1 PROJECTS UNDER REP. TG GUINGONA III (Status of projects as of November 2008) MUNICIPALITY OF LANTAPAN BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS LGU Construction of Municipal Trial Court Bldg. 500,000.00 CDF-2T-10M-05 A-05-03889/ 08.25.05 DPWH-I0-DEO Phase I Completed -waiting for additional fund for continuation Kulasihan 1.Construction of Multi- purpose Bldg. (Covered Court) 2.Continuation of the Construction of Multi- purpose Bldg. (Covered Court) PhaseII 3. Livelihood Project for the SK of Kulasihan 4. Renovation of SK Office 1,000,000.00 600,000.00 100,000.00 40,000.00 CDF-30M-2T-04 CDF-20M-3T-05 CDF-10M-1T-07 CDF-1T-07 A-04-03888 ROCS-05-06927/12.1 4.05 ROCS-07-08749/ 11.09.07 DPWH I- DEO DPWH I- DEO DTI-Buk DSWD-Reg 10 Under Small Infra MOA w/ Brgy. MOA with the organization TURNED-OVER/ 05.08.07 Turned-over 09.10.08 Check issued/ October 2008 Bugcaon Construction of Water System Purchase of 1 computer set for Bugcaon National High School 1,000,000.00 50,000.00 CDF-30M-2T-04 CDF-05 A-04-03888 DPWH I- DEO DEPED Division- BUK Admin. TURNED-OVER /08.08.05 Turned-over 07.04.06 2 BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS Bantuanon Construction of Multi- Purpose Bldg (Covered Court) 500000.00 CDF-20M-3T-05 A-05-06489/ 12.12.05 DPWH Phase II Completed *waiting for additional fund for continuation Kibangay Construction of Water System 1,000,000.00 CDF–5M-2T-04 ROX-04-251 / 11.18.04 DPWH I- DEO Contractor TURNED-OVER 04.05.06 Alanib Construction of Flood Control Canal Lining 700000.00 CDF-10M-1T-04 A-05-01415/ 03.09.05 DPWH Contractor TURNED-OVER 04.05.06 Kaatuan Construction of Multi- Purpose Bldg. (Brgy Office) Continuation of Multi- purpose Bldg (Brgy Office-Phase II) 500,000.00 500,000.00 1.CDF-10M-1T-0 4 CDF-1T-10M-07 1.A-05-01415/ 03.09.05 A-07-07323/10.18.07 1.DPWH DPWH-I-DEO Contractor Phase I Completed *waiting for additional fund for continuation -Project Completed Baclayon 1. Legal assistance-Land conflict of BAMCO (Baclayon Multi- purpose Coop) 2. Construction of Multi-purpose bldg. (Covered Court) *** 1,500,000 CDF-20M-1T-08 A-08-06303/ 08.27.08 DPWH I- DEO Decision delivered Pre-implementation activity 3 BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS Victory Poblacion Construction of Multi- purpose Bldg. (Covered Court) Phase I Continuation of the Construction of Multi- purpose Bldg. (Covered Court)Phase II Construction of Farm to Market Road of Sitio Molabuk 1,000,000.00 600,000.00 1,000,000.00 CDF-30M-2T-04 CDF-20M-3T-05 DA-07 A-04-03888 ROCS-05-06927/12.1 4.05 DPWH I- DEO DPWH I- DEO Contractor TURNED-OVER For Implementation Capitan Juan Songco Balila Purchase of 1 computer set for Balila ES Purchase of 1 computer set for Lantapan National High School Sen. Villar DepEd-Division of Bukidnon DepEd-Division of Bukidnon DepEd-Division of Bukidnon DepEd-Division of Bukidnon Turned-over Turned-over 4 Cawayan Construction of Multi- purpose Bldg (Covered Court) Continuation of Covered Court 500,000.00 1,000,000.00 CDF-20M-3T- 05 CDF-20M-1T-08 A-05-06489/ 12.12.05 A-08-06303/ 08.27.08 DPWH I-DEO DPWH I-DEO Contractor Phase I Completed Pre-implementation activity Basac MUNICIPALITY OF IMPASUGONG BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS LGU Community Handicrafts Workshop for Small, Mat, Basket and Hinabol Weavers of Impasugong Financial assistance to LGU 170,750.00 plus 30,000 (20 tribal weavers) 400,000.00 CDF-20M-3T-05 DSWD-REG 10 LGU LMI LGU Completed Implemented Capitan Bayong 1. Construction of Multi-purpose Bldg. (Covered Court) Phase I 2. Continuation of the Construction of Multi- purpose Bldg (Covered Court) Phase II 1. 