June 2017 – June 2019 BARR + WRAY (Spa + Pool Design & Build) PO Box 341246 (Dubai Office) Dubai Silicon Oasis, UAE A leading international Spa & Pool Engineering Consultant – Spa Contactor http://www.barrandwray.com/ Major Projects : Spa Projects – Thermal Cabins (From Schematic Stage to Construction Stage) (Includes Steam Rooms, Saunas, Hammam , Experience Showers, Rassuls , Scrub Rooms, & Ice Fountains) Shangrila Hotel - Jeddah KSA (Revit Project) The Address Hotel – Bahrain (Revit Project) Karl Lagerfield Hotel, Macau Palazzo Versace Hotel - Macau The Address Hotel - Downtown Dubai Dubai Creek Harbour Point - Dubai UAE (The Tower) One Central Hotel - Dubai UAE Sofitel Hotel - Jordan Fairmont Hotel - Abu Dhabi UAE Chedi Ras Al Hadd Development – Oman (Revit Project) ICONIC Hotel - Doha Qatar Pools & Water Features Projects - (From Schematic Stage to Construction Stage) (Includes Lap Pools, Vitality Pools, Salt Pools, Water Features, & Fountains) UAE Pavilion at Expo 2020 – Dubai, UAE (Revit Project) Dubai Creek Harbour Point (The Tower) - Dubai UAE (Revit Project) DMCC Burj 2020 - Dubai, UAE (Revit Project) Chedi Ras Al Hadd Development – Oman (Revit Project) B 4 Hotel Residence - Dubai UAE (Revit Project) Shangrila Hotel - Jeddah KSA (Revit Project) ; & many other projects to mention United Architects of the Philippines National Master Plumbers Association of the Philippines ˃ Well organized, multi - tasked oriented, patient and reliable ; and able to work well under pressure ˃ Skilled in communication and listening and have a good eye for detail and design ˃ Good at problem - solving, and able to make good judgments, and can adapt to new environment and different nationalities ˃ Have organization and management skills and can work well in a team ; always improving, learning, and upgrading ˃ Knowledgeable of architecture, building design, building methods, local & international building code regulations, and materials involved in the construction / repair of buildings, or other structures ˃ Deep understanding of architectural & design principles ; and has MEP engineering background ˃ Familiar with design techniques, principles, engineering conversion tools, and FTP file transfer applications, & large format printing involved in production and documentation of precision technical plans, drawings, and models ; experienced in Revit BIM MEP ˃ Ability to make good design layout recommendations and major / minor corrections on MEP services design and can do coordination work between MEP to MEP coordination & MEP to architectural and structural design coordination with minimal supervision ˃ Knowledgeable in plumbing & drainage design & layout ˃ Has a work experience on Spa Thermal Cabins, Pools & Water Features design ˃ Ability to sketch and able to perform under tight schedules and deadlines with minimum supervision ˃ Effective written and verbal communication skills, and leadership skills to understand different people interact and work with them , u a p , r m p A R C H I T E C T | R E G I S T E R E D M A S T E R P L U M B E R Seeking a challenging and promising career in the field of building design drawings coordination or site supervision work were I can utilize my diverse career experience in the field of Architecture, MEP Engineering, & Building Construction Industry with commitment. 4 years in UAE & 5 years in Philippines. 1111 San Joaquin St. Burauen , Leyte 6516 Philippines camasin.ncc@gmail.com + 63 - 946 - 746 - 3830 https://www.linkedin.com/in/camasin2592/ Autodesk AutoCAD Autodesk Revit MEP Autodesk Naviswork Google SketchUp Vray 3D Rendering Autodesk 3D Max Adobe PhotoShop MS Office Applications Lumion Manual Drafting July 2015 – June 2017 Ian Banham & Associates (MEP Consulting Engineers) P.O. Box 23901 (Main Office) Dubai, UAE A leading MEP Engineering Consultant in Dubai U AE http://ianbanham.squarespace.com/ Revit - Mechanical Draftsman (General) Major Projects : Revit MEP LOD 300 (Production Stage) & LOD 400 (Coordination Stage) – Building Information Modeling Hamad Medical City HGH