N.T.S PROJECT No. SCALE REV. DATE DESCRIPTION BY CHK SD REV. APPD 11594 DRAWING TITLE: PROJECT TITLE: DRAWING No. : CONSULTANT/CONTRACTOR/VENDOR: P.O. Box. 113917 Abu Dhabi, U.A.E SHT. SIZE : A1 THE INFORMATION/DESIGN CONTAINED ON THIS DRAWING IS CONFIDENTIAL. IT MUST NOT BE COPIED, GIVEN AWAY, LENT OR MADE AVAILABLE TO A THIRD PARTY WITHOUT THE WRITTEN CONSENT OF ADNOC Offshore. ALL THE WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE CONTRACT SPECIFICATION. EXPLANATIONS OF ABBREVIATIONS, SYMBOLS ETC. ARE GIVEN IN ADNOC Offshore CODES OF PRACTICE. AS BUILT RECOVERY PHASE II (PACKAGE 6: ABK) DRAWING No. BUDGET REF. 11594 APPD NOTES IV 26 Dec 2025 SB MN AD PK ISSUED FOR REVIEW 1A 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 NEW KPP (NKPP) DRAWING INDEX PIPING AND INSTRUMENTATION DIAGRAM FILE NAME: AD-18-D-100001-SHT-001.pid AD-18-D-100001-SHT-001 AD-18-D-100001-SHT-002 AD-18-D-100001-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - DRAWING INDEX - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FIRE WATER PUMP - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - DRAWING INDEX - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100001-SHT-003 AD-18-D-100001-SHT-004 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - DRAWING INDEX - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - DRAWING INDEX - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100002-SHT-001 AD-18-D-100003-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FIRE WATER DISTRIBUTION - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100004-SHT-004 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CELLAR DECK EAST DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100003-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - AUTOMATIC VALVE MANIFOLD (G-1850.A) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MANUAL VALVE MANIFOLD (G-1850.C) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100003-SHT-003 AD-18-D-100003-SHT-004 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - AUTOMATIC VALVE MANIFOLD (G-1850.B) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100003-SHT-005 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MANUAL VALVE MANIFOLD (G-1850.D) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100003-SHT-006 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FIRE WATER DELUGE SYSTEMS - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FIRE PUMP SPRINKLER SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100004-SHT-001 AD-18-D-100004-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SUB-CELLAR DECK DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100004-SHT-003 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CELLAR DECK WEST DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100004-SHT-005 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CELLAR DECK DEDICATED DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100004-SHT-006 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MEZZANINE DECK WEST DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100004-SHT-007 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MEZZANINE DECK EAST DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100004-SHT-008 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MEZZANINE DECK DEDICATED DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100004-SHT-009 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GLYCOL COLUMNS DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100005-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - UPPER DECK NORTH DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100005-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - UPPER DECK SOUTH DELUGE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100006-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FIRE WATER PUMP DIESEL DRIVEN PART OF G-1806 - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100007-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SPRINKLER VALVE ARRAGNEMENT G-1853 - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100008-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GH06A/11 MOTOR DRIVEN JOCKEY PUMPS - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100009-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FUEL GAS SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100009-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FUEL GAS DISTRIBUTION - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100010-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PIG RECEIVER AKK 2 - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100011-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PIG