16'-0" 6'-0" 1'-6" 8'-6" 20'-0" 6'-3" 2'-6" 5'-3" 3'-0" 3'-0" 20'-0" 6'-6" 3'-0" 4'-6" 3'-0" 3'-0" 16'-0" 2'-6" 3'-0" 5'-0" 3'-0" 2'-6" D01 D02 STORAGE KITCHEN DINING ROOM LIVING ROOM OPEN ABOVE P1 P1 UP. 1'-2" 2'-6" 8 12 " 7'-4" 2'-8" 5'-0" 6'-10 12 " 4'-0" 9'-6" 5'-0" DIA. SPRIAL STAIR F WOOD STOVE 6'-5 12 " EDGE OF PARTIAL SECOND FLOOR ABOVE W02 W01 W01 W01 W01 W03 14'-7 12 " W1 W1 W1 W1 W2 6'-5" 1 A3.0 1 A3.0 B4 BEAM ABOVE 1 A3.0 1 A3.0 2'-1 12 " STRUCTURE NOTE SHEET A1.0 8X8 TIMBER POST 5- 2X12 SPF No.2 BUILT-UP BEAM P1: B4: W1: 6X6 ROUGH-CUT JACK PINE TIMBER CONT. GASKET / SEALANT BETWEEN COURSES EXPOSED INTERIOR FACE W2: 1X6 PINE T&G / WOOD PANELING 2X4 SPF STUD FRAMING @ 16" O.C. 1X6 PINE T&G / WOOD PANELING 1 A1.0 GROUND FLOOR PLAN 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC AS NOTED A1.0 MHC-1620-26 GROUND FLOOR PLAN WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION 16'-0" W05 4'-3 1 4 " 2'-0" 9'-8 3 4 " 20'-0" 3'-0" 3'-0" 14'-0" 16'-0" 2'-6" 3'-0" 5'-0" 3'-0" 2'-6" 20'-0" 3'-0" 3'-0" 14'-0" W04 W04 W04 W04 OPEN BELOW 5'-0" 4'-2 3 4 " 5'-9 1 4 " 6'-2" 3'-4" CHIMNEY PIPE BEDROOM EDGE OF SECOND FLOOR 5'-0" DIA. SPRIAL STAIR DN. 1'-0 3 4 " 2'-7" 1'-4 1 4 " GUARD RAIL W1 W1 W1 W1 W3 1 A3.0 1 A3.0 W01 1 A3.0 1 A3.0 W1: 6X6 ROUGH-CUT JACK PINE TIMBER CONT. GASKET / SEALANT BETWEEN COURSES EXPOSED INTERIOR FACE W3: 1X6 PINE T&G / WOOD PANELING 2X4 SPF STUD FRAMING @ 16" O.C. 1X6 PINE T&G / WOOD PANELING 1 A1.1 SECOND FLOOR PLAN 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC 1/4 "= 1' 0" A1.1 MHC-1620-26 SECOND FLOOR PLAN WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION RIDGE LINE 18'-0" 18'-0" 22'-0" 22'-0" 8:12 SLOPE 8:12 SLOPE EXT. WALL BELOW 1 1'-0" 21'-0" 1'-0" 1'-0" 16'-0" 1'-0" 1'-0" 16'-0" 1'-0" 1'-0" 20'-0" 1'-0" 9'-0" 9'-0" 9'-0" 9'-0" 2 3 4 W1 1. CONT. VENTED RIDGE / RIDGE CAP 2. CONT. VENTED SOFFIT @ EAVES - TYP. 3. NON VENTED SOFFIT @ RAKES - TYP. 4. INSULATED CHIMNEY THROUGH ROOF -SIZE TO MATCH STOVE R1: 26 GA PREFINISHED METAL ROOFING ROOF UNDERLAYMENT 5/8" PLYWOOD SHEATHING R-24 MINERAL WOOL BATT INSLATION 2X10 SPF RAFTERS @ 16" O.C. 6 MIL POLY VAPOUR BARRIER WOOD CEILING FINISH MiTek RT7A-TZ rafter tie 1 A1.2 ROOF PLAN 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC 1/4" = 1'-0" A1.2 MHC-1620-26 ROOF PLAN WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION W01 W04 W01 W04 GRADE T/O FIRST FLOOR T/O SECOND FLOOR T/O 2X6 TOP PLATE T/O RIDGE 0'-0" 1'-10" 10'-8 3/4" 17'-10 3/4" 24'- 1" 1'-10" 8'-10 3 4 " 7'-2" 6'-2 1 4 " 6 5 2 7 9 8 10 12 8:12 2. CONT. VENTED SOFFIT @ EAVES - TYP. 5. 