I N D E P E N D E N T I N V E S T O R D U E D I L I G E N C E Empire Metals Limited ASX Prospectus Review A forensic assessment of the ASX listing, capital structure, funding, Pitfield resource, metallurgy, Century Minerals joint venture and principal shareholder risks. Prepared for discussion with existing shareholders Based on the 450-page prospectus dated 25 November 2026 Independent analytical report • Not investment advice Empire Metals ASX Prospectus Review | 1 I M P O R TA N T N O T I C E Scope and methodology This report is an independent analytical interpretation of Empire Metals Limited's 450-page ASX prospectus. It is designed to highlight the matters most relevant to a significant existing shareholder, rather than reproduce management's investment narrative. Evidence standard. Statements are separated into prospectus facts, independent technical conclusions and analyst interpretations. Page references use the PDF page first and the printed prospectus page where different. The review covered the principal offer sections, capitalisation, use of funds, historical and pro forma financial information, material contracts, the Independent Technical Assessment Report, the Solicitor's Report on Tenements, risk factors and corporate disclosures. Limitations This report is not a recommendation to buy, sell or hold securities. The prospectus does not contain a feasibility study, Ore Reserve, definitive project capex, operating cost estimate, NPV or IRR. Technical and economic conclusions remain subject to pilot work, studies, approvals, customer qualification and financing. Short quotations are included only where they materially affect interpretation. Central conclusion The prospectus moderately strengthens the investment case through financial runway, resource confidence and Australian market access. It does not yet demonstrate that the Pitfield processing route is commercially viable at scale. Contents Executive findings ASX and AIM mechanics Dilution and capital structure Offer and oversubscription Funding and cash runway Pitfield resource Metallurgy and processing Century Minerals JV Legal and tenure risks Institutional assessment Risk stress test Questions for the board Final assessment • • • • 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Empire Metals ASX Prospectus Review | 2 A Executive summary: 20 findings Single economic company. The ASX admission is a dual listing of the existing BVI-incorporated company; each CDI represents one ordinary share. Exact ordinary capital. Shares increase from 757,559,888 to 771,845,603. Headline dilution is 1.8509%. There is no separate dilution caused merely by admission to ASX. Existing options total 74.2m. The prospectus fully diluted figure is 846,045,603. Potential Century shares are excluded. Up to 25,381,368 additional shares may be issued under performance- based payments. A$8m is both minimum and full subscription. The company will not accept offer oversubscriptions. The offer is not underwritten. A shortfall is not guaranteed by Canaccord. Offer costs are high relative to the raise. Estimated at A$1.403m, leaving about A$6.60m incremental net capital under the stated assumptions. Empire is not cash-starved. The 12-month plan assumes A$17.75m existing cash and A$25.75m total available funds. Corporate and administration absorbs A$9.546m. This is 37.1% of available funds and merits detailed explanation. Only A$12.872m is budgeted directly to Pitfield during the 12 months after admission. Empire owns 70% of Pitfield. Century Minerals owns 30%. Century is free-carried. Empire funds current JV expenditure until the later of a unanimous Decision to Mine and grant of the relevant mining lease. The resource is exceptionally large. 8.16Bt @ 4.3% TiO ₂ , containing around 349Mt TiO ₂ Resource confidence has improved. 374Mt is Measured and 3.585Bt Indicated. There is no Ore Reserve or feasibility study. Resource tonnes are not equivalent to economic reserves. Weathered mineralisation is the current process focus because of higher grade, friability and favourable beneficiation characteristics. Bench work has produced >99% TiO ₂ and weathered-material titanium recoveries above 60%. The flowsheet is not commercially proven. Recovery, reagent use, costs and final specification still require validation. Most important catalyst. Pilot validation plus credible economic study matters more than ASX oversubscription. Primary references: Prospectus PDF pp10–12, 25–26, 32, 39, 48–50, 116–118, 142 and Independent Technical Assessment Report, including PDF p350. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Empire Metals ASX Prospectus Review | 3 B ASX, AIM and CDI trading mechanics 1:1 CDI TO ORDINARY SHARE One UNDERLYING EQUITY POOL CHESS ASX SETTLEMENT What an investor actually owns ASX investors trade CDIs. Each CDI represents beneficial ownership of one Empire ordinary share held through the Australian depositary structure. AIM investors continue to trade ordinary shares. Economic exposure is therefore to the same issuer, not two separately capitalised businesses. Voting CDI holders can instruct the depositary how to vote, request proxy appointment or convert CDIs into ordinary shares before the applicable record date. The prospectus states that CDI holders are entitled to attend and speak at shareholder meetings. Practical arbitrage example AIM price: 31p • GBP/AUD: 1.95 • ASX equivalent: approximately A$0.6045 per CDI before costs. A material ASX premium could attract conversion and arbitrage, but exact price equality is not assured because of foreign exchange spreads, brokerage, processing time, settlement, market hours and differing liquidity. INTERPRETATION ASX can develop a temporary local premium or discount. Fungibility encourages convergence but does not eliminate basis risk. For UK or Irish holders An existing holder can continue trading on AIM. Moving exposure to ASX requires a broker/custodian capable of handling the conversion and Australian settlement. The prospectus establishes a conversion mechanism, but investor-specific broker fees and operational times are not standardised in the document and must be obtained from the relevant intermediary. References: Prospectus §§6, 11.5–11.6 and Annexure A; PDF pp54–58 and related CDI provisions. Empire Metals ASX Prospectus Review | 4 C Dilution and capital structure Security Pre-offer Admission Ordinary shares / CDIs 757,559,888 771,845,603 Options 74,200,000 74,200,000 Prospectus fully diluted 831,759,888 846,045,603 Potential Century shares* Up to 25,381,368 Up to 25,381,368 Expanded potential maximum* 857,141,256 871,426,971 *Illustrative inclusion of the maximum potential Century performance-payment shares. These are omitted from the prospectus's stated fully diluted total because they are conditional. “The 14,285,715 CDIs to be issued under the Offer will represent approximately 1.85% of the total Shares/CDIs on issue immediately upon Admission.” Worked dilution A holder with 1.00% before the offer would hold approximately 0.9815% after the offer, assuming no additional purchase and no option exercise. OVERHANG The potential Century shares, if fully triggered, are more significant than the ASX offer itself. The precise milestones and likelihood of settlement should be monitored. References: Prospectus §4.11, PDF p49 / printed p48; summary PDF p25; option terms §11.8; Century consideration disclosures in material contracts. Empire Metals ASX Prospectus Review | 5 D – E Capital raising, allocation and timetable A$0.56 OFFER PRICE PER CDI 14,285,715 NEW CDIS A$8.0m GROSS RAISE Not underwritten OFFER STATUS Oversubscription scenarios Demand scenario Applications Maximum accepted Contractual effect Undersubscribed 0.5× A$4m Not successful as structured Minimum subscription not met Fully subscribed A$8m A$8m Minimum/full subscription met 2× A$16m A$8m Allocation / scale-back required 5× A$40m A$8m Allocation / scale-back required 10× A$80m A$8m Allocation / scale-back required FACT The company states that no oversubscriptions above A$8m will be accepted. Heavy demand may affect aftermarket behaviour but does not increase offer proceeds. Indicative timetable Event Date Prospectus lodged / ASIC exposure starts 25 November 2026 Offer opens 3 December 2026 Offer closes 16 December 2026, 5pm AWST Expected CDI issue / holding statements 18 December 2026 Expected ASX trading 23 December 2026 Dates are indicative. The board and lead manager may vary dates, close early, extend, accept late applications or withdraw before issuance, subject to law and ASX requirements. References: Prospectus PDF pp11, 25–26 and §§6.1–6.6. Empire Metals ASX Prospectus Review | 6 F Financial position and use of funds A$17.75m PLANNED EXISTING CASH A$8.00m GROSS ASX PROCEEDS A$25.75m TOTAL 12-MONTH POOL The A$17.75m planning figure is derived from approximately £10.69m cash at 1 October 2026, rounded and adjusted for forecast year-end expenditure plus expected interest and grants. 