If any of the indicators above show up, the next move is straightforward: take the crane out of service for that rope, document the condition, and plan the replacement. Don't try to "get one more lift" out of a damaged rope. The cost of a broken rope mid-lift—in dropped loads, damaged equipment, injured people—dwarfs the cost of replacement.