RECEIVER AKK 3 - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100012-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PIG RECEIVER AKK 4 - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100013-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PIG RECEIVER AKK 5 - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100014-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PRODUCTION MANIFOLD - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100015-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - WELLSTREAM SEPARATOR - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100016-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GLYCOL CONTACTOR TRAIN A - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100017-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PRODUCT GAS SCRUBBER - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100017-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GLYCOL CONTACTOR TRAIN A - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100018-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GLYCOL CONTACTOR TRAIN B - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100019-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GLYCOL CONTACTOR TRAIN B - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100019-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GAS EXPORT LAUNCHER - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100020-SHT-001 13 12 11 2 10 1A 9 8 1A REVISION 7 DESCRIPTIONS DRAWING NUMBER 1A SL.NO. 1A 1A 6 1A 5 1A 4 1A 3 1A 1A 1A 1A 1A 1 14 1A 18 17 16 15 19 23 22 21 20 24 28 27 26 25 29 33 32 31 30 34 38 37 36 35 39 40 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A THIS DRAWING SUPERSEDES TOTAL ABK DWG. NO. N-A18-PR-PID-00-000-14 REV-23 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FUEL GAS SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM 56 51 1A 52 41 58 42 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - INERT GAS (NITROGEN) GENERATOR PACKAGE (G-1805) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100041-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - INERT GAS (NITROGEN) GENERATOR PACKAGE (G-1805) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100040-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - INERT GAS - PIPING AND INSTRUMENTATION DIAGRAM 1A 59 1A 49 AD-18-D-100039-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - DTX-42 DRYER (1804) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100056-SHT-001 AD-18-D-100038-SHT-001 AD-18-D-100025-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CLOSED DRAIN SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - ZT160-10-50- AIR COMPRESSOR (G-1804) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FLARE GAS RECOVERY COMP. (MONITORING DIAGRAM) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100055-SHT-001 48 63 DESCRIPTIONS AD-18-D-100037-SHT-001 AD-18-D-100031-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CORROSION INHIBITOR INJECTION PACKAGE - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100054-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FRESH WATER SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100053-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SEAWATER ELECTROCHLORINATION - PIPING AND INSTRUMENTATION DIAGRAM 62 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FRC 1ST STAGE - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SEAWATER DISTRIBUTION - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100024-SHT-001 AD-18-D-100052-SHT-001 AD-18-D-100023-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SEAWATER COARSE FILTRATION - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - INSTRUMENT AIR PRODUCTION - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSATE COOLING - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100050-SHT-001 AD-18-D-100036-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSATE EXPORT PUMP - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SEAWATER LIFT PUMPS - PIPING AND INSTRUMENTATION DIAGRAM 1A 55 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PLANT AIR DISTRIBUTION - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100022-SHT-001 AD-18-D-100035-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - INSTRUMENT AIR DISTRIBUTION - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100021-SHT-003 AD-18-D-100034-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FLARE GAS RECOVERY COMP. (WATER WASH SYSTEM) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSATE DEWATERING - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100033-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FRC 