03 OXAGON NEOM Industrial City NEOM Saudi Arabia MAIL TYPE Workflow Transmittal MAIL NUMBER PAR-WTRAN-347011 REFERENCE NUMBER PAR-WTRAN-347011 Final (WF-135027) 4800001134/000-MST for TARPING AND DE TARPING STATION OF DUMP TRUCKS From Mr Ossama Mohamed - SAUDI ARABIAN PARSONS LIMITED To (5) Cc (5) Sent Thursday, 26 December 2024 2:54:25 PM AST (GMT +03:00) Status N/A NIC.DC Parsons - SAUDI ARABIAN PARSONS LIMITED (+4 more...) Mr 4800001134 BYT - ABYATONA (+4 more...) DOCUMENT ATTACHMENTS (2) ( 0 selected) File Document No Revision Revision Date Title Status 03-150000-4800001134-BYT-CIV-CRS- 000070 03 14/12/2024 4800001134/000-MST for TARPING AND DE TARPING STATION OF DUMP TRUCKS A - Work May Proceed 03-150000-4800001134-BYT-CIV-MST- 000009 03 14/12/2024 4800001134/000-MST for TARPING AND DE TARPING STATION OF DUMP TRUCKS A - Work May Proceed MESSAGE Workflow Review History The attached documents have completed the "4800001134/000-MST for TARPING AND DE TARPING STATION OF DUMP TRUCKS" workflow with the following results : This transmittal was automatically generated. Doc No Step Participant Review Outcome Comments 03-150000-4800001134-BYT-CIV-CRS- 000070 Health & Safety S Ahmed A - Work May Proceed Environment A Haroon A - Work May Proceed Senior Construction Manager O Mohamed A - Work May Proceed 03-150000-4800001134-BYT-CIV-MST- 000009 Health & Safety S Ahmed A - Work May Proceed Environment A Haroon A - Work May Proceed Senior Construction Manager O Mohamed A - Work May Proceed 22/10/2025, 01:55 Aconex https://ksa1.aconex.com/hub/index.html 1/1 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 1 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. Description of work to be done: Give a brief scope of the work covered by this method statement TARPING AND DE TARPING STATION OF DUMP TRUCKS This tarping and de tarping station of dump trucks method of statement and risk assessment is intended to outline the method and sequence of work and highlight the aspects, which requires special attention of execution team during the construction work and to ensure that all the relevant requirements, stipulated in the drawings, speci fications and standards are followed. Workforce representatives consulted during the preparation of this method statement: Muhammad Tariq Ayman Shaheen Role Name Role or area of responsibility Date of visit to work location Signed Date Author: Construction Manager 11 - 09 - 2024 Reviewer *: Muhammad Tariq OHS Manager 11 - 09 - 2024 Specialist reviewer: (if required) The distribution list for method statement: I. Contractor II. Sucontractor III. Safety Team Rev. 03 4800001134 14 - 12 -2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 1 Abdul Monum 14 - 12 -2024 14 - 12 -2024 Abdul Monum File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 3 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. 1. PROJECT LOCATION The culvert to be constructed is located to the south of the Oxagon boundary and crosses the existing Highway 55 as shown in Figure 1.2 & 1.3 below 1. Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 2 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 4 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. 2. PROJECT BRIEF AND SCOPE OF WORKS The following major permanent works are included in this package and are as better described in the Drawings and Specifications: • Excavation of the lines and levels as stated in the Contract Drawings for the construction of culvert works. • On site location of services and protection of these during the construction of the permanent works. • Ground improvement as required. • Construction of foundations for culvert sections • Construction of culvert segments, transportation to site and placing in the works. • Application of waterproofing membranes. • Infill and jointing between precast culverts cells. • Backfill and compaction thereof to culvert sides. • Backfill and compaction thereof above culvert to formation level. • Highway diversion work and traffic management. • Highway reinstatement works on completion. 