yes", please fill in the 8-bit code for the collector, and fill in the power supply calculation ratio as "1". Login Add power station P11 After completing the basic information of the power station, click [Add SolarBox] below and follow the prompts, as shown below. After the power box is successfully added, it will be added as shown on the left side of the figure below, such as the failure as shown in the right figure below. Tip: The electric box code is the unique 4-digit code inside the electric box. CT is the transformer multiple, if not, fill in 1. Tip: If the collector is not connected, the operation fails. Please return to the settings in the ser ver configuration to check if the MODEM code is incorrectly filled. Add SolarBox P12 SolarBox Name SolarBox Code 1 P13 Add the inverter specific operation mode, please follow the prompts to select and fill out. Single increase method step Add Inverter Batch increase method steps Attn.:click (batch on-line testing) after adding inverter,if there is icon ,pls analyze the malfunction reason.If not , it will work as usual. Start coding Quantity ① ② Inverter 8-bit encoding ① ② P14 Grid SolarBox PV array Mobile PC Load WWW e Grid Modem Micro inverter PC Bothway meter PV array Load Load Family PV power system,MODEM will communicate with inverter by wireless and user can manage power system through Internet. Wireless Wireless Connected to server ※ Each Modem can manage 92PCS intelligent SolarBox ※ Under the same electric box in parallel , the power of micro inverter can not exceed 100kw ※ Each modem can manage 46 pcs micro inverters Industrial PV station solution Family PV station solution Industrial PV power system , transfer the inverter's data to MODEM by intelligent solarbox,then transfer the data to cloud by Internet and user need to connect computer or mobile to cloud , that the user can easy to manage power station.