1ST STAGE SUCTION DRUM - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FLARE GAS RECOVERY COMP. (SEAL GAS SYSTEM) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSATE DEWATERING - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100032-SHT-001 AD-18-D-100021-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FLARE GAS RECOVERY COMPRESSOR (LUBE OIL SYSTEM) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100048-SHT-001 AD-18-D-100021-SHT-002 AD-18-D-100030-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - LP FLARE DISTRIBUTION - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SLUG CATCHER/WELLSTREAM COOLER TRAIN B - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100047-SHT-001 AD-18-D-100029-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - LP FLARE DISTRIBUTION - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100029-SHT-001 AD-18-D-100046-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SLUG CATCHER/WELLSTREAM COOLER TRAIN B - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - HP FLARE KO DRUM - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SLUG CATCHER/WELLSTREAM COOLER TRAIN A - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100045-SHT-002 AD-18-D-100028-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - HP FLARE COLLECTION - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - SLUG CATCHER/WELLSTREAM COOLER TRAIN A - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100045-SHT-001 AD-18-D-100028-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - INERGEN DISTRIBUTION - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FRC DISCHARGE DRUM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100044-SHT-001 AD-18-D-100027-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - ZT110-10-50 AIR COMPRESSOR 1 (R-1805.1) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - ZT110-10-50 AIR COMPRESSOR 2 (R-1805.2) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - INERT GAS (NITROGEN) GENERATOR PACKAGE (G-1805) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FRC 2ND STAGE SUCTION DRUM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100042-SHT-001 AD-18-D-100043-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FRC 2ND STAGE - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100026-SHT-001 50 54 57 1A REVISION 53 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 43 79 1A 1A 75 1A 44 76 1A 77 1A 1A 78 1A 1A 1A 1A 1A 80 74 45 SL.NO. 70 DRAWING NUMBER 71 72 1A 73 46 69 65 1A 1A 66 1A 1A 67 1A 1A 68 1A 64 1A 47 60 1A 61 THIS DRAWING SUPERSEDES TOTAL ABK DWG. NO. N-A18-PR-PID-00-000-24 REV-10 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 NEW KPP (NKPP) DRAWING INDEX PIPING AND INSTRUMENTATION DIAGRAM FILE NAME: AD-18-D-100001-SHT-002.pid AD-18-D-100001-SHT-002 IV 26 Dec 2025 SB MN AD PK ISSUED FOR REVIEW 1A N.T.S PROJECT No. SCALE REV. DATE DESCRIPTION BY CHK SD REV. APPD 11594 DRAWING TITLE: PROJECT TITLE: DRAWING No. : CONSULTANT/CONTRACTOR/VENDOR: P.O. Box. 113917 Abu Dhabi, U.A.E SHT. SIZE : A1 THE INFORMATION/DESIGN CONTAINED ON THIS DRAWING IS CONFIDENTIAL. IT MUST NOT BE COPIED, GIVEN AWAY, LENT OR MADE AVAILABLE TO A THIRD PARTY WITHOUT THE WRITTEN CONSENT OF ADNOC Offshore. ALL THE WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE CONTRACT SPECIFICATION. EXPLANATIONS OF ABBREVIATIONS, SYMBOLS ETC. ARE GIVEN IN ADNOC Offshore CODES OF PRACTICE. AS BUILT RECOVERY PHASE II (PACKAGE 6: ABK) DRAWING No. BUDGET REF. 11594 APPD NOTES AD-18-D-100051-SHT-001 96 91 1A 92 81 98 82 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MAIN AIR HANDLING UNIT (G-1840) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100080-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSING UNITS (G-1843.B) - HVAC - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100079-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSING UNITS (G-1843.A) - HVAC - PIPING AND INSTRUMENTATION DIAGRAM 1A 99 1A 89 AD-18-D-100078-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSING UNITS (G-1842.B2) - HVAC - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100095-SHT-001 AD-18-D-100077-SHT-001 AD-18-D-100063-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) TURBINE GAS PATH (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSING UNITS (G-1842.B1) - HVAC - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN B TEG REGENERATION PACKAGE (G-1810.B) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100094-SHT-001 88 103 DESCRIPTIONS AD-18-D-100076-SHT-001 AD-18-D-100070-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE HYDRAULIC START SYSTEM (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100093-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) DLE GAS FUEL MANIFOLD (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100092-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE TURBINE BEARING & ROTOR SPEED (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM 102 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - NON-HAZARDOUS AREA OPEN DRAINS - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) PACKAGE (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100062-SHT-001 AD-18-D-100091-SHT-001 AD-18-D-100061-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE CLEAN, INTER BV, SEAL AIR & BR (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSING UNITS (G-1842.A2) - HVAC - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - HAZARDOUS AREA OPEN DRAINS - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100089-SHT-001 AD-18-D-100075-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - HAZARDOUS AREA OPEN DRAINS - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE VGSB, P2 BLEED & DLE VALVE SYSTEM (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM 1A 95 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CONDENSING UNITS (G-1842.A1) - HVAC - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100060-SHT-001 AD-18-D-100074-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN B TEG REGENERATION PACKAGE (G-1810.B) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100059-SHT-001 AD-18-D-100073-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN B TEG REGENERATION PACKAGE (G-1810.B) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - OPEN DRAIN SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100072-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - HAZARDOUS AREA OPEN DRAINS - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN B TEG REGENERATION PACKAGE (G-1810.B) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CLOSED DRAIN SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100071-SHT-001 AD-18-D-100057-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN A TEG REGENERATION PACKAGE (G-1810.A) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100088-SHT-001 AD-18-D-100058-SHT-001 AD-18-D-100069-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) DLE GAS FUEL SYSTEM (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN A TEG REGENERATION PACKAGE (G-1810.A) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100087-SHT-001 AD-18-D-100068-SHT-002 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) LUBE OIL SYSTEM (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100068-SHT-001 AD-18-D-100086-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN A TEG REGENERATION PACKAGE (G-1810.A) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - EMERGENCY GENERATOR - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN A TEG REGENERATION PACKAGE (G-1810.A) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100085-SHT-001 AD-18-D-100067-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MAIN GENERATOR 2 - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - TRAIN A TEG REGENERATION PACKAGE (G-1810.A) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100084-SHT-001 AD-18-D-100066-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MAIN GENERATOR 1 - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GLYCOL REGENERATION PACKAGE TRAIN B - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100083-SHT-001 AD-18-D-100065-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - MAIN AIR HANDLING UNIT (G-1839) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PLANT ROOM ROOF - HVAC - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - ITR AIR HANDLING UNIT (G-1841) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - PRODUCED WATER COLLECTION - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100081-SHT-001 AD-18-D-100082-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - GLYCOL REGENERATION PACKAGE TRAIN A - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100064-SHT-001 90 94 97 1A REVISION 93 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A 83 119 1A 1A 115 1A 84 116 1A 117 1A 1A 118 1A 1A 1A 1A 1A 120 114 85 SL.NO. 110 DRAWING NUMBER 111 112 1A 113 86 109 105 1A 1A 106 1A 1A 107 108 1A 104 1A 87 100 1A 101 THIS DRAWING SUPERSEDES TOTAL ABK DWG. NO. N-A18-PR-PID-00-000-34 REV-13 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 NEW KPP (NKPP) DRAWING INDEX PIPING AND INSTRUMENTATION DIAGRAM FILE NAME: AD-18-D-100001-SHT-003.pid AD-18-D-100001-SHT-003 IV 26 Dec 2025 SB MN AD PK ISSUED FOR REVIEW 1A N.T.S PROJECT No. SCALE