ADDITIONAL INFO 1525 N Columbia St, Naperville, IL 60563 4 (+1 bsmt) bd / 2.1 ba | 2,241 sqft | 0.23 acres Features & Misc Info ● Exterior Features: Professional grade landscaping, paver patio, fully fenced-in backyard, mature trees, vegetable garden, & shed. ● Interior Features: New hardwood floors, completely refreshed paint, lighting, semi-open floorplan, 1st flr bedroom (or office/den), abundant natural light, and custom sunroom. Age of Systems & Major Items ● Kitchen Remodel: 2017 ● Bath Remodels: 2016 (half); 2019 (master); 2020 (2nd flr hall) ● Roof: 2010 (best estimate) ● Siding: 2021 (painted) ● Refrigerator: 2017 ● Stove/Oven: 2017 ● Dishwasher: 2020 ● A/C Condenser: 1996 ● Water Heater: 2019 ● Furnace: 2017 ● Washer: Unknown ● Dryer: 2018 ● Water Filtration Systems: 2020 ● Sump Pump: 2014 (best estimate) ● Electrical System Upgrade : 2016 **See next page for a complete list of improvements invested into the home by the current owners. Distance To / From Property ● Downtown Naperville - 1.9 miles (5-min drive) ● Naperville Metra (4th Ave Station) - 1.5 miles (5-min drive) ● Jewel-Osco Grocery - 1.1 miles (3-min drive) ● Starbucks - 1.0 miles (5-min drive) ● Beebe Elementary School - 0.9 miles (2-min drive / 15-min walk) ● Jefferson Jr High School - 0.5 miles (2-min drive / 9-min walk) ● Naperville North High School - 1.5 miles (4-min drive) ● Arrowhead Park - 0.2 (4-min walk) IMPROVEMENTS YR COMPLETED New Entryway Tile 2016 Updated Main Flr Powder Room 2016 Installed Crown Molding 2016 Pro. Painted Kitchen Cabinets & New hardware 2017 New Carpet - Fam Rm, Office, Bsmt 2017 New Paint - walls, trim, and Doors 2017 New Furnace 2017 Installed Inline Air Booster Fan 2017 New Microwave 2017 New Oven/Range 2017 New Refrigerator 2017 Installed Pro Landscaping 2017 New Dryer 2018 Updated Dining Room Light Fixture 2018 Added Recessed Lights - Kitch, Fam Rm 2019 New Water Heater 2019 Added Ceiling fans - Bdrms (all) 2019 Updated Master Bath 2019 New Dishwasher 2020 Updated Entryway - added bench and hooks 2020 Updated Switches, Outlets, Covers 2020 Updated Toilets (all) 2020 Updated 2nd Flr Hall Bath 2020 New Exterior Paint 2021 Installed Exterior Lighting 2021 Installed Hardwood flooring (Main flr) 2021 New Kitch Sink Faucet 2021