Trauma & Emergency Expansion - Doha, Qatar National Health Laboratories - Mesaimeer District Doha, Qatar Audi, Volkswagen & Porsche Body & Paint Work Shop - Dubai Industrial City, UAE 2 Basements + Shopping Mall Ground & Mezzanine + 4 Floors Hotel & Hotel Apartments - Hor Al Anz East Dubai, UAE Najaf Alashraf International Airport Terminal 2 - Najaf, Iraq 2 D MEP Cad Production - Single Line & Double Line Projects (Mechanical - HVAC, Chilled Water, Smoke Control, Fire Protection, LPG, Drainage System & Water Supply) Jewel of the Creek Development - Port Saeed, Dubai Deira Waterfront Development (Mixed - used Development) - near Deira Fish Market, Deira Dubai UAE Centro Hotel – Jumeirah Village Circle, Dubai UAE Al Majed Tower @ Lusail - Marina Lusail , Qatar JGE Head Office Building - Dubai, UAE Peacock Park – Jumeirah Emirates Towers, Dubai UAE Vida Hotel & Residential Villas – Fujairah, UAE 3 Basements + Ground + 15 Floors Hotel Building – Al Barsha Dubai, UAE Development of B+G+M+ 4 / 7 Mixed Used Building & G+ 4 +R Multi - Storey Car Park Building - Dafz , Dubai UAE Jubail Hotel - Dubai UAE Katara Hotel - Lusail Qatar UAE Embassy - Kabul, Afghanistan National Health Laboratories - Mesaimeer District Doha, Qatar 2 B+G+ 11 Floors Hotel Building – Jumeirah Beach Residences Al Marsa , Dubai UAE, ; & many other projects to mention Designation : Junior BIM Revit Designer / BIM Draftsman - 2 D Cad & BIM projects ˃ Starts a project as per project director’s instructions and requirements ; collaborating with senior project engineer for the development & technical aspects of the projects ˃ Cad designing & drafting for 2 D projects ; BIM modelling, coordination, & drafting for BIM projects from schematic phase to construction / installation phase ˃ Preparation of RFI, RFA, shop drawings, manufacturing drawings, technical specifications, & material approval submissions ˃ Response to consultants queries ; review & implement consultants CAD / BIM drawing protocol ; uploading and downloading project files from consultants either via email, link, BIM 360 , BIMTrack , or project website ˃ Created Revit families for project use from simple to complex Spa & Pool mechanical / plumbing equipments , fixtures, & in - place models ; downloading Revit families from manufacturers website if available ˃ Drawing Production / Packages ˃ Clash Detection and Drawing Coordination ˃ Architectural Design ˃ Presentation Drawings ˃ 3D Revit BIM Modelling (Architectural, Structural, MEPF) ˃ 3D Revit Object / Families / Components with complete parametric and materials content. ˃ SketchUp modelling and rendering ˃ Area tabulation and basic material estimate Date of Birth : Current Address : Mobile No. : Nationality : Faith : Civil Status : Language Spoken : Visa Status : Driving License : Availability : Architect Catherine G. Cepeda , uap Circuit Mixed Use TSD Supervisor Makati Development Corporation Circuit Makati Operation Center Brgy . Carmona, Sta. Ana Makati City Philippines +63916 - 434 - 2649 Yasser Suleiman Senior Director, Mechanical Design Ian Banham and Associates Dubai, United Arab Emirate s +971 4 370 5777 ibadxb@ianbanham.com Architect Rodel T. Mallari, uap Project Manager / Development Control Manager Aseana Business Park Estate Association Aseana City Paranaque, Philippines +63921 - 763 - 8064 July 25, 1992 1111 San Joaquin St. Burauen , Leyte 6516 Philippines +63 - 946 - 746 - 3830 Filipino Christian Married with 1 dependant English, Tagalog (Filipino) Eligible for Employment Visa Philippine License Can join immediately All the above - mentioned details are true to the best of my knowledge and I assure to provide the necessary testimonials and/or proofs to validate and substantiate the same January 2014 – June 2014 D.M. Wenceslao & Associates / Aseana Business Park Estate Association Aseana City Paranaque, Philippines A real estate company located at Aseana City Paranaque owned & managed by Wenceslao family http://aseanacity.com/ Designation : CADD Operator / Architectural Staff - Planning Department / Development