REV. DATE DESCRIPTION BY CHK SD REV. APPD 11594 DRAWING TITLE: PROJECT TITLE: DRAWING No. : CONSULTANT/CONTRACTOR/VENDOR: P.O. Box. 113917 Abu Dhabi, U.A.E SHT. SIZE : A1 THE INFORMATION/DESIGN CONTAINED ON THIS DRAWING IS CONFIDENTIAL. IT MUST NOT BE COPIED, GIVEN AWAY, LENT OR MADE AVAILABLE TO A THIRD PARTY WITHOUT THE WRITTEN CONSENT OF ADNOC Offshore. ALL THE WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE CONTRACT SPECIFICATION. EXPLANATIONS OF ABBREVIATIONS, SYMBOLS ETC. ARE GIVEN IN ADNOC Offshore CODES OF PRACTICE. AS BUILT RECOVERY PHASE II (PACKAGE 6: ABK) DRAWING No. BUDGET REF. 11594 APPD NOTES AD-18-D-100090-SHT-001 125 SL.NO. DRAWING NUMBER 1A 126 1A 1A 1A 127 THIS DRAWING SUPERSEDES TOTAL ABK DWG. NO. N-A18-PR-PID-00-000-44 REV-14 136 131 132 121 138 122 1A 139 1A 129 AD-18-D-100102-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - EMERGENCY GEN. COOLING WATER SYSTEM (DE-1830) - PIPING AND INSTRUMENTATION DIAGRAM 128 DESCRIPTIONS AD-18-D-100110-SHT-001 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE TURBINE BEARING & ROTOR SPEED (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100101-SHT-001 AD-18-D-100100-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE VGSB, P2 BLEED & DLE VALVE SYSTEM (UNIT2) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) DLE GAS FUEL SYSTEM (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM 1A 135 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CASCADE SYSTEM - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100099-SHT-001 AD-18-D-100115-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FUEL GAS TO GENERATOR 2 - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100098-SHT-001 AD-18-D-100113-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FUEL GAS TO GENERATOR 1 - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) LUBE OIL SYSTEM (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100112-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE CLEAN, INTER BV, SEAL AIR & BR (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - EMERGENCY GENERATOR LUBE OIL SYSTEM (DE-1830) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE FIRE & GAS EXTINGUISHANT SYSTEM (UNIT 1) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100111-SHT-001 AD-18-D-100096-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - EMERGENCY GEN. SECONDARY & TERTIARY START - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100097-SHT-001 AD-18-D-100109-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - EMERGENCY GEN. AIR INTAKE & EXHAUST (DE-1830) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100108-SHT-001 AD-18-D-100107-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - FUEL INJECTION SYSTEM (DE-1830) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE FIRE & GAS EXTINGUISHANT SYSTEM (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100106-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) TURBINE GAS PATH (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100105-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) HYDRAULIC START SYSTEM (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100104-SHT-001 ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) PACKAGE (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 - NEW KPP (NKPP) - CYCLONE (TWIN SHAFT) DLE GAS FUEL MANIFOLD (UNIT 2) - PIPING AND INSTRUMENTATION DIAGRAM AD-18-D-100103-SHT-001 130 134 137 REVISION 133 1A 1A 1A 1A 1A 123 1A 1A 1A 124 1A 1A 1A 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 NEW KPP (NKPP) DRAWING INDEX PIPING AND INSTRUMENTATION DIAGRAM FILE NAME: AD-18-D-100001-SHT-004.pid AD-18-D-100001-SHT-004 IV 26 Dec 2025 SB MN AD PK ISSUED FOR REVIEW 1A N.T.S PROJECT No. SCALE REV. DATE DESCRIPTION BY CHK SD REV. APPD 11594 DRAWING TITLE: PROJECT TITLE: DRAWING No. : CONSULTANT/CONTRACTOR/VENDOR: P.O. Box. 113917 Abu Dhabi, U.A.E SHT. SIZE : A1 THE INFORMATION/DESIGN CONTAINED ON THIS DRAWING IS CONFIDENTIAL. IT MUST NOT BE COPIED, GIVEN AWAY, LENT OR MADE AVAILABLE TO A THIRD PARTY WITHOUT THE WRITTEN CONSENT OF ADNOC Offshore. ALL THE WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE CONTRACT SPECIFICATION. EXPLANATIONS OF ABBREVIATIONS, SYMBOLS ETC. ARE GIVEN IN ADNOC Offshore CODES OF PRACTICE. AS BUILT RECOVERY PHASE II (PACKAGE 6: ABK) DRAWING No. BUDGET REF. 11594 APPD NOTES 15 kW ESTIMATED POWER 7.00 barg 36 m³/hr DISCHARGE PRESSURE AT PUMP OUTLET FLANGE FIREWATER JOCKEY PUMP P-1810 EQUIPMENT No. DISCHARGE FLOW RATE NAME 697 kW ESTIMATED POWER 10.45 barg 1180 m³/hr DISCHARGE PRESSURE AT PUMP OUTLET FLANGE FIREWATER PUMP P-1806 EQUIPMENT No. TRIM SPEC. DISCHARGE FLOW RATE NAME M 