12-month allocation Use A$m Share Pitfield Project 12.872 50.0% Walton Project 0.090 0.3% Corporate and administration 9.546 37.1% Offer costs 1.403 5.4% Working capital 1.838 7.1% Pitfield 50.0% Corporate and administration 37.1% AMBER FLAG A$9.546m of corporate and administration spend deserves a line-by-line explanation. It includes management, directors, professional fees, insurance, travel and dual-market compliance, but remains large beside direct Pitfield work. Offer costs Estimated offer costs are A$1.403m. Net incremental proceeds are therefore approximately A$6.60m under the stated fee assumption. Canaccord's remuneration ranges from A$160k to A$480k, depending on company-introduced proceeds. No options are issued to the lead manager. FUNDING REALITY The company states that additional capital will be required for work beyond the first-year programme, including PFS, subsequent feasibility work and any development. A$8m is not construction finance. References: Prospectus §4.10, PDF pp48–49 / printed pp47–48; pro forma information PDF pp105–110; costs §11.20, PDF p142. Empire Metals ASX Prospectus Review | 7 G Pitfield resource and geology 8.16Bt TOTAL RESOURCE 4.3% AVERAGE TIO ₂ GRADE 349Mt CONTAINED TIO ₂ Resource classification Category Tonnes Grade Measured 374Mt 5.8% TiO ₂ Indicated 3.585Bt 4.3% TiO ₂ Inferred ~4.2Bt 4.1% TiO ₂ STRENGTH Approximately 3.96Bt is Measured plus Indicated. This materially strengthens geological confidence compared with an early exploration-stage proposition. Economic constraint The resource is reported over a 2.5% TiO ₂ cut-off and within optimised open-pit shells. The independent report refers to an indicative marginal cut-off of about 2.36% using preliminary recovery, product price, transport and royalty assumptions. CAUTION Reasonable prospects for eventual economic extraction support resource reporting. They are not equivalent to feasibility-level proof of economic extraction. Weathered versus primary mineralisation Process development has shifted toward weathered anatase/rutile mineralisation because it is described as higher grade, friable and more amenable to beneficiation. This supports a possible starter-operation thesis, but a defined mine schedule and reserve are still absent. “Empire has not declared an Ore Reserve, completed a feasibility study or made a decision to develop a mine.” References: Prospectus PDF pp9–10, 32, 35–41; Independent Technical Assessment Report and JORC tables, including PDF pp320–350. Empire Metals ASX Prospectus Review | 8 H Metallurgy and commercial viability What has been demonstrated >99% TiO ₂ product Bench-scale result >60% titanium recovery Weathered mineralisation testwork Preliminary integrated flowsheet: ore preparation, flotation, acid leaching, titanium recovery and calcination. Principal weathered titanium minerals are anatase and rutile. Potential pathways have been identified for coated rutile pigment, titanium-metal feedstock and high-purity alumina by-product. Reported sulphur and arsenic levels are low; iron, aluminium and vanadium are said to be removable in hydrometallurgical leaching. What has not been demonstrated No commercial-scale proof The prospectus does not establish a bankable recovery, reagent balance, energy intensity, water balance, production rate, final qualification specification, operating cost or capex. The independent assessment says current assumptions “do not demonstrate the economic viability of the proposed processing route.” Key unresolved engineering questions Issue Why it matters Recovery A >60% experimental result leaves a large gap between contained and recoverable titanium. Mass yield Determines material handling, product tonnes and residue volume. Acid/reagent use Can dominate operating costs and materially affect environmental approvals. Energy and water Critical for a large-throughput, low-grade bulk operation. Variability Performance must hold across representative ore domains and mine sequencing. Qualification High purity alone does not establish saleability into pigment or metal supply chains. Scale-up Individual staged pilots are not the same as a fully integrated continuous commercial circuit. References: Prospectus §4.2.8, PDF pp39–41; project programme PDF pp46–48; Independent Technical Assessment Report, including PDF pp204– 208, 225–229 and 350. • • • • Empire Metals ASX Prospectus Review | 9 I Century Minerals joint venture 70% EMPIRE ECONOMIC INTEREST 30% CENTURY ECONOMIC INTEREST “Century's 30% interest is free carried until the later of a unanimous decision to mine and the grant of a mining lease over the area the subject of that