G ULF WATER RV R ESORT This scope of work is legally bound to only the estimate number stated above. Page: 1 SCOPE OF WORK: Services provided in the estimate costing for a minimal of (75) units 1. P rovide all brand requested pedestals as p er email sent from Gulf Waters RV 2. Provide all additional m aterial needed to make repairs and corrections for new pedestals 3. Re - s upport ing the water lines, cable boxes, internet phone boxes wi th pressure treated lumber 4. Provide on - site storage unit to house all materials during the project 5. Provide da ily trash removal to keep commu nity clean or orderly 6. Provide a service called “ Hydro excavation ” through Badger Daylighting Inc. 7. Provided each “ unit owner ” documentation , pictures of before/ during/ post pedestal replacemen ts for insurance purposes and warranty 8. All permitting cost are included , Inspections will be scheduled by CoHar Electric LLC 9. All Labor is included for each unit ” Benefits of “ Hydro excavation ” through Badger Daylighting Inc. ” 1. We would remove all dirt/soil from around the existing pedestals without damaging water lines, sewer lines, cable and internet/phone lines and FPL feeder lines 2. T h is will al low a minimal footprint of landscape /pav er disturbance that will lower the cost of rep airing landscap ing by others 3. The dirt/soil that will be disturbed will be removed from site due to possible unknown contamination from o pen sewer lines exposed at ground level in c lose proximity t o the pedestals and RV units. (we have included replacement soil to fill holes) 4. This process allows us to excavat e and install up to (75) units in a two wee k period or possibly (300) units in a two month period starting the day of commencement Exclusions : 1. A minimum of (75) unit sign up is required for us to honor this estimate and scope 2. All finish landscaping and repairs by others 3. All additional electrical items on each site can be reconnected with a dditional cost per NEC code if re quested by o wner. These additional items will be done after the pedestal project is completed as a whole for the community 4. An y units looking to relocate their pedestal to a new location will be s ubject to FPL approval and FPL timeframe con strain ts “ will cause delay in power being restored ” 5. After “ Hydro excavation ” through Badger Daylighting Inc . any pre - existing damage to the current underground infrastructure due to H urricane Ian or age will be documented and will required additi on al fees to rep air if repairs are needed G ULF WATER RV R ESORT This scope of work is legally bound to only the estimate number stated above. Page: 2 Project cost structure: 75 - 100 unit sign u p : $ 2,100.00 per unit 101 - 150 unit sign up: $ 2,025.00 per unit 151 + unit sign up: $ 1,900.00 per unit Current lead time on pedestals are 2 - 4 weeks depending on amount and order date