400,000.00 2. 500,000.00 1. DPWH-CO-04 (Minority) 2. CDF-20M-3T-06 1.A-04-04701 / 12.15.04 2. A-05-06489/12.12.05 1.DPWH I- DEO 2.DPWH I- DEO 1. MOA w/ LGU Phase I Completed Phase II Completed Impalutao Spring Dev’t. Project 700000.00 CDF-30M-2T-04 ROCS-04-04186 / 12.14.04 DPWH I- DEO Admin. Phase I Completed * waiting for additional fund for continuation 5 Kibenton Construction of Water System 1. 500,000.00 1.CDF-30M-2T-04 1.A-04-03888 / 12.13.04 1.DPWH I- DEO 1. Admin. Project Completed Cawayan Construction of School Building 400000.00 CDF-10M-2T-05 A-05-03889/ 08.25.05 DPWH I-DEO MOA w/ LGU Completed as per amount programmed Hagpa BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS Dumalaguing Construction of Water System 500000.00 CDF-20M-3T-05 A-05-06489/ 12.12.05 DPWH I-DEO By Admin Project completed Bontongon Construction of Multi-purpose Bldg. (Health Center) 500000.00 CDF-30M-2T-04 A-04-03888 / 12.13.04 DPWH I- DEO MOA w/ LGU Phase I Completed * waiting for additional fund for ceiling Sayawan Guihean La Fortuna Construction of School building w/ 2 Classrooms Rehabilitation of La Fortuna Communal irrigation System 500,000.00 1,000,000.00 CDF-30M-2T-04 NIA-5M-06 (thru the initiative of Cong. Guingona) A-05-02838/ 07.08.05 DPWH I- DEO MOA w/ LGU Phase I Completed *waiting for additional fund for completion Implemented 6 Poblacion Construction of Pathway at Impasugong Central Elemntary School Turn-over of Guns 200,000.00 NA Villar-05 Budget Continuing Appropriations PNP-CO A-05-02689/ 07.1.05 DPWH I-DEO Turned-over Turned-over Bulonay BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS Kalabugao 1. Construction of Water System at Sitio San Vicente 2 .Construction of Water System at Sitio San Fatima 3 Ricemill Project to KADULUMHAN (Kababayen sa Dumagat ug Lumad sa Hagpa Nagkahiusa) 250,000.00 250,000.00 100,000.00 (275 rural and tribal women) CDF-30M-2T-04 CDF-30M-2T-04 ROCS-04-04186 / 12.14.04 ROCS-04-04186 / 12.14.04 DPWH I- DEO DPWH I- DEO MOA w/ LGU MOA w/ LGU LMI TURNED-OVER 10.15.05 TURNED-OVER 10.15.05 Completed 7 MUNICIPALITY OF CABANGLASAN BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS LGU 1.Completion of Non- Formal Learning Center 2.Maintenance of Road for all the brgys 3. Financial assistance to LGU 250,000.00 1,000,000 500,000.00 CDF-10M-1T-05 CDF-20M-3T-05 CDF-1T-20M-08 ROCS-05-01686/ 03.31.05 ROCS-05-06855/12 .14.05 ROCS-08-06200/ 08.21.08 LGU LGU LGU LGU LGU Implemented Implemented Waiting for the NCA 8 Iba 1. Completion of Multi-purpose Bldg. (Brgy Office) 2. Construction of Water System 300,000.00 3,000,000.00 CDF- Sen. Villar-04 CDF-20M-3T-08 A-05-02689/ 07.01.05 A-08-06303/ 08.27.08 DPWH I- DEO DPWH I- DEO Contractor TURNED-OVER Implemented Cananga-an 1.Construction of