3. SITE TRAFFIC MANAGEMENT PLAN (TMP) Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 3 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 5 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. UENCE EQ S OF WORK: ❖ Survey/Setting out - All site personnel shall attend the ABYATONA site safety induction. - The survey team will take levels and coordinates set out the location/boundaries of the tarping and de tarping station of dump trucks by use of pegs to mark points on the ground. Tarping and De - tarping Station Site Location ❖ Tarping and De - tarping station Area Preparation - Ground surface clearing, levelling and compaction will be executed on the area of tarping and de - tarping station. ❖ Installation Of Portable Steel Cabins - Conduct a site assessment to identify potential hazards and determine the best location for mobilizing tarping and De - tarping stations. - Choose a mobile crane with the correct rated capacity suitable for the lift considering its capacity and reach. - Ensure the crane i s Inspected by NEOM VVS and in Green or Verified Status. - Perform pre - operation inspections on both the mobile crane and work platform. Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 4 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 6 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organization to o d work: ABYATONA Contractor’s ref. - Check for third party certifications, any damage, wear, or malfunctions for both crane and work platforms. - A lifting appointed person (Level 1) shall prepare a lift plan prior to lifting activities and he shall supervise the unloading of container during mobilization of tarping and De - tarping stations. - Verify safety devices on mobile crane and are in functional. - Position the mobile crane on stable ground, following the manufacturer's specifications. - Set up outriggers or stabilizers to provide additional stability. - Ensure the work platform is in good condition and properly secured. - Use appropriate lifting accessories, such as slings or straps, to attach the work platform securely to the crane's hook. - Follow proper lifting procedures, considering the center of gravity of the load. - Perform a test lift to ensure the load is stable and well balanced. - Establish clear communication signals between the crane operator and the rigger. - Lift the work platform smoothly and at a controlled pace. - Monitor the load during the lift and adjust as needed. - Place the work platform at the designated location. - Detach the lifting attachments using ladder. - Confirm that all safety features of work platform, such as guardrails and access are in place. - Approved third party certification provider shall inspect work platform units before use. - Do not store any materials on work platform. - Speed hump shall be provided 20m ahead from tarping / de - tarping zone and after the tarping zone to control the speed from accidental strike with tarping station or tarping crew. - A lifting appointed person (Level 1) shall prepare a lift plan prior to lifting activities and he shall supervise the loading of container during Demobilization of tarping and De - tarping stations. - Ensure that the crane is properly positioned for the demobilization process. - Set up outriggers or stabilizers to provide additional stability. - Check that all personnel are clear from the lifting area. - Ensure the work platform is in good condition and properly secured. - Use appropriate lifting accessories, such as slings or straps, to attach the work platform securely to the crane's hook. - Follow proper lifting procedures, considering the center of gravity of the load. - Perform a test lift to ensure the load is stable and well balanced. - Establish clear communication signals between the crane operator and the rigger. - Lift the work platform smoothly and at a controlled pace. - Monitor the load during the lift and adjust as needed. - Place the work platform on the low bed for transportation Safely detach the work platform from the crane's hook, following proper procedures. Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 5 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 7 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. - Secure the work platform for safe transportation. Maintain clear communication throughout the demobilization process to ensure safety. - The Tarping and De - tarping station Area will be properly barricaded and safety signages will be installed according to NEOM requirements and standards. Note: The approval of the employer’s representative on this method of statement shall not relieved the contractor of the contractual obligation. Therefore, The site implementation/execution of this method of statement was still subject to further Employer’s representative Instruction to adhere and complete the contract document requirements dur ing inspections and acceptance of the finish product. Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 6 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 8 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. 2. Pre - Inspection of equipments, Daily Inspection checklist. 3. Securing permit for work. 4. Activity supervisor must be available to supervise the activity as planed. 5 Conduct task briefing for sub grade activity. 6 Activity must be done as per approved RAMS. 7 Area must be barricade and traffic will be control during activity. 8 Activity must monitor by safety officer. 9 Involved worker must not stay in front, back of grader and in blind spot. 10 Only trained workers are allowed to work near grader/ Roller. 11 No one will stay in blind spots of equipment and equipment red zone area. 12 Ambulance and male nurse must be available on site during asphalt activity. 13 Stay away minimum 5 meter of equipments while grading work commence. 14 Safe work procedure must be follow while working near to equipments (where not possible no boots on the ground) make safe distance from the equipments minimum 10 meter and stay side wise. Do not stay in front and behind the equipment. Do not do other activity in the area. Safety DO NOT ... Proceed without valid work permit and task briefing checklist DO NOT ... Proceed without competent supervision DO NOT ... Proceed without approved RAMS DO NOT ... Use equipment and vehicles without Neom veri - fi and without Neom QR. DO NOT ... Operate equipment without valid and specific third party certificate DO NOT ... Use mobile phone and earphones during the activity. DO NOT ... Stay in the equipment blind spot area or equipment red zone area. DO NOT ... Use defective hand tools (shavel, hammer) for work Associated documents: Risk assessment(s) ref. no. NEOM - NLF - FRM - 002.01 NEOM Risk Assessment Sub Grade COSHH (Control of Substances Hazardous to Health) assessment ref. Lifting Plan required/appended: Yes:[ ] N/A:[ No] Other attachments (such as drawings) : Yes Permits required? To Enter Electrical (HV (High Voltage)) Electrical (LV (Low Voltage)) General work To break ground Hot work Isolation SBC (Saudi Building Codes) 401 permit Other Indicate those that apply [ ] [ ] [ ] [Yes] [ ] [ ] [ ] [ ] [ ] Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 7 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 9 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. Who is to do the work and supervise it? Give the number and type of personnel — including any specific skills, fitness levels, training or qualifications required. Grader Operator Roller Operator Experienced and Trained workers Activity Supervisor Construction Manager QC Manager QC Engineer / Inspector Safety Officer Crane Operator When is it to be done? Give concerning other activities or events or as dates and times where relevant – such as isolations, shut - downs, and the like. Activity will be start after approval of PMC through aconex. A safe means of access to and from the work: (with adequate routes for pedestrians and vehicles) Safe and compacted temporary access maintained with signages. A safe place of work: Checks to be made on adjacent activities including any restriction or precautions necessary. Define where to stand and any exclusion zones Actvity area must be barricaded and activity will be carried out under direct supervision of activity supervisor. Area safety officer will ensure the activity is on going as per plan and area is safe for work. Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 8 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 10 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. Details of the plant, equipment and materials required: EQUIPMENT AND TOOLS Include any access equipment and that for materials storage and handling a. Mobile Crane b. Low bed trucks c. Boom Truck d. Water tankers e. Grader f. Roller g. Excavator h. Loader i. Hand tools j. Dump TRucks 1. MATERIALS • Portable Steel Cabins Mandatory PPE (Personal Protection Equipment) and Mandatory PPE: Task - specific PPE and RPE: additional PPE or RPE required: Gloves (suitable for the task) Hard hat Dust Mask High - visibility Vest Safety Shoes Heat resistance (with steel toecap & mid - sole) Clear Safety Glass Waste removal: Will any waste be produced? Yes:[Y] No:[ ] If yes, give removal details below Removal arrangements: Asphalt waste will be transported by dump truck in temporary waste storage area for disposal. Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 9 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 11 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. Specific environmental considerations: • Ensure that all equipment is inspected not emitting any black smoke and in good condition prior startingwork • Any equipment emitting black smoke shall be stopped and checked/repaired before continue to use or removed from site if not repairable • Planed maintenance of the equipment. • Minimizing idling and switch off equipment and vehicles when not in use • Emissions from vehicles, plant or stationary equipment (generators, etc.) shall be subject to daily visual inspection for the presence of dark/black emissions. • Store construction material at site in a safe and responsible manner to preserve the quality of the material. • Transferring of grouted material shall be transfer by safe manner and to ensure no spillage on bareground. • In case of any oil and fresh concrete spill on bare ground, the contaminated soil shall be immediately removed and storedadequately. • Ensure the proper housekeeping during the activities and as well as after the job completion. • Chemicals and hazardous materials shall be handled only by operators trained in their handling and use.Evidence of training on handling and use of hazardous materials shall be available on file for audit by NEOM Environment. • Damaged, leaking or empty drums and containers shall be removed from site, • clearly marked(usingspray paint) as leaking / defective and appropriately. • Construction activities which may contribute to airborne dust shall be limited on windy days. • All construction temporary access and haul roads shall be regularly dampened down with water using awater suppression truck Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 10 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 12 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. Emergency procedures: Event Action to be taken Emergency contacts Fire: 1 - Call fire fire fire. 2 - Raise the alarm. 3 - Use the fire extinguisher to control the fire if you are trained, otherwise leave the area. 4 - Leave the area/ building by nearest exit point. 5 - Report to the person incharge in assembly point 6 - Do not return to the building until confirmation from assembly area incharge. 7 - Do not take any risk. Hammad Ahmad OHS Manager 0506193736 Emergency Number 0535968948 Fire 998 Accident: (indicating the location of first aid facilities) Muhammad Tariq OHS Manager 0594330215 Emergency Number 0535968948 Fire 998 Rescue after a fall: NA Rescue from a confined space: NA Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 11 File name: NEOM - NLF - FRM 002.02 Method Statement Printed: 12 September 2024 NEOM - NLF - FRM - 002.02 Method Statement Form MS serial no. Sheet no. 03 - 150000 - 4800001134 - BYT - CIV - MST - 000009 13 of 13 Project name: Construction and Extension of Box Culvert Under HW - 55 Neom project no. Location or site: Neom - OXAGON Date of prep’n: Organisation to o d work: ABYATONA Contractor’s ref. Contingency arrangements: This section detail the arrangements that need to be implemented in the event of something going wrong that is not an emergency – such as in the isolation of pipelines. N/A An assessment of the completed method statement shall be carried out by the workforce at the start of each day’s work. This shall take place at the work location If any problems are identified, this method statement shall be reconsidered and, if necessary, revised. As often as is necessary, the supervisor shall inspect the work and review the RAMS (Risk A ssessment and Method Statements) to verify that the control measures continue to be effective. Any changes required shall be re - assessed and the RAMS shall be updated. Review of method statement when work has commenced: For long - term or recurrent activities, this method statement must be reviewed monthly. Any changes necessary due to changing circumstances should be included below (for example, after any hold points): Date of review Comments Name of reviewer Revisions to this method statement: Rev. no. Date Summary of changes Prepared by Approved by NOTE: A copy of this