Control Office ˃ Responsible for the preparation of Cad drawings / layout schemes / presentations for the assigned tasks ˃ Assigned to prepare design concepts & schemes for the proposed Central Bus Station complex with office & residential towers ˃ Updating of Master Plan to monitor saleable lots for marketing purposes ˃ Preparation of Lot Restrictions for saleable lots based on their Design Standard Guidelines for Planned Unit Development (PUD) ˃ Preparation of area tabulations & GFA computations for design review to make sure lot owners follow restrictions on their Design Standard Guidelines ˃ Assigned to supervise office renovations / interior fit - out of Aseana offices and prepared accomplishment reports ˃ Collaborated with the Development Control Officers for the Daily Site Inspections and Monitoring of site constructions in Aseana City ˃ Prepare punch list at Aseana Two and S & R facade owner side projects at Aseana City ˃ Attend and participate in coordination meetings ˃ Attend construction related presentation, seminars and product presentations Licensure Examination for Architects Passed 82.0% - January 2015 Professional Regulation Commission | Board of Architecture Manila, Philippines Licensure Examination for Master Plumber Passed 72.2% - February 2015 Professional Regulation Commission | Board of Master Plumber Manila, Philippines June 2014 – July 2015 Makati Development Corporation (General Contractor) Circuit Mixed Used Project, a mixed - used development in Circuit Makati by Ayala Land Corporation Brgy . Carmona, Sta. Ana Makati City Philippines http://www.mdc.com.ph/ Designation : BIM Revit Modeler – Technical Services Department (TSD), (Site - based) from October 2014 – July 2015 ˃ Responsible for the preparation & sheet generation of shop drawings, RFI ( Request for Information ), RFA ( Request for Approval ), & transmittals ˃ Modeling & Sheet generation of Basement Plumbing Layout, Sump Pit Details, & Elevator Pit details for approval from Consultants & IFC issuance for Construction Operations Group ˃ Updates the base plan coordinates for every changes in plans & according to answered RFI’s, latest FCD, & issued Construction Bulletin ˃ Sheet generation of Bored Pile Coordinates, Pile Cap Coordinates, Column Coordinates of Basement Level for approval from Consultants & IFC issuance for Construction Operations Group ˃ Sheet generation of Basement Column Setting out Plan for approval from Consultants & IFC issuance for Construction Operations Group ˃ Sheet generation of Basement Beam Setting out Plan & Slab depression plan for approval from Consultants & IFC Issuance for Construction Operations Group ˃ Sheet generation of Ramp details for approval from Consultants & IFC issuance for Construction Operations Group ˃ Sheet generation of Basement Wall Staking plan for approval from Consultants & IFC issuance for Construction Operations Group ˃ Sheet generation of Basement Toilet Tile Setting out plan & Toilet CSD ( Combined Services Design ) for approval from Consultants & IFC issuance for Construction Operations Group ˃ 3 D modeling, detailing & layouting of construction methodologies proposed by Project - In - Charge (PIC) ˃ Assist on updating of weekly BIM LOD 300 (Design Intent Model) & BIM LOD 400 ( Issued for Construction ) Monitoring Accomplishment Report ˃ Documentation of RFI (Request for Information) & RFA (Request for Approval) monitoring for reference Cadd Operator – Technical Services Department (TSD), (Site - based) from June 2014 – October 2014 ˃ Review & monitoring of conflicts in plans based on Schematic Design Plans, Design Development Plans, & Issued For Construction Drawings ˃ Responsible for the preparation & sheet generation of shop drawings, RFI ( Request for Information ), RFA (Request for Approval) , & transmittals ˃ Assist on the preparation & editing of 3 D sequencing of PEP ( Project Execution Plan ) & construction methodology ˃ Assist on drafting of the proposed Temporary Road Layout, Temfacil Plans, Tower Crane Layout, Logistics, & details for PEP( Project