180281 PDI 180132 LSL 180132 LAL 180301 PG 181010 HS A 181010 XL B 181010 XA 180105 ZLC 180105 ZSC 180105 ZLO 180105 ZSO 180108 FT 180108 FI 180108 FI 180254 PSLL B1 181006 XA B2 181006 XA A1 181006 XL A2 181006 XL 3 181006 HS 181006 2 HS 001006 HS 1 001006 HS 189915 ZSO 189915 ZSO 189915 ZSC 189915 ZSC 2F 180175 PG F&G F&G F&G F&G PG HYPOCHLORITE FROM ELECTRO CHLORINATION PACKAGE G-1812 110 AD-18-D-100052-SHT-001 DIESEL TO EMERGENCY GENERATOR PACKAGE G-1830 259 AD-18-D-100086-SHT-001 HYPOCHLORITE FROM ELECTRO CHLORINATION PACKAGE G-1812 111 AD-18-D-100052-SHT-001 DIESEL TO CORROSION INHIBITOR INJECTION PACKAGE G-1814 354 AD-18-D-100055-SHT-001 TO FIREWATER DISTRIBUTION NETWORK 115 AD-18-D-100003-SHT-001 DRAIN/OVERFLOW TO OPEN DRAIN HEADER 168 AD-18-D-100062-SHT-001 DRAIN TO OPEN DRAIN HEADER 118 AD-18-D-100062-SHT-001 DIESEL FROM KPP DIESEL DISTRIBUTION 3928 AD-09-D-100024-SHT-001 COMPRESSED AIR SUPPLY (TEMPORARY) TO AAD-5 INTENSIFIER 4293 AD-18-D-100006-SHT-001 NOTE 18 NOTE 12 NOTE 6 NOTE 8 NOTE 16 NOTE 20 AUTO START COMMAND INHIBIT TO START 1/2" NPT NOTES 20, 21 NOTES 3, 12 1. AUTOMATIC SURGE ANTICIPATOR "YARWAY" TYPE VALVE. AUTO-RECIRCULATION VALVE. 2. PROVISION FOR BATTERY START (PRIMARY MODE OF STARTING) SHALL ALSO BE PROVIDED. 3. VENDOR'S SCOPE OF SUPPLY SHALL INCLUDE ALL THE DETAILS AS PER PACKAGE SPECIFICATION AND DATA SHEETS. DOC. NO. A18-ME-SP-27-00001. 4. TRASH SCREEN PROVIDED AT PUMP SUCTION, SUCTION TO BE FROM SIDES OF CAISSON. 5. GAS DETECTION AT AIR INTAKE TO INHIBIT ENGINE START. 6. MANUAL JOCKEY PUMP START/STOP ON FAILURE OF PUMP. JOCKEY PUMP ON KPP WILL AUTO START. KPP PUMP CAN BE SELECTED AS DUTY PUMP WITH P-1810 STARTING ON FAILURE. 7. AUTOMATIC FIRE PUMP START CONTROLLED BY FIREWATER RING MAIN PSL TO FIREWATER PUMP CONTROL PANEL AND/OR CONFIRMED GAS FROM F&G SYSTEM. 8. NOZZLE FOR HYPOCHLORITE SHOCK DOSING. 9. LOCATE ESV CLOSE TO BRIDGE. 10. DIESEL ENGINE EXHAUSTS PROCESS AND UTILITY SYSTEMS SHALL NOT BE LOCATED LESS THAN 2 METERS FROM HAZARDOUS AREA BOUNDARY. 11. DIESEL SUPPLY CONNECTION TO BE LOCATED CLOSE TO LIFEBOAT. 12. FILTRATION SPECIFICATION 500 MICRONS. 13. DURING THE SITE WALKTHROUGH, FIREWATER PUMP P-1806, INCLUDING ITS INLET PIPING AND ASSOCIATED COMPONENTS UP TO AND INCLUDING XV-180105, THE OUTLET UP TO THE FLANGE FACE OF FV-180100, AND THE PSV LINE UP TO AND INCLUDING PSV-180175, WERE TEMPORARILY REMOVED FOR MAINTENANCE. 14. CONNECTION FOR FUTURE RISER PLATFORM. CONNECTION SHOULD BE AT SUITABLE LOCATION FOR TAKE-OFF TO THE FUTURE PLATFORM. 15. VALVE TO BE ACCESSIBLE FOR OPERATION. 16. METER TO HANDLE 150% DESIGN FLOW WITH 65% DESIGN PUMP HEAD. 17. FLOW OF 36M /HR CONSIST OF 30M /HR TO THE FIREWATER NETWORK AND 6M /HR TO THE MINIMUM FLOWLINE. 18. INCLUDES MOTOR HEADER TANK WITH LSL-180132. 19. FOR DETAILS OF PRESSURE SENSING ARRANGEMENT, REFER TO NFPA-20, SECTION 7.5.2. 20. A 2-4 MM HOLE SHALL BE DRILLED IN THE CHECK VALVE DISK TO SERVE AS DAMPENING. 21. FOR DETAILS ON FIREWATER START LOGIC REFER TO NKPP ACTIVE FIRE PROTECTION (N-A18-LC-PHL-00-003). 22. BLOCK VALVE TO BE LOCATED AS CLOSE AS POSSIBLE TO PSV OUTLET. 23. THERMAL RELIEF. NOTE 4 NOTE 8 CS GRE NOTE 1 NOTE 14 NOTE 9 NOTE 11 NOTE 15 SITE WALK THROUGH DONE ON 26 APR 2024 GRE CS NOTE 4, 13 MANUAL START NOTE 2,7 SEE VENDOR DWG. AD-18-D-100006-SHT-001 NOTE 3 THIS DRAWING SUPERSEDES TOTAL ABK DWG. NO. N-A18-LC-PID-27-001-11 REV-4 KPP KPP-NKPP BRIDGE (AREA 69) NKPP NOTE 23 NOTE 22 NOTE 10 KDF-1806 NOTE 13 AD-69-D-100001-SHT-001 KPP - NKPP BRIDGE DRAWING NOTE 13 1. MISSING INSTRUMENT TAGS ARE REQUESTED FROM COMPANY AND WILL BE PROVIDED IN THE NEXT REVISION. HOLDS: HOLD 1 PSET=12 barg OVERBOARD SLOPE 16" 16" 2" 2"x1" 2" FO LO 1" 1" 1" B94A 2" 3" 1" LO LO 2" 4"x3" FC 2" 2" LO 2"x3/4" 1" 1" 1" 1" LC 16"x10" 10"x8" 14"x12" 16"x14" 1" 2" 1" 3" OVERBOARD OVERBOARD 150# 150# 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 NEW KPP (NKPP) FIRE WATER PUMP PIPING AND INSTRUMENTATION DIAGRAM FILE NAME: AD-18-D-100002-SHT-001.pid AD-18-D-100002-SHT-001 3"-WF-18-27-0491-B94A-N 16"-WF-18-27-0492-B94A-N 3"-WF-18-27-0404-B94A-N 2"-DO-18-31-0082-B06S-N LOCATED ON PP 1" D03S OVERBOARD FE 180108 V-18524 V-18525 V-18532 V-18531 V-18530 V-18526 V-18527 HV-180175 HV-180108 V-18533 16" 16"-WF-18-27-0496-B94A-N 1"-AD-18-20-1052- -N 2"-WF-18-27-0405-B94A-N XV 180105 1" 16" PSV 180175 PSV 180116 FV 180100 G-1806 X-1810 P-1810 P-1806 X-1806 1 180104 RO ESV 189915 2"-FO-18-15-0001-B03-N DESCRIPTION DRAWING NUMBER REFERENCE DRAWINGS 150# LOCAL LOCATED ON PP RUNNING ESD FROM F&G PANEL FAULT RUNNING FAULT FAIL TO START UNIT AVAILABLE START/STOP START/STOP IV 26 Dec 2025 SB MN AD AA ISSUED FOR REVIEW 1A 