risk assessment and method statement shall be retained at the work location Rev. 03 4800001134 14-12-2024 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 12 ABYATONA HSE Dept EMERGENCY CONTACT NUMBERS PROJECT: WO - 1134 Name Position Contact No Ayman Shaheen Project Manager 0539058592 Ahmed Nasar Construction Manager 0537021312 Muhammad Tariq Health & Safety Manager 0536040172 Naseer Ahmed Environmental Manager 0583823941 Amir Khan Parsons OHS Specialist 0594431609 Muhammad Mudawi Traffic Manager 0533073627 Shahidul Hameed Site Engineer 0556259224 Ahmad Mohmoud Albalawi Safety Supervisor 0533519659 Ikram Ullah Safety Officer 0508731765 Faisal Khan Safety Officer 0504535261 Anas Nasir Safety Officer 0597856685 Mohammad El Hassan Yahya First Aider 0546723006 Mohammad Rashad Fire Warden 0566911128 Name Position Contact No Ghanim Male Nurse - Day 0547121180 Musa Male Nurse - Night 0509205179 Sikandar Ali Ambulance Driver - Day 0581619301 Salam Ambulance Driver - Night 0539715213 EMERGENCY (NEOM) 014 434 8911 / 911 FIRE 998 POLICE 999 MOH AMBULANCE 997 TRAFFIC POLICE 993 DUBA GENERAL HOSPITAL 041 - 432 - 0114 PDIC - POISON & DRUG INFORMATION CENTER 00966112038222 EMERGENCY RESPONSE TEAM EMERGENCY SERVICES ABYATONA DEVELOPM B E YT N -CI T V-M C ST O -0 0 N 0 0 0 T 9 RACTING COMPANY 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 13 New Design Tarping Station 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 14 New Design Tarping Station Concrete barriers Shaded area protecting workers from direct sun light Worker tarping or de - tarping the sheet with no need to access the rear of the truck Tarping sheet Guard rail Stairs with handrails Road level is adjusted according to the truck’s tipper height by raising or lowering the road level preventing the workers from reaching over hand rails and im - proving the body position (ergonomics) 40 ft Shipping Container 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 15 New Design Top View Stairs Concrete barriers Distance between the two containers can be fitted according to trials by trucks and its dimensions One Way One Way Soil Side berms used to stabilize the containers from movement 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 16 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 17 • Minimized man & machine interface • No more Daily/weekly scaffolding inspection • Improved worker posture / Improved ergonomics • Avoid Workforce fatigue and lower limb injuries • No need to access onto trucks tipper - avoid slip, trip and fall hazard • No full body harness required – fully railed Shade and Air conditioner provided which minimize direct exposure to sunlight • Improved tarping procedure = safer and faster tarping process = less time waiting = less time driver spend waiting in line and performing illegal self tarping NEW DESIGN BENEFITS • 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 18 INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS INCRT16299 PASS : : : : : : : : : CERTIFICATE NO INCRT16299 CERTIFICATE OF THOROUGH EXAMINATION Tarpaulin Station 29-SEP-2024 APPROVED BY THIRD PARTY OWNER DETAILS ABYATONA DEVELOPMENT CONTRACTING COMPANY DAWAT AL JUNDAL Riyadh 12223 WORK ORDER INSJO05501 STICKER NO 017971 TAG NO NA COLOR CODE NA TIME SHEET NO 17205 CHECKLIST NO ECKL11957 Quotation / RFI / RFI_NO / / ITEM DESCRIPTION TARPULIN STATION WORKING PLATFORM SURFACE DIMENSION (in m) L 6 x H 2.6 M x W 2.4M PLATFORM LOAD TEST 500 KG DURATION 15 MIN.PLATFORM CAPACITY (SWL) 240 KG-GUARD RAIL CAPACITY 240 KG. ANY MODIFICATION PLATFORM NEED TO BE INSPECTED AGAIN ITEM LOCATION DUBA VISUAL TEST LOAD TEST FUNCTIONAL TEST WITNESS ONLY TECHNICAL CONSULTANCY AT THE TIME OF INSPECTION BELOW DESIGNATED DETAILS ARE FOUND and THE ITEM WAS EXAMINED THROUGHOUT MANUFACTURER ABAYTONA MODEL/TYPE WORKING PLATFORM MANUFACTURED ON 2024 SERIAL NO EISU 9163117 OWNER ID NA ENGINE POWER NA ENGINE S/N NA CAPACITY / S.W.L. 240 KG WORK PROCEDURE NA STANDARD USED OSHA 1910.29(b)(3) PREVIOUS EXPIRY NA PREVIOUS INSPECTION DETAILS NA ATTACHMENT DETAILS : ITEM DESCRIPTION NA MODEL/TYPE NA SERIAL NO NA CAPACITY NA RESULT NA RECOMMENDATION/CONCLUSION: FOUND SATISFACTORY INSPECTION DATE : 29-SEP-2024 EXPIRY DATE : 28-MAR-2025 AUTHORIZED BY : Sayed Rafik Abdullah INSPECTED BY : MD Farhan Raza YES ✔ NO YES NO ✔ YES ✔ NO YES ✔ NO YES NO ✔ YES NO ✔ APPROVED ✔ REJECTED 03-150000-4800001134-BYT-CIV-MST-000009 Rev. 03 19