Execution Plan ) presentation using SketchUp & Photoshop ˃ Responsible for the drafting of Bored Piling Works construction methodology ˃ Performs weekly site documentation & coordination ˃ Attends design coordination meeting for clarification of conflicts on plans & other technical issues and preparing minutes of the meeting ˃ Prepared Base Plan Coordinates of Bored Piles, Columns, Pile Caps, & Temfacil , Temporary Road way, & logistics ˃ 3 D modeling, detailing & layouting of construction methodologies proposed by Project - In - Charge (PIC) ˃ Documentation of Issued Drawings of consultants & other monitoring activities for reference ˃ Documentation of RFI ( Request for Information ), RFA ( Request for Approval ) monitoring for reference ˃ Assisted on preparing the presentation for DCM & PTG meeting ˃ Assist on reviewing & editing of Submittal Log Registry for forwarding to QS & other queries ˃ Attends Toolbox Meeting ˃ Participated in BIM Revit Workshop ˃ Attend Product Demo conducted by the suppliers Jim Mcdonald Projects Director Barr + Wray, FZE Dubai Branch Dubai Silicon Oasis, United Arab Emirate s JMcdonald@barrandwray.com Bachelor of Science in Architecture 2008 – 2013 Eastern Visayas State University, Tacloban City Philippines Secondary Education 2004 – 2008 Burauen Comprehensive NHS, Burauen , Leyte Philippines Elementary Education 1998 – 2004 Burabod Elementary School, Burauen , Leyte Philippines How to Deal and Win Client Speaker : Architect George S Salvan , fuap September 2008 Kanhuraw Convention Center, Tacloban City Leyte Philippines Construction Management Speaker : Architect George S Salvan , fuap August 2008 Kanhuraw Convention Center, Tacloban City Leyte Philippines Creativeness in Design and Construction Speaker: Architect Edilberto F. Florentino, fu ap August 2009 Tacloban Convention Center, Tacloban City Leyte Philippines The Business of Architecture Speaker: Architect Miguel Guerrero, f uap September 2010 Tacloban Convention Center, Tacloban City Leyte Philippines Urbanisasyon Han Tacloban , Metamorposis of City Planning October 2010 Speaker: Architect Primier Siegfried Solajes,uap ., Engr. Manuel Serdan , Engr. Roberto V. Muñoz - Tacloban City Leyte Philippines Design Conceptualization Speaker: Architect Leartes G. Tabotabo Jr., uap January 2011 Tacloban Convention Center, Tacloban City Leyte Philippines United Architects of the Philippines Students Auxiliary AREA C Assembly October 2011 San Remigio , Cebu, Philippines MDC Site Safety Orientation July 2014 Circuit Makati Operation Center, Brgy . Carmona, Sta. Ana Makati City Philippines BIM Revit Workshop September 2014 Circuit Makati Operation Center, Brgy . Carmona, Sta. Ana Makati City Philippines Raw Plug and Husqvarna product seminar conducted by Tech. Engineer of Cut & Break Diamond Products, Inc November 2014 Circuit Makati Operation Center, Brgy . Carmona, Sta. Ana Makati City Philippines 20 th World Building & Construction Exposition March 11 - 15 2015 World Trade Center, Manila Philippines 41st UAP National Convention & Business Meeting for Architects April 16 - 19 2015 SMX Convention Center, Pasay City Manila Philippines June 2009 – October 2013 Ar. Ariel T. Camasin , uap Architect | Designer | Design & Build Burauen Leyte, Philippines Designation : Architectural Apprentice ( Project includes residential, commercial, educational buildings, mausoleum, resort, repair, & renovation ) ˃ Prepared AutoCad working drawings, material estimates, BOQ, 3 D presentations, and preparation of necessary contract documents for building permit application ˃ Prepared proposed architectural plans, as - built plans and details through manual drafting, and conducted site verification and measurement ˃ Prepares Payroll, Weekly Accomplishment Report, & Weather Report ˃ Performs Weekly Site supervision, inspection, updates at construction sites ˃ Assist in the preparation of specifications, material canvassing, & meeting with client ˃ Checked and inspected materials and quality of work delivery Sample of works is available upon request