26 GA PREFINISHED METAL ROOFING 6. VERTICAL 1X10 BOARD & 1X3 BATTEN CLADDING - TYP. 7. 6" INSULATED CHIMNEY - TYP. 8. 1X6 WOOD WINDOW & DOOR TRIM - TYP. 9. 1X10 VERTICAL WOOD BOARD SKIRTING W/ 1X3 BATTENS - TYP. 10. PREFINSHED ALUMINUM FASCIA - TYP. AT EAVES AND RAKES 12. 6" X 6" ROUGH-SAWN TIMBER WALL, HORIZONTALLY STACKED - TYP. 1 A2.0 NORTH ELEVATION 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC 1/4"=1'-0" A2.0 MHC-1620-26 NORTH ELEVATION 2 MHC-1620-26 23/SEP/26 WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION W01 W04 D01 GRADE T/O FIRST FLOOR T/O SECOND FLOOR T/O 2X6 TOP PLATE T/O RIDGE 0'-0" 1'-10" 10'-8 3/4" 17'-10 3/4" 24'- 1" 1'-10" 8'-10 3 4 " 7'-2" 6'-2 1 4 " 7 5 10 8 9 12 5. 26 GA PREFINISHED METAL ROOFING 7. 6" INSULATED CHIMNEY - TYP. 8. 1X6 WOOD WINDOW & DOOR TRIM - TYP. 9. 1X10 VERTICAL WOOD BOARD SKIRTING W/ 1X3 BATTENS - TYP. 10. PREFINSHED ALUMINUM FASCIA - TYP. AT EAVES AND RAKES 12. 6" X 6" ROUGH-SAWN TIMBER WALL, HORIZONTALLY STACKED - TYP. 1 A2.1 EAST ELEVATION 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC AS NOTED A2.1 MHC-1620-26 EAST ELEVATION 2 MHC-1620-26 23/SEP/26 WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION W05 GRADE T/O FIRST FLOOR T/O SECOND FLOOR T/O 2X6 TOP PLATE T/O RIDGE 0'-0" 1'-10" 10'-8 3/4" 17'-10 3/4" 24'- 1" 1'-10" 8'-10 3 4 " 7'-2" 6'-2 1 4 " W06 6 5 2 9 7 8 10 8:12 12 2. CONT. VENTED SOFFIT @ EAVES - TYP. 5. 26 GA PREFINISHED METAL ROOFING 7. 6" INSULATED CHIMNEY - TYP. 8. 1X6 WOOD WINDOW & DOOR TRIM - TYP. 9. 1X10 VERTICAL WOOD BOARD SKIRTING W/ 1X3 BATTENS - TYP. 10. PREFINSHED ALUMINUM FASCIA - TYP. AT EAVES AND RAKES 12. 6" X 6" ROUGH-SAWN TIMBER WALL, HORIZONTALLY STACKED - TYP. 6. VERTICAL 1X10 BOARD & 1X3 BATTEN CLADDING - TYP. 1 A2.2 SOUTH ELEVATION 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC AS NOTED A2.2 MHC-1620-26 SOUTH ELEVATION 2 MHC-1620-26 23/SEP/26 WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION W01 W04 W01 GRADE T/O FIRST FLOOR T/O SECOND FLOOR T/O 2X6 TOP PLATE T/O RIDGE 0'-0" 1'-10" 10'-8 3/4" 17'-10 3/4" 24'- 1" 1'-10" 8'-10 3 4 " 7'-2" 6'-2 1 4 " 11 5 10 8 9 7 12 5. 