3"-WF-18-27-0400-B94A-N 1"-AS-18-20-0025-B20-N 2"-DO-18-31-0083-B06S-N 2"-V-18-22-0554-B03-N 1"-FO-18-15-1002-B03-N 1-1/2"-V-18-22-0147-B06-N 12"-V-18-22-0093-B06-N 2"-WC-18-25-0501-B94A-N 2"-FO-69-15-0001-B03-N TSO FIREWATER PUMP CONTROL PANEL 2"-FO-18-15-0502-B03-N FB LO V-18964 2" KPP F & G SYSTEM 2" 2"-DH-18-31-0758-B03S-N LO FB SLOPE V-18965 2"-FO-18-15-0501-B03-N 2"-FO-18-15-0006-B03-N 2"-FO-18-15-0002-B03-N 16"-WF-18-27-0402-B94A-N 10"-WF-18-27-0401-B94A-N 8"-WF-18-27-0494-B94A-N 1"-X-18-25-0016-B80-N 1"-X-18-25-0017-B80-N 16"-WF-18-27-0403-B94A-N 2"-V-18-22-0553-B03-N 2"-X-18-25-0504-B80-N 2"-X-18-25-0503-B80-N EQUIPMENT No. NAME G-1806 FIREWATER PUMP PACKAGE V-18523 V-18528 EXHAUST TO SAFE LOCATION PSV 180186 F & G SYSTEM FB N.T.S PROJECT No. SCALE REV. DATE DESCRIPTION BY CHK SD REV. APPD 11594 DRAWING TITLE: PROJECT TITLE: DRAWING No. : CONSULTANT/CONTRACTOR/VENDOR: P.O. Box. 113917 Abu Dhabi, U.A.E SHT. SIZE : A1 THE INFORMATION/DESIGN CONTAINED ON THIS DRAWING IS CONFIDENTIAL. IT MUST NOT BE COPIED, GIVEN AWAY, LENT OR MADE AVAILABLE TO A THIRD PARTY WITHOUT THE WRITTEN CONSENT OF ADNOC Offshore. ALL THE WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE CONTRACT SPECIFICATION. EXPLANATIONS OF ABBREVIATIONS, SYMBOLS ETC. ARE GIVEN IN ADNOC Offshore CODES OF PRACTICE. AS BUILT RECOVERY PHASE II (PACKAGE 6: ABK) DRAWING No. BUDGET REF. 11594 APPD NOTES NOTE 13 16"-WF-18-27-1020-B94A-N PLANT AIR FROM AIR DISTRIBUTION 1777 AD-18-D-100035-SHT-001 INSTRUMENT AIR FROM CONTROL PANEL PURGE PRESSURE 5080 AD-18-D-100006-SHT-001 SP 21/7 SP 24/13 SP 42/2 SP 27/8 SP 27/8 SP 24/12 TO NKPP CONTIUOUS PROCESS DRAIN 1432 AD-18-D-100056-SHT-001 SEE DWG. AD-18-D-100006-SHT-001 Q-1803 G-1806 EQUIPMENT No. NAME Q-1803 DIESEL FUEL TANK NOTE 22 NOTE 17 EQUIPMENT No. FIREWATER JOCKEY PUMP CAISSON X-1810 508 mm OD x 23500 mm H DIM NAME EQUIPMENT No. FIREWATER PUMP CAISSON X-1806 950 mm OD x 25000 mm H DIM NAME barg AD-82-D-100001 TO AD-82-D-100005 P&ID LEGEND, SYMBOLS & INSTRUMENT DETAILS 2"x1" 2"x1" 12 188800 PG 180172 PT 180253 PT F&G 180253 PAL 180172 PIR 180253 PALL F&G FOAM NOTE 7 FOAM TO G-1850.A AUTOMATIC DELUGE SKID 123 AD-18-D-100003-SHT-002 TO G-1850.B AUTOMATIC DELUGE SKID 124 AD-18-D-100003-SHT-004 FROM NKPP FIRE PUMP 115 AD-18-D-100002-SHT-001 TO SPRINKLER PROTECTION FIREWATER PUMP AND DIESEL DAY TANK CELLAR 120 AD-18-D-100004-SHT-001 FROM POTABLE WATER ITEM DISTRIBUTION 158 AD-18-D-100054-SHT-001 TO G-1850.C MANUAL DELUGE SKID 130 AD-18-D-100003-SHT-003 TO G-1850.D MANUAL DELUGE SKID 128 AD-18-D-100003-SHT-005 OVERBOARD REDUCING/ISOLATING HYDRANT VALVE REDUCING (ISOLATING) HYDRANT VALVE NOTE 3 FOAM NOTE4 NOTE4 FOAM NOTE 7 NOTE 3 FOAM NOTE 7 NOTE 3 NOTE 3 NOTE 3 NOTE 7 NOTE 3 NOTE 4 FOAM NOTE 3 NOTE 7 NOTE 7 NOTE 4 NOTE 4 NOTE 4 NOTE 5,6 AD-18-D-100007-SHT-001 DECK IAS NOTE 8 TUBING B94A B94 NOTE 3 SITE WALKTHROUGH DONE ON 01 JUN 2024 150# 4"x3" 4"x3" 4"x3" LO LO LO LO 2" 2" 2" LO LO 4"x3" LO LO LO LO 16"x12" 1" INTEGRAL PRESSURE 3" INTEGRAL PRESSURE N3 N6 N1 N2 150# 150# 150# LO 1" LO LO 150# LO LO LO LO LO 12" LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO 1" 12" 4"x3" FLUSHING CONNECTION HYDRANT CELLAR DECK HYDRANT UPPER DECK FLUSHING SPEC FOAM HYDRANT CELLAR DECK HYDRANT SUB CELLAR DECK HYDRANT CELLAR DECK 1" HYDRANT SUB CELLAR DECK HYDRANT CELLAR DECK HYDRANT MEZZ DECK 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 NEW KPP (NKPP) FIRE WATER DISTRIBUTION PIPING AND INSTRUMENTATION DIAGRAM FILE NAME: AD-18-D-100003-SHT-001.pid AD-18-D-100003-SHT-001 HYDRANT UPPER DECK HYDRANT UPPER DECK FLUSHING CONNECTION FOAM INDUCTOR UNIT HOSE NOZZLE HYDRANT MEZZ DECK HYDRANT MEZZ DECK HYDRANT MEZZ DECK N5 3"-WF-18-27-0427-B94A-N 3"-WF-18-27-0430-B94A-N 3"-WF-18-27-0426-B94A-N 3"-WF-18-27-0433-B94A-N 2"-WS-18-26-0014-B94-N 3"-WF-18-27-0421-B94A-N 3"-WF-18-27-0420-B94A-N 3"-WF-18-27-0424-B94A-N 16"-WF-18-27-0403-B94A-N 3"-WF-18-27-0422-B94A-N 3"-WF-18-27-0419-B94A-N 3"-WF-18-27-0423-B94A-N 4"-WF-18-27-0407-B94A-N 12"-WF-18-27-0416-B94A-N 12"-WF-18-27-0414-B94A-N 16"-WF-18-27-0490-B94A-N 3"-WF-18-27-0428-B94A-N 3"-WF-18-27-0432-B94A-N 12"-WF-18-27-0409-B94A-N 12"-WF-18-27-0411-B94A-N 3"-WF-18-27-0429-B94A-N 3"-WF-18-27-0434-B94A-N 4"-WF-18-27-0408-B94A-N 16"-WF-18-27-0406-B94A-N 4"-WF-18-27-0932-B94-N 4"-WF-18-27-0407-B94A-N 16"-WF-18-27-0406-B94A-N 16"-WF-18-27-0406-B94A-N 4"-WF-18-27-0417-B94A-N 4"-WF-18-27-0431-B94A-N SP 42/9 FP-1818.01 FP-1801.01 FP-1802.01 EQUIPMENT No. NAME SPRINKLER CONTROL VALVE PACKAGE G-53 3" 3" FP-1810.01 FP-1815.01 FP-1817.01 FP-1814.01 1" FP-1815.02 FP-1814.02 FP-1814.03 FP-1806.01 FP-1802.02 FP-1801.02 FP-1818.02 SP 42/5 SP 42/10 SP 42/6 SP 42/7 SP 