decision.” Commercial implications Empire funds 100% of current JV expenditure while owning 70% of the project. The free carry may persist through substantial study expenditure , depending on the Decision to Mine and mining-lease pathway. Empire controls ordinary management-committee decisions because voting is proportional and ordinary approval is 50.1%. Some matters require unanimity , so Century retains influence over specified major decisions. The Decision to Mine mechanism matters to financing. A proposal must include a feasibility study, and participating parties enter a mining JV over the proposed area. SHAREHOLDER CONCERN Valuation should be based on Empire's 70% interest and should incorporate the cost of carrying Century through the applicable trigger point. Potential Century equity consideration The headline fully diluted share count excludes up to 25.381m conditional shares potentially issuable in respect of performance-based payments. A takeover or change of control may accelerate cash settlement of unsatisfied payments that have not lapsed, calculated by reference to the share price mechanism described in the prospectus. References: Prospectus §10.1 and related sale-and-purchase provisions, PDF pp116–118 / printed pp115–117; capitalisation §4.11. 1. 2. 3. 4. 5. Empire Metals ASX Prospectus Review | 10 J Legal, tenure and environmental risks These are project-specific constraints, not only generic mining boilerplate. Heritage overlap The Solicitor's Report identifies registered heritage places overlapping portions of Pitfield tenements, including: Registered place E70/5876 E70/6323 Yarra Yarra Lakes 36.36% 64.36% Bimara 18.93% 10.73% These percentages do not establish that the resource or proposed development footprint is sterilised. They do mean access, surveys, consultation, site avoidance and approvals can affect timing and layout. Conservation reserves Parts of relevant exploration licences overlap Class A and Class C conservation reserves. Ministerial consent or concurrence may be required to explore or mine; a mining lease over a Class A reserve can require the consent of both Houses of the Western Australian Parliament. Waste and residues The proposed concept includes filtered tailings and progressive backfilling, but the independent report says the approach remains conceptual and requires environmental, geotechnical, hydrogeological and engineering assessment. MATERIAL PATHWAY RISK There is no completed environmental impact assessment or detailed mine/process residue storage design. These issues can affect capex, permitting and development footprint. References: Prospectus risk factors and Solicitor's Report on Tenements, including PDF pp17–20, 74–78 and 370–436; ITAR JORC discussion, including PDF p350. Empire Metals ASX Prospectus Review | 11 K Institutional investor assessment Why an Australian resource fund may engage Exceptional JORC resource scale. Large Measured and Indicated inventory. Western Australian location and local ASX access. Existing cash runway to generate more decision-useful evidence. Weathered anatase/rutile process focus. Potential exposure to pigment and titanium-metal markets. Strategic critical-minerals relevance. Why an institution may wait No Ore Reserve or feasibility study. No integrated commercial-scale flowsheet demonstration. No dependable capex, opex, NPV or IRR. No disclosed commercial product qualification. Century free carry and 70% project ownership. Large future construction-funding requirement. Permitting, heritage and residue-management work remains. Institutional interpretation Empire can currently be underwritten as a high-optionality development-stage resource company. It cannot yet be underwritten as a finance-ready titanium project. What changes the category Pilot validation → representative recoveries and consumption → customer specification → credible scoping/PFS economics → funding pathway. Progress through that sequence could bring Australian specialist funds, strategic investors and government-backed critical-minerals finance into the discussion. Failure at recovery, reagent intensity, product qualification or capex would undermine the thesis despite the resource size. • • • • • • • • • • • • • • Empire Metals ASX Prospectus Review | 12 L Investment thesis stress test Scenario Evidence required Likely effect Commercial success Stable pilot recovery, manageable reagent/energy intensity, qualified product, competitive capex/opex Potential major rerating and strategic financing interest Technically