26 GA PREFINISHED METAL ROOFING 7. 6" INSULATED CHIMNEY - TYP. 8. 1X6 WOOD WINDOW & DOOR TRIM - TYP. 9. 1X10 VERTICAL WOOD BOARD SKIRTING W/ 1X3 BATTENS - TYP. 10. PREFINSHED ALUMINUM FASCIA - TYP. AT EAVES AND RAKES 12. 6" X 6" ROUGH-SAWN TIMBER WALL, HORIZONTALLY STACKED - TYP. 6. VERTICAL 1X10 BOARD & 1X3 BATTEN CLADDING - TYP. 11. PROPANE REFRIGERATOR VENT - SEE APPLIANCE INSTALLATION REQUIREMENTS 1 A2.3 WEST ELEVATION 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC 1/4"-1"-0" A2.3 MHC-1620-26 WEST ELEVATION 2 MHC-1620-26 23/SEP/26 WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION W1 R1 W3 F2 F1 KITCHEN BEDROOM ATTIC A C B GRADE T/O FIRST FLOOR T/O SECOND FLOOR T/O 2X6 TOP PLATE T/O RIDGE 0'-0" 1'-10" 10'-8 3/4" 17'-10 3/4" 24'- 1" 1'-10" 8'-10 3 4 " 7'-2" 6'-2 1 4 " W06 W05 8:12 SPIRAL STAIRS X X X X X X X X TO BE DRAWN SPIRAL STAIRS TO BE DRAWN B1 B1 S1 P1 P1 B4 14 13 W1 B2 W1: 6' X 6' ROUGH-CUT JACK PINE TIMBER CONT. GASKET / SEALANT BETWEEN COURSES EXPOSED INTERIOR FACE W3: 1X6 PINE T&G / WOOD PANELING 2X4 SPF STUD FRAMING @ 16" O.C. 1X6 PINE T&G / WOOD PANELING R1: 26 GA PREFINISHED METAL ROOFING ROOF UNDERLAYMENT 5/8" PLYWOOD SHEATHING R-40 BATT INSULATION BETWEEN 2X10 SPF No.2 RAFTERS @ 16" O.C. 6 MIL POLY AIR / VAPOUR BARRIER WOOD CEILING FINISH F1: 2X10 SPF NO. 2 FLOOR JOISTS @ 16' O.C. R-31 MIN. BATT INSULATION BETWEEN 3/4" T&G STRUCTURAL SUBFLOOR JOISTS CONTINUOUS AIR / WIND BARRIER 1/2" EXTERIOR-GRADE PLYWOOD UNDERSIDE PROTECTION F2: 3/4" T&G STRUCTURAL SUBFLOOR 2X12 SPF NO. 2 FLOOR JOISTS @ 16 O.C. JOISTS @ 16" O.C. 2X10 SPF No. 2 CEILING JOIST @ 16" O.C. CEILING JOISTS 10X10 TIMBER SLEEPER, S1: 10'-0" + 6'-0" SEGMENTS 5-2X12 SPF No.2 BUILT UP GIRDER B1: 4-2X12 SPF No.2 BUILT UP GIRDER B2: 4-2X12 SPF No.2 END BEAM B3: 5- 2X12 SPF No.2 BUILT-UP BEAM B4: 13. 8" MIN. COMPACTED GRANULAR 'A' BASE GEOTEXTILE SEPARATOR OVER PREPARED SUBGRADE 14. MACLEAN DUCKBILL DB-138 EARTH ANCHOR W/ GALVANIZED STEEL - TENDON SEE STRUCTURAL ANCHORAGE DETAILS. 