42/8 3" 16" HV-181701.01 V-18874 3" HV-185317 V-18875 HV-185311 V-18870 V-18871 3" 3" V-18872 12" V-18866 V-18867 12" 3" V-18859 3" V-18858 3" V-18857 HV-180201.02 4" V-18861 16" V-18864 16" V-18860 16" V-18865 16" V-18862 V-18863 HV-185313 HV-185313 3"-WF-18-27-0436-B94-N HV-185312 16" V-18868 16" 16" 4" V-18873 HYDRANT UPPER DECK FOAM IV 26 Dec 2025 SB MN AD PK ISSUED FOR REVIEW 1A DESCRIPTION DRAWING NUMBER REFERENCE DRAWINGS 3" 3" V-18848 HV-185302 HV-185301 16" 16" 3" V-18869 HV-185309 V-18847 3" V-18876 V-18846 4" 16" 16" 12" 16" 16" 4" 3" 12" 1" 3" 3" 1" N.T.S PROJECT No. SCALE REV. DATE DESCRIPTION BY CHK SD REV. APPD 11594 DRAWING TITLE: PROJECT TITLE: DRAWING No. : CONSULTANT/CONTRACTOR/VENDOR: P.O. Box. 113917 Abu Dhabi, U.A.E SHT. SIZE : A1 THE INFORMATION/DESIGN CONTAINED ON THIS DRAWING IS CONFIDENTIAL. IT MUST NOT BE COPIED, GIVEN AWAY, LENT OR MADE AVAILABLE TO A THIRD PARTY WITHOUT THE WRITTEN CONSENT OF ADNOC Offshore. ALL THE WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE CONTRACT SPECIFICATION. EXPLANATIONS OF ABBREVIATIONS, SYMBOLS ETC. ARE GIVEN IN ADNOC Offshore CODES OF PRACTICE. AS BUILT RECOVERY PHASE II (PACKAGE 6: ABK) DRAWING No. BUDGET REF. 11594 APPD NOTES V-18845 V-18849 HV-180101.01 TO/FROM KPP VIA BRIDGE 5065 AD-09-D-100025-SHT-001 3" 3" THIS DRAWING SUPERSEDES TOTAL ABK DWG. NO. N-A18-LC-PID-27-002-16 REV-3 AD-82-D-100001 TO AD-82-D-100005 P&ID LEGEND, SYMBOLS & INSTRUMENT DETAILS N-A18-PR-PID-00-002-27837 INSTRUMENT LOOPS - LONG FORM HV-181401.02 HV-185316 HV-185315 16" 1. HIGH POINT VENTS AND LOW POINT DRAINS AS REQUIRED. 2. INSTRUMENT LOOPS ARE SHOWN IN SHORT FROM ONLY, FOR LONG FORM SEE DRG NO. N-A18-PR-PID-00-002-27837. 3. FOAM HYDRANT ARRANGEMENT. 4. FILTER PERFORATION SIZE 3.2 MM. 5. REFER TO VENDOR P&ID FOR DETAILS OF SPRINKLER CONTROL VALVE PACKAGE. 6. SPRINKLER VALVE TO BE LOCATED AT MINIMUM OF 15M FROM FISK BEING PROTECTED. 7. HYDRANT TWIN VALVE ARRANGEMENT. 8. INSTRUMENT AIR SUPPLY REQUIRED FOR PACKAGE (SUPPLY BY INSTRUMENTS). G-1853 1 188802 PG 008815 HDNKP 1 008801 HDNKP 1 008802 HDNKP 1 2F 2F 1 188801 PALL 1 188802 PALL 1 188802 PAH 2 188802 PAH 3 188802 PAH 1 188815 PAH 1 188801 PAH 1 188801 PSL 1A 188801 PG 1 188801 RO 1 188801 PSLL 1B 188801 PG 1 188802 PAL 1 188801 PAL 1 188802 PSL 1A 188802 PG 1 188802 PSLL 1B 188802 PG 1 188802 RO 2 188802 PSH 2 188802 PG C 188802 RO D 188802 RO F 188802 RO E 188802 RO 3 188802 PG 3 188802 PSH B 188815 RO A 188815 RO 1 188815 PSH 1 188815 PG 1 188801 PSH B 188801 RO A 188801 RO 1 188801 PG B 188802 RO A 188802 RO 1 188802 PSH S S S S S FROM FIRE WATER DISTRIBUTION 123 AD-18-D-100003-SHT-001 TO CELLAR DECK WEST CENTRAL AREA 181 AD-18-D-100003-SHT-006 TO CELLAR DECK EAST CENTRAL AREA 182 AD-18-D-100003-SHT-006 TO CELLAR DECK DEDICATED EQUIPMENT 183 AD-18-D-100003-SHT-006 TO MEZZANINE DECK DEDICATED EQUIPMENT 184 AD-18-D-100003-SHT-006 TO SUB CELLAR DECK 185 AD-18-D-100003-SHT-006 INSTRUMENT AIR SUPPLY FROM PLATFORM 1571 AD-18-D-100034-SHT-001 INSTRUMENT AIR SUPPLY FROM PLATFORM 1562 AD-18-D-100034-SHT-001 INSTRUMENT AIR SUPPLY FROM DELUGE SKID G-1850.B MEZZ PROTECTION 1595 AD-18-D-100003-SHT-004 1. DELUGE INITIATED ALSO ON CONFIRMED GAS. 2. REFER TO FIRE & GAS LAYOUTS. P&ID LEGEND, SYMBOLS & INSTRUMENT DETAILS AD-82-D-100001 TO AD-82-D-100005 SITE WALKTHROUGH DONE ON 03 JUN 2024 THIS DRAWING SUPERSEDES TOTAL ABK DWG. NO. N-A18-LC-PID-27-002-26 REV-3 1. LINE / PIPING COMPONENT TO BE VERIFIED AGAINST INTELLIGENT 3D MODEL. HOLDS: HOLD 1 HOLD 1 PIPING INST. INST. PIPING PIPING INST. PIPING INST. PIPING INST. INST. PIPING INST. PIPING PIPING INST. PIPING INST. PIPING INST. PIPING INST. INST. PIPING DSOV-188815.2 DSOV-188814.3 DSOV-188815.3 NOTE 2 NOTE 2 FRESHWATER PRIMING LO NC 1" LO 1A ABU AL BUKHOOSH SUPER COMPLEX - AREA 18 NEW KPP (NKPP) AUTOMATIC VALVE MANIFOLD (G-1850.A) PIPING AND INSTRUMENTATION DIAGRAM FILE NAME: AD-18-D-100003-SHT-002.pid AD-18-D-100003-SHT-002 8"-WF-18-27-0501-B94-N 8"-WF-18-27-0551-B94-N FALLING 8"-WF-18-27-0451-B94-N 8"-WF-18-27-0452-B94-N N11 IV 26 Dec 2025 SB MN AD BA ISSUED FOR REVIEW 1A 1/2" RISING RISING RISING RISING RISING PSET=4.50 barg FALLING N9 1/2" 1/2" N2 N1 PSET=5.50 barg F&G PLC F&G PLC F&G PLC F&G PLC F&G PLC F&G PLC F&G PLC F&G PLC F&G PLC F&G PLC F&G PLC F&G PLC LO 1 188801 PSV 6L 1 188801 PCV PSET=5.50 barg PNEUMATIC FIRE DETECTION SUB. CELLAR DECK PNEUMATIC FIRE DETECTION CELLAR DECK PSET=4.50 barg LO LO LO HV-188801.11 HV-188815.11 LO N3 N4 N5 N6 N7 N8 N12 N10 1/2" 1/2" 1/2" B94 B94A 8"-WF-18-27-0502-B94-N DESCRIPTION DRAWING NUMBER REFERENCE DRAWINGS 8"-WF-18-27-0602-B94-N 8"-WF-18-27-0485-B94-N LO 12"-WF-18-27-0415-B94-N 2" 1 188802