DUMPS BASE EXAM DUMPS SAP C_TS422_2020 28% OFF Automatically For You SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Newly Released SAP C_TS422_2020 Dumps Questions V8.02 | DumpsBase 2021 1.Where do you maintain the duration of a production operation? A. Bill of material (BOM) B. Work instructions C. Material master D. Routing Answer: D 2. You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received . Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? A. Make-to-order production (20) B. Planning without final assembly (50) C. Planning with final assembly (40) D. Planning at assembly level (70) Answer: B 3. In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor . How can you process consumption postings? A. Kanban B. Picking list C. Backflushing D. Transfer Order Answer: B 4. For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question. A. The lot size range must be within the lot-size range of the assigned routing. B. The assigned routing must be a rate routing. C. The deletion flag must NOT be set for the bill of materials (BOM) or the routing. D. The assigned routing and bill of materials (BOM) must be valid in the entire validity period. E. The assigned routing must NOT have alternative sequences. Answer: A,C,D 5. Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question. Newly Released SAP C_TS422_2020 Dumps Questions V8.02 | DumpsBase 2021 A. Functional Location BOM B. Sales Order BOM C. Class BOM D. Work Center BOM Answer: A,B 6. What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question. A. Market intelligence B. Past quotation quantities C. Past procurement quantities D. One-off events E. Past sales order quantities Answer: A,D,E 7. In your project,you have several materials that are planned by different people . How can you assign the planning responsibility? A. MRP type B. MRP group C. MRP controller D. MRP planning file Answer: C 8. What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question. A. Stock transport order B. Production order C. Scheduling agreement schedule line D. Purchase requisition E. Planned order Answer: C,D,E 9. You want to reduce planning efforts for B/C materials . Which planning procedure do you recommend? A. Manual planning without check B. Forecast planning C. Material requirements planning D. Consumption-based planning Newly Released SAP C_TS422_2020 Dumps Questions V8.02 | DumpsBase 2021 Answer: D 10. How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question. A. Documentation of quality data with Quality Management B. Predefined GMP compliant process order types to meet audit requirements C. Use of the GMP compliant flag in relevant master data applications D. Use of the digital signature function to check and run business processes E. Recipe approval (with Engineering Change Management) Answer: A,D,E 11. What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question. A. Create object selection variant for transportation lane-related alerts. B. Assign the alert profile to the overall profile. C. Create object selection variant for product-related alerts. D. Assign the overall profile to the authorization profile. E. Create object selection variant for resource-related alerts Answer: B,C,E 12. Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question. A. Maximum stock level B. Purchase orders C. Safety stock D. Lot size Answer: C,D 13. In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question. A. Production version B. Production cost collector C. Routing D. Repetitive manufacturing profile Answer: A,C 14. What is a work center hierarchy in SAP S/4HANA capacity planning? A. A group of alternative work centers for production, structured in hierarchy levels by Newly Released SAP C_TS422_2020 Dumps Questions V8.02 | DumpsBase 2021 prior ties B. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel C. A group of work centers in a production line being used in sequence for production D. A group of alternative work centers providing a cumulative available capacity for production Answer: D 15. Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing . What is the impact of this decision? Note: There are 3 correct answers to this question. A. Sales order-specific planning run is required. B. Sales order-specific stock is created C. Net requirements calculation is sales order-specific. D. Storage location MRP areas are required. E. Production orders are created with sales order reference. Answer: B,C,E 16. Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question. A. Archiving of documents for assembly scrap B. Posting of production costs to the production cost collector C. Reduction of associated capacity requirements D. Material staging for next order in sequence E. Posting of goods receipt for the product Answer: B,C,E 17. In your plant, MRP is activated . Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question. A. Use a specific material status. B. Use a specific MRP controller. C. Use a specific material group D. Use a specific MRP type. Answer: B,D 18. Mode selection is one of the scheduling options available in Advanced Planning in Newly Released SAP C_TS422_2020 Dumps Questions V8.02 | DumpsBase 2021 SAP S/4HANA. When can you use mode selection? A. When multiple planned orders exists in one resource B. When alternate resourcesare used within one operation C. When multiple production versions are maintained for one product D. When multiple operations are maintained for one product Answer: B 19. Why would you use phantom assemblies? Note: There are 3 correct answers to this question. A. To make the assignment of components easier B. To simplify the structure of bills of material C. To reduce the number of changes required in bills of material D. To increase the number of planning levels E. To reduce the number of material masters Answer: A,B,C 20. Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production . How can you identify all affected finished goods stocks? A. Use the material staging report. B. Use the batch information cockpit. C. Use the material where-used report. D. Use batch determination. Answer: B 21. Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question. A. By-products B. Bulk materials C. Waste products D. Continuous flow materials E. Co-products Answer: A,C,E 22. You have maintained the parameters for simple discontinuation the material master of a component . Which business process will be affected if the available stock is zero and the discontinuation date is in the past? A. Back flushing Newly Released SAP C_TS422_2020 Dumps Questions V8.02 | DumpsBase 2021 B. Material requirements planning C. Production order release D. Kanban Answer: B 23. You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible . Which settings do you make to achieve this? A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator B. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator C. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator D. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator. Answer: D 24. Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question. A. Work center B. Material C. Production version D. Plant Answer: A,B GET FULL VERSION OF C_TS422_2020 DUMPS