1 A3.0 NORTH SECTION 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 NORTH SECTION NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT DESIGN NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 20' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC AS NOTED 16X20 mattawa hunt camp_for_Reddit 1 MHC-1620-26 23/SEP/26 WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION GRADE T/O FIRST FLOOR T/O SECOND FLOOR T/O 2X6 TOP PLATE T/O RIDGE 0'-0" 1'-10" 10'-8 3/4" 17'-10 3/4" 24'- 1" 1'-10" 8'-10 3 4 " 7'-2" 6'-2 1 4 " 1 2 3 5 6 4 W01 W04 W01 BEDROOM DINING ROOM D02 B1 B4 F2 F1 W1 W1 R1 15 W4 W4 14 13 P1 S1 W1: 6' X 6' ROUGH-CUT JACK PINE TIMBER CONT. GASKET / SEALANT BETWEEN COURSES EXPOSED INTERIOR FACE WALL ASSEMBLY: SHEET A3.1 R1: 26 GA PREFINISHED METAL ROOFING ROOF UNDERLAYMENT 5/8" PLYWOOD SHEATHING R-40 BATT INSULATION BETWEEN 2X10 SPF No.2 RAFTERS @ 16" O.C. 6 MIL POLY AIR / VAPOUR BARRIER WOOD CEILING FINISH F1: 2X10 SPF NO. 2 FLOOR JOISTS @ 16' O.C. R-31 MIN. BATT INSULATION BETWEEN 3/4" T&G STRUCTURAL SUBFLOOR JOISTS CONTINUOUS AIR / WIND BARRIER 1/2" EXTERIOR-GRADE PLYWOOD UNDERSIDE PROTECTION F2: 3/4" T&G STRUCTURAL SUBFLOOR 2X12 SPF NO. 2 FLOOR JOISTS @ 16 O.C. JOISTS @ 16" O.C. 2X10 SPF No. 2 CEILING JOIST @ 16" O.C. CEILING JOISTS 8X8 TIMBER POST P1: STRUCTURE NOTE SHEET A3.1 10X10 TIMBER SLEEPER, S1: 10'-0" + 6'-0" SEGMENTS 4-2X12 SPF No.2 END BEAM B3: 5- 2X12 SPF No.2 BUILT-UP BEAM B4: 13. 8" MIN. COMPACTED GRANULAR 'A' BASE GEOTEXTILE SEPARATOR OVER PREPARED SUBGRADE 14. MACLEAN DUCKBILL DB-138 EARTH ANCHOR W/ GALVANIZED STEEL - TENDON SEE STRUCTURAL ANCHORAGE DETAILS. 1 A3.1 EAST SECTION 1/4"= 1'-0" 1 MHC-1620-26 09/SEP/26 EAST SECTION NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT DESIGN NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' x 20 HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC AS NOTED A3.1 D 1 MHC-1620-26 24/SEP/26 WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION A C B 1 2 3 5 6 4 B1 P1 ABOVE P1 ABOVE 7'-8 1 4 " 7'-8 1 4 " 15'-4 12 " 4'-9 12 " 3'-3 12 " 1'-6" 4'-9 12 " 4'-9 12 " 19'-2" 1 2 3 5 6 4 A C B B1 B1 B3 S1 S1 S1 S1 S1 S1 B3 B2 B2 X X X X X X 16 22'-0" 26'-0" A1 A1 A1 20'-0" 16'-0" 17 8X8 TIMBER POST P1: 10X10 TIMBER SLEEPER, S1: 10'-0" + 6'-0" SEGMENTS 5-2X12 SPF No.2 BUILT UP GIRDER B1: 4-2X12 SPF No.2 BUILT UP GIRDER B2: 4-2X12 SPF No.2 END BEAM B3: MACLEAN DUCKBILL 138-DB1 DRIVEN A1: EARTH ANCHOR C/W 5/16" GALV. WIRE ROPE, TYP. OF 12 16. 8" COMPACTED GRANULAR 'A' PAD OVER NON-WOVEN GEOTEXTILE SEPARATOR. EXTEND PAD 3'-0" MIN. BEYOND BUILDING FOOTPRINT. GRADE TO DRAIN AWAY FROM STRUCTURE. 