viable, economically weak Process works, but throughput/capex/reagents make costs uncompetitive Large resource retains optionality but development value falls Scale-up failure Recovery/purity deteriorates or integrated circuit is unreliable Core processing thesis impaired Strategic support Binding grant, strategic equity, offtake or project-finance commitment Reduced funding and dilution risk Funding squeeze Studies consume cash before bankable economics or partner support Repeated ordinary-equity dilution Five principal value creators Representative semi-continuous pilot success. Competitive scoping/PFS economics. Customer-qualified pigment or metal-feed product. Strategic, government or offtake-backed financing. Australian institutional liquidity and price discovery. Five principal value destroyers Processing route fails economically at scale. Capital intensity is excessive for product margins. Reagent, energy or water intensity undermines costs or approvals. Product fails qualification or attracts a material discount. Large equity raises precede economic proof. 1. 2. 3. 4. 5. 1. 2. 3. 4. 5. Empire Metals ASX Prospectus Review | 13 M 20 questions for Shaun Bunn and the board 1. What commercial recovery target should shareholders compare with the current >60% result? 2. What is current acid consumption per tonne of feed? 3. What percentage of acid is expected to be recycled? 4. What is the current ROM-to-saleable-product mass yield? 5. Which flowsheet stages have run continuously, and for how long? 6. What is the largest representative sample tested through an integrated sequence? 7. What is the single biggest unresolved metallurgy issue? 8. What throughput range is being assessed? 9. What capex range is being tested in the scoping work? 10. What operating cost would make Pitfield globally competitive? 11. Why is A$9.546m required for corporate and administration in 12 months? 12. How much cumulative expenditure is Empire expected to fund before Century's free carry ends? 13. Can Century delay a Decision to Mine or project financing? 14. Exactly when does Century begin contributing its 30% share? 15. What milestones trigger the potential 25.381m Century shares? 16. Has a prospective customer formally tested representative material? 17. What written product specifications have potential customers provided? 18. What funding is expected from scoping through PFS and DFS? 19. At what stage should strategic/project finance replace ordinary equity? 20. What pilot result would cause management to reject the current flowsheet? Empire Metals ASX Prospectus Review | 14 F I N A L A S S E S S M E N T What a significant existing shareholder needs to know Verdict: moderately stronger thesis, but not fundamental de-risking. The prospectus improves confidence in near-term funding, geological scale and resource classification. It does not establish commercial economics. Why the thesis is stronger £10.69m cash was reported at 1 October 2026 before the offer. The first-year programme has A$25.75m of planned funding. Nearly 4Bt is Measured plus Indicated. Weathered material has produced >60% recovery and >99% TiO ₂ at bench scale. ASX is a logical market for a large Western Australian development project. Why caution is still essential Empire bears current project expenditure for a 70% interest while Century is free-carried. The prospectus's fully diluted figure excludes potential Century consideration shares. Corporate expenditure is substantial. No definitive recovery, reagent consumption, capex, opex, product price or qualification data supports a DCF. Permitting, heritage, waste, water and residue engineering remain development-stage. The investment question is no longer whether Pitfield is enormous. It is whether Empire can into specification-qualified titanium products at a competitive whole-of-project cost. Most important future evidence Recovery ACROSS REPRESENTATIVE ORE Intensity REAGENT, ENERGY, WATER Economics CAPEX, OPEX, PRICE If pilot results and the first serious economic study validate those variables, the scale of Pitfield can become genuinely valuable. If they do not, further resource expansion will not repair the commercial case. Source: Empire Metals Limited, Prospectus dated 25 November 2026, including Independent Technical Assessment Report, Investigating Accountant's Report and Solicitor's Report on Tenements. Analysis prepared independently from the prospectus. Not financial advice. • • • • • • • • • • Empire Metals ASX Prospectus Review | 15 convert a high-grade, bulk resource