1 POWERED BY SA Dass Total In Words Indian Rupee Four Crore Fifteen Lakh Fifty-One Thousand Three Hundred Forty Only Please be assured that we always stand for our quality work and quick service. We await your favourable response at the earliest. SAR Engineering Works Plot NO.57/A, Behind Laxmi Petrol Pump, Brick Bunder, Hay Bunder Road, Darukhana, Reay Road (E) Mumbai Maharashtra 400033, India. GSTIN 27ANWPS7988L1ZE Quotation Estimate# : SAR/Quote/22-23 - 022 Estimate Date : 14/09/2022 Expiry Date : 13/10/2022 Place Of Supply : Andhra Pradesh (37) Bill To Ship To Geo Marine Dynamics #401, Business Bay, Near Four Points Sheraton, Visakhapatnam, Andhra Pradesh - 530003 #401, Business Bay, Near Four Points Sheraton, Visakhapatnam, Andhra Pradesh - 530003 Subject : Supply & Fabrication of 15m x 12m x 2m Modular Jack-Up Barge Sr. No Item & Description HSN/SAC Qty Unit Rate Basic Amount IGST Total 1 Complete Fabrication, Fitting & Welding of Deck Plates, Side Shells, Stiffeners, Girders, Bulkheads & Bottom Plates. Deck Plate Thickness - 10mm Bottom Plate Thickness - 10mm Side Shell Thickness - 8mm 995444 108.00 MT 1,26,000.00 1,36,08,000.00 24,49,440.00 1,60,57,440.00 2 Complete Fabrication, Alignment, Fitting & Welding of Complete Spud Arrangement Spud Dia. - 700mm Spud Length - 24m Inclusive of Mud Covers 995444 49.60 MT 1,40,000.00 69,44,000.00 12,49,920.00 81,93,920.00 3 Supply of Grade Steel and Complete Fabrication, Machining & Hardening of Pontoon Lock arrangements, Bushes, Shaft, Cylinder Pin, etc. Approx. 30 T 995444 1.00 Job 69,00,000.00 69,00,000.00 12,42,000.00 81,42,000.00 4 Piping & Ventilation System as per specifications Sewage Pipes, Sounding Pipes, Air Vents, Railings, Manhole etc. 995444 1.00 Job 4,36,000.00 4,36,000.00 78,480.00 5,14,480.00 5 Supply & Fitting of Hydraulic Power Pack System Inclusive of Hydraulic Pipelines, Hoses, Hand Operated Levers, Remote Control System, Electric Panels and all other fittings 995444 1.00 Job 59,90,000.00 59,90,000.00 10,78,200.00 70,68,200.00 6 Complete Sandblasting and Painting of Vessel Inclusive of Copper Slag, Paint and all other consumables 998711 1,500.00 Sq. m 890.00 13,35,000.00 2,40,300.00 15,75,300.00 Total 3,52,13,000.00 63,38,340.00 4,15,51,340.00 2 POWERED BY Terms & Conditions Note: (a) The above rates are inclusive of Material, Labour Charges, Consumables, Gas, Welding Rods, Special equipment, machinery, etc. (b) Cutting Losses @ 3% will be considered for final weight calculation. (c) Final assembly at the required delivery site will be done by us. (d) IRS/ABS/RINA Surveyor if required to be provided and paid by you. All charges for testing and certifications to be borne by you. (e) All Port and Customs clearance to be provided by you. (f) In case of any delay in supply of material/facilities/permit at the worksite by you, our labour wage losses will be provided by you. (g) Marine Primer and Paint will be provided by us. Color to be chosen by you. (h) Hydra/Crane Facility, Electricity & Freshwater on-site to be provided by you. (i) Genset for Hydraulic Power Pack, Anchors & ropes to be provided by you. (j) All Transportation Costs to be borne by you (k) If required any additional work will be charged extra after your approval. Terms & Conditions: (a) Taxes and Duties: IGST as per Govt. Regulations will be Charged Extra. (b) Completion Period: 70 Working Days from the date of issue of Purchase Order/ Advance Payment. (c) Payment Terms: (i) 50 % Advance for procurement of Steel, Consumables, Mobilization and Existing Pontoons (ii) 40 % on Completion of the work on a pro-rata basis. (iii) 10 % after final completion & before delivery.