17. A1 ANCHORS ALIGNED WITH STRUCTURAL GRID - SEE ANCHOR CONNECTION DETAIL X/SX.X 1 S1.0 FOUNDATION PLAN 1/4"= 1'-0" 1 MHC-1620-26 15/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC 1/4"-1"-0" S1.0 MHC-1620-26 FOUNDATION PLAN 2 MHC-1620-26 24/SEP/26 WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION A C B 1 2 3 5 6 4 B2 B2 P1 B3 B3 7'-8 1 4 " 7'-8 1 4 " 15'-4 12 " 4'-9 12 " 3'-3 12 " 1'-6" 4'-9 12 " 4'-9 12 " 19'-2" 1 2 3 5 6 4 A C B P1 2X10 SPF No. 2 @ 16" O/C C/W SOLID BLOCKING 2X10 SPF No. 2 @ 16" O/C C/W SOLID BLOCKING B1 B1 B1 18 20'-0" 16'-0" 8X8 TIMBER POST 5- 2X12 SPF No.2 BUILT-UP BEAM P1: B4: 18. PROVIDE 2- 2X10 SPF No.2 FLOOR JOISTS ALIGNED DIRECTLY BELLOW SPIRAL STAIRCASE CENTER POST / BASE PLATE. 1 S1.1 FIRST FLOOR FRAMING PLAN 1/4"= 1'-0" 1 MHC-1620-26 15/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC 1/4"-1"-0" S1.1 MHC-1620-26 FIRST FLOOR FRAMING PLAN WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION A C B 1 2 3 5 6 4 7'-8 1 4 " 7'-8 1 4 " 15'-4 12 " 4'-9 12 " 3'-3 12 " 1'-6" 4'-9 12 " 4'-9 12 " 19'-2" 1 2 3 5 6 4 A C B 2X12 SPF No. 2 @ 16" O/C C/W SOLID BLOCKING STAIRWAY OPENING OPEN BELOW B4 19 5'-2" 6' X 6' TIMBER BEARING WALL 20'-0" 16'-0" 4 8X8 TIMBER POST P1: 5-2X12 SPF No.2 BUILT UP GIRDER B1: 4-2X12 SPF No.2 BUILT UP GIRDER B2: 4-2X12 SPF No.2 END BEAM B3: 19. PROVIDE 2- 2X10 SPF No.2 TRIMMER JOISTS & 2-2X12 SPF No. 2 HEADER AT STAIR OPENING. 4. INSULATED CHIMNEY THROUGH ROOF -SIZE TO MATCH STOVE 1 S1.2 SECOND FLOOR FRAMING PLAN 1/4"= 1'-0" 1 MHC-1620-26 15/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC 1/4"-1"-0" S1.2 MHC-1620-26 SECOND FLOOR 5'-2" FRAMING PLAN WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION A C B 1 2 3 5 6 4 1 2 3 5 6 4 A C B 2X10 SPF No. 2 RAFTERS @ 16" O/C 4 18'-0" 1'-0" 16'-0" 1'-0" 1'-3 3 4 " 7'-8 1 4 " 7'-8 1 4 " 1'-3 3 4 " 22'-0" 1'-3 3 4 " 4'-10 3 4 " 3'-3 12 " 1'-6" 4'-9 12 " 4'-9 12 " 1'-5" 1'-0" 20'-0" 1'-0" 6' X 6' TIMBER BEARING WALL BELOW 1 S1.3 ROOF FRAMING PLAN 1/4"= 1'-0" 1 MHC-1620-26 19/SEP/26 NORTH DRAWING TITLE DRAWN BY PROJECT No. ISSUE STATUS SCALE SHEET PROJECT Fluid_Specific6913 CAD8409-260 MATTAWA WORKING DRAWING SET NO REVISION DATE HUNT CAMP CONCEPT IDEA NOT FOR CONSTRUCTION DRAWING NOTES STRUCTURE WALL ASSEMBLY DRAWING NOTES 16' X 2O' HUNT CAMP MATTAWA AREA ZEC MAGANASIPI, QC 1/4"-1"-0" S1.3 MHC-1620-26 ROOF FRAMING PLAN WORKING DRAWING CONCEPT NOT FOR CONSTRUCTION