Hanging Bridge (Pulangui River) 2. Const. of Farm to Market Road 500,000.00 2,000,000.00 CDF-30M-2T-04 DA-5M-08 A-04-03888 / 12.13.04 A-08-02485/ 03.12.08 DPWH I- DEO DPWH I- DEO Contractor MOA w/ LGU TURNED-OVER 05.02.07 on the process of preparing the MOA Capinonan 1. Purchase of lot for National High School 2.Rehabilitation of Capinonan Communal Irrigation System 250,000.00 400,000.00 CDF-05 NIA-5M-06 LGU NIA Barangay Government Implemented Implemented BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS 9 Anlugan Construction of Add’l. Water System Repair of Classroom E/S 300,000.00 160,000.00 CDF-30M-2T-04 AVE Party List A-04-03888 / 12.13.04 SARO No. B-07-04243 DPWH I- DEO DPWH I-DEO Contractor TURNED-OVER 04.04.06 Implemented Paradise 1. Spring Development of Brgy. Proper 2.Completion of Hanging Footbridge at Bobonawan 200,000.00 80,000.00 1. CDF- Sen. Angara-04 2. DSWD-CO-04 1. A-04-04628 / 12.15.04 2. .N/A 1.DPWH I- DEO 2. DSWD-Reg.X 1. Admin. 2. DSWD-Reg.X TURNED-OVER 04.04.06 2. Project Completed Poblacion Spring Development at Sitio Buso 50000.00 CDF- Sen. Angara-04 A-04-04628 / 12.1504 DPWH I- DEO Admin. Project Completed Freedom Playing Device for Day Care Centers 55000.00 DSWD-CO-04 N/A DSWD-Reg.X DSWD-Reg.X TURNED-OVER 04.04.06 Mandahican BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS 10 Lambagan Building Capabilities of % Women Organizations to Implement and Sustain SEA-K ( Sinanglanan, San Martin, Malaybalay, Imbatug, Cabulohan, Lambagan, Cabanglasan) Additional funds for microlending (Sinanglanan, San Martin, Imbatug, Cabulohan Lambagan ) Construction of Multi-purose Bldg. (Brgy Office) 120,000.00 (125 women microrentrepreneurs) 279,000.00 500,000.00 CDF-1T-10M-07 A-07-07323/10.18.0 7 DSWD REG X DSWD REG X DPWH-I-DEO LMI LMI Completed Implemented Turned Over/ 12.10.08 11 BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS Imbatug Completion of Brgy Office Building Capabilities of % Women Organizations to Implement and Sustain SEA-K ( Sinanglanan, San Martin, Malaybalay, Imbatug, Cabulohan, Lambagan, Cabanglasan) Additional funds for microlending (Sinanglanan , San Martin, Imbatug, Cabulohan Lambagan) Completion of Brgy office 500,000.00 120,000.00 (125 microentrepreneurs) 279,000.00 (125 microentrepreneurs) 300,000.00 CDF- 3T-05 CDF-1T-10M-07 A-07-07323/ 10.18.07 DPWH I- DEO DTI-Bukidnon DTI-Bukidnon DPWH-I-DEO Project Completed as per amount program Completed Implemented Project Completed Cabulohan 12 BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS Mauswagon Construction of Squash Sotrage Bldg for Capinon, Freedom, Mauswagon Multi- purpose Cooperative Construction of Multi-purpose Bldg. 200,000.00 1,000,000.00 CDF-20M-3T-05 CDF-20M-1T-08 ROCS-05-06855/ 12.14.05 A-08-06303/ 08.27.08 LGU DPWH I- DEO LGU TURNED-OVER 10.21.06 Pre-implementation activity Dalacutan Jasaan Construction of Footbridge 500000.00 DA-5M-08 (thru the initiative of Cong. Guingona) A-08-02485/ 03.12.08 DPWH I- DEO MOA w/ LGU On the process of preparing the MOA Mandaing Construction of Add’l. Water System for Mandaing Proper 500000.00 CDF-30M-2T-04 ROCS-04-04186 / 12.14.04 DPWH I- DEO Admin. TURNED-OVER 04.04.06 13 MUNICIPALITY OF SAN FERNANDO BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS LGU Financial assistance to LGU 2500000.00 CDF-1T-20M-0 8 ROCS-08-06200/ 08.21.08 LGU Halapitan Construction of Flood Control project at Halapitan National High School Nala Communal Irrigation System (New Project) Promoting Farm Enterprise through goat production (Namnam, Magkalungay, Halapitan, Malayanan, Cayaga 500,000.00 500,000.00 511,567.10 (6 community based operation) CDF-20M-3T-0 5 NIA-5M-06 (thru the initiative of Cong. Guingona) A-05-06489/ 12.12.05 DPWH I- DEO NIA DSWD REG X Contractor LMI TURNED-OVER 08.11.06 Implemented Implemented Kalagangan 1. Construction of Covered Court 2. Micro-lending Project of Nagkahiusang Kababayen-an sa Kalagangan 1,500,000.00 144,000.00 (223 micro- entrepreneurs) CDF-10M-2T A-05-03889/ 08.25.05 DPWH I- DEO Contractor LMI Phase I Completed * waiting for additional fund for continuation Completed 14 BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS Namnam Construction of Sumpitan Bridge 10000000.00 CDF-30M-2T-0 4 A-04-03888 / 12.13.04 DPWH I- DEO Contractor TURNED-OVER 04.31.07 Bonacao Constriction of spillway for Namnam River 1000000.00 CDF-20M-3T-0 5 ROCS-05-06929/ 12.14.05 DPWH I- DEO Contractor Project Completed as per program -included in the appropriation of the on-going const. of Valencia-Talaingod Road of the DPWH Project Tugop Construction of Multi- purpose Bldg. (Day Care Center) 400,000.00 CDF-30M-2T-0 4 A-04-03888 DPWH I- DEO Contractor Phase I Completed * waiting for additional fund for continuation Little Baguio Durian Electrification Construction of Canal 991,007.00 150,000.00 NEA-04 CDF-30M-2T-0 4 N/A A-04-03888 FIBECO DPWH I- DEO FIBECO Contractor COMPLETED TURNED-OVER 09.29.05 Cabuling 1. Electrification 2. Construction of Multi- purpose Pavements 882,613.00 500,000.00 NEA-04 CDF-20M-1T-0 8 N/A A-08-06303/ 08.27.08 FIBECO DPWH I- DEO FIBECO COMPLETED Pre-implementation activity Sacramento Valley Water System Dev’t. Project 500000.00 CDF-30M-2T-0 4 A-04-03888 DPWH I- DEO Admin. TURNED-OVER 04.06.06 15 Sto. Domingo BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS Malayanan Construction of Farm to Market Road Construction of Farm to Market Road Promoting Farm based enterprise through Goat Production (Namnam, Magkalungay,Halapitan, Malayanan , Cayaga 1,000,000.00 1,000,000.00 700,000 (6 community based organizations DAR Funded project DA-07 E-05-07630/ 12.29.05 DPWH I- DEO DPWH I- DEO DSWD-REG X Lease Contract with LGU LMI Completed *waiting for additional fund for continuation Project On-going Implemented Kibongkog Construction of Water System 150,000.00 CDF- Sen. Angara -04 A-04-04628 / 12.15.04 DPWH I- DEO Admin TURNED-OVER 04.06.06 San Jose Magkalungay Promoting Farm Enterprise through goat production (Namnam, Magkalungay ,cayaga Halapitan, Malayanan, 511,567.10 (6 community based operation) CDF-05 DSWD REG X LMI On-going 16 Dao Construction of Health Center 500000.00 CDF-1T-10M-0 7 A-07-07323/ 10.18.07 DPWH-I-DEO Project completed Nacabuklad Const. of Farm to Market Road 700000.00 DAR-07 DPWH-I-DEO Lease contract with LGU of San Fernando Project Completed BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTIN G AGENCY PROJECT IMPLEMENTOR STATUS Mabuhay Construction of Bridge 2000000.00 CDF- 5M-2T-04 ROX-04-251 / 11.18.04 DPWH I- DEO Admin TURNED-OVER 04.06.06 Matupe Electrification 1110424.00 NEA-04 N/A FIBECO FIBECO COMPLETED Iglugsad Candelaria Palacpacan Electrification 1006200.00 DOE N/A FIBECO FIBECO Project Completed Cayaga Promoting Farm Enterprise through goat production (Namnam, Magkalungay, Halapitan, Malayanan, Cayaga 511,567.10 (6 community based operation) DSWD-Reg.10 Completed Bulalang Completion of Water System 150000.00 CDF- Sen. Angara-04 A-04-04628 / 12.15.04 DPWH I-DEO Admin. Project Completed -ready for turn-over Kawayan 1. Rehabililitation of Communal Irrigation system 2. Const. of Farm to Market Road 600,000.00 700,000.00 NIA-5m-06 DAR-07 DPWH-I-DEO Implemented -Project completed as per amount programmed 17 CITY OF VALENCIA BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS 18 LGU 1.Turn-over of Guns 2. Financial Assistance to LGU-DA 3.Financial Assistance to LGU for the projects of DepEd Interim Division of Valencia includes various projects of schools under Valencia Interim also ; a. Repair of guest house b. 2 units computer c. 3 iarcon units d. 1 unit photocopier machine 4.Financial Assistance to LGU( Valencia City Fire Department) for Purchase of Fire Extinguisher for 31 barangays of Valencia N/A 200,000.00 1,000,000.00 700,000.00 PNP-CO CDF-10M-1T-05 CDF-20M-3T-05 CDF-20M-3T-05 LGU LGU LGU DA-Valencia DepEd Valencia Valencia City Fire Department Turned-over Implemented Turned-over Turned-over 19 BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS LGU 5. Installation of Fire Hydrants to selected areas (Purok 3,5,7,11,12 and Hagkol) and Purchase of Two-way radios 6. Financial Assistance to LGU Valencia for the livelihood projects of Valencia Bukidnon Achievers Multi- purpose Cooperative 7. Financial assistance to LGU Valencia for the Philippine Postal Corporation 8. Financial Assistance to LGU Valencia for the livelihood projects of Valencia City Chamber of Commerce & Industry Livelihood proj 300,000.00 150,000.00 150,000.00 300,000.00 CDF-20M-3T-05 CDF-20M-3T-05 CDF-20M-3T-05 CDF-20M-3T-05 LGU LGU LGU LGU Valencia City Water District Valencia Bukidnon Achievers Multi- purpose Cooperative Valencia Post Office Valencia City Chamber of Commerce & Industry Turned-over Turned-over Turned-over Turned-over 20 BARANGAY PROJECT AMOUNT SOURCE OF FUNDING SARO NUMBER AND DATE ISSUED IMPLEMENTING AGENCY PROJECT IMPLEMENTOR STATUS 9. Livelihood project for Market Vendors Assoc. of Valencia 10. Livelihood project for Valencia Muslim Vendors Association 11. Livelihood project for Valencia Water District Employees Multi-purpose Cooperative 12. Livelihood project for New Life Ministry Foundation Inc. 13. Financial assistance to LGU for the Fire Victims of Valencia Public Market 14. Financial assistance to LGU 291,000,000 291,000,000 291,000,000 200,000.00 500,000.00 1,000,000.00 CDF-1T-07 CDF-1T-07 CDF-1T-07 CDF-1T-07 Se. Villar-08 CDF-1T-20M-08 ROCS-08-06200/ 08.21.08 DTI BUK DTI BUK DTI BUK DTI BUK LGU LGU Turned-over/ 08.01.08 Turned-over/ 09.10.08 Turned-over/ 08.01.08 Turned-over/ 08.01.08 Turned